Skip to content

Compare moats

Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.

comparing Cerebras Systems×IREN×Alibaba Group× maximum of 3 — remove one to swap
Cerebras Systems CBRS ai moat: latest change 2026-05-14 IREN IREN ai moat: latest change 2026-08-27 Alibaba Group BABA ai moat: latest change 2026-05-20
Moat rating narrow

One-of-a-kind silicon sold to very few buyers: the IPO prospectus discloses G42 at 24.0% of 2025 revenue (85.0% in 2024), MBZUAI at 62.0% of 2025 revenue, and a December 2025 MRA with OpenAI representing 'a substantial portion of our projected revenues over the next several years' — against a competitive field the same document names as NVIDIA, AMD, Intel, hyperscaler accelerators and the major clouds.

source: sec.gov

none

The FY2026 10-K (filed 2026-08-27) shows IREN holds an input the industry competes on: it names 'access to secured and energized power' first among what it believes are the principal competitive factors in its industry, and reports 'executed grid connection agreements, letters of agreement or equivalents representing approximately 5GW of total power capacity' in the United States, Canada, Spain and Australia as of June 30, 2026. It does not claim an advantage over rivals in that input. It says 'Certain competitors may have access to more competitively priced power, a greater access to power and a better capacity to timely secure grid connections,' and 'Many of our competitors have greater financial, technical or commercial resources, longer cloud operating histories or larger customer bases, compared to us.' Operating AI Cloud Services capacity was approximately 40MW at June 30, 2026, and the stored XBRL fundamentals from this 10-K show an FY2026 operating loss of about $1,046.7M on revenue of about $707.0M, so no durable advantage is yet demonstrated.

source: sec.gov

wide

The FY2026 20-F rests on two entrenched positions: a commerce ecosystem the filing ties to 'the world's largest online retail market' with 'over 1.1 billion Internet users,' and a cloud business whose 'Cloud Intelligence Group's external revenue growth accelerated to 40% in the final quarter of fiscal 2026, with AI-related products accounting for 30% of this revenue.' Two durable franchises under one roof is a wide moat — bounded by China regulation and US ICTS cloud controls the same filing flags.

source: sec.gov

Moat type intangibles ip

Wafer-scale integration is the moat's substance: the prospectus contrasts the WSE-3's 4 trillion transistors on 46,225 mm² of silicon with NVIDIA's B200 at 208 billion on roughly 1,600 mm² — a commercial chip category with one occupant.

source: sec.gov

none

The FY2026 10-K's asserted advantage is control from owning its data centers, 'including the associated land, grid connections and substations', which it believes allows it 'to benefit from more sustainable cash flows and operational flexibility relative to operators that rely upon third-party colocation services or short-term land leases'. Its only scale language is a belief that its 'procurement scale, deployment experience and direct control over the data center layer' lets it bring new compute into service 'rapidly and at scale', a deployment-speed claim, and it 'generally target[s]' regions with 'low-cost and attractive renewable energy sources', a siting target rather than a demonstrated cost position. It does not claim a cost or scale lead: it says 'Many of our competitors are larger, have longer operating histories and significantly greater resources than we do' and that certain competitors 'may have access to more competitively priced power, a greater access to power and a better capacity to timely secure grid connections.' There is no network effect or lock-in either, since existing contracts have 'terms ranging from month to month up to five years'. No enumerated moat source is grounded.

source: sec.gov

network effects

The 20-F names 'the network effects of our ecosystems' among the factors its business depends on: Taobao and Tmall, Alipay, Amap and the rest compound as buyers, sellers and services reinforce each other across one integrated ecosystem.

source: sec.gov

Leadership clear leader

Scoped to the category the record supports: wafer-scale integration has no other commercial occupant per the prospectus's own comparison, and the Q2 release claims — attributed, via AMD and AWS partnerships — leadership in disaggregated inference, a technique the prospectus defines.

source: sec.gov

behind

The 10-K lists IREN's competitors as hyperscalers (Amazon Web Services, Google Cloud, Microsoft Azure, Oracle Cloud) and specialized AI Cloud Services providers (CoreWeave, Nebius, Crusoe, Lambda, Nscale, SpaceX and others). It says IREN began providing AI Cloud Services in 2024 and cites its 'shorter operating history in AI Cloud Services relative to some competitors', and states 'Some of our competitors have longer operating histories, larger customer bases, more comprehensive IP portfolios and patent protections, more design wins, and greater financial, sales, marketing and distribution resources than we do.' Operating AI Cloud Services capacity was approximately 40MW at June 30, 2026. The filing describes a smaller, later entrant that trails some competitors on operating history, customer base and resources, with its progress so far resting on two anchor contracts (a ~$9.7B five-year Microsoft agreement and a ~$3.4B five-year NVIDIA contract) rather than any claimed category position.

source: sec.gov

clear leader

The 20-F claims leadership in applied AI ('strengthened our leadership in applied AI') and roots the commerce business in the world's largest online retail market; Alibaba Cloud is the leading China hyperscaler pivoting to AI, per the segment discussion — a category leader in both its home markets.

source: sec.gov

Pricing power moderate

The CFO states Q2 'significantly improved core gross and operating margins compared to a year ago' — improving, from a base where three named customers hold most of the revenue and the leverage that comes with it.

source: sec.gov

weak

The 10-K's risk factors state 'Our competitors' products, services and technologies may be cheaper or provide better functionality or features than ours, which has resulted and may in the future result in lower-than-expected selling prices or demand for our products.' They also say long-term contract pricing 'is generally fixed or agreed at the time of contracting', so if market pricing for comparable capacity rises during a contract's term 'we will not benefit from those increases with respect to capacity already committed under our existing long-term contracts', and that if customers suffer a downturn or discontinue its services it 'may be compelled to offer more flexible terms, lower our prices or risk losing a significant customer.' The stored XBRL fundamentals from this 10-K show FY2026 revenue of about $707.0M against an operating loss of about $1,046.7M, so there is no margin record yet that evidences pricing power.

source: sec.gov

moderate

Ecosystem lock-in and cloud scale support pricing, but the filing warns that if 'user activity and engagement in our ecosystem may decrease … our market share and profitability may be negatively affected,' and Chinese e-commerce/cloud competition is intense — real but capped pricing power.

source: sec.gov

Summary

Cerebras bet that AI compute should be one enormous chip rather than many small ones — 'quantities of compute and memory never before assembled on a single commercial chip,' avoiding 'the latency and the power-draw induced by the traditional approach,' in the prospectus's words — and is converting that bet into an inference cloud: Q2 2026 cloud revenue grew 281% with 600 MW of data center capacity under contract and $25.4 billion of remaining performance obligations. The concentration that funded the bet is the risk that remains: two related-party Gulf customers were 86% of 2025 revenue between them, with the OpenAI MRA now layered on top.

Per its FY2026 10-K, IREN is a vertically integrated AI Cloud Services platform that owns the data center, compute and software layers, underpinned by executed grid connection agreements, letters of agreement or equivalents representing ~5GW and a further multi-GW development pipeline. Its commercial record is concentrated: a five-year Microsoft agreement (~$9.7B total contract value, Horizon 1 delivered and accepted in August 2026, Horizons 2-4 targeted for delivery in phases in calendar Q4 2026) and a five-year ~$3.4B NVIDIA cloud contract together make up a substantial majority of contracted revenue. It holds NVIDIA Preferred Partner and Exemplar Cloud status (HGX B300 and GB300 NVL72) and a strategic partnership intended to support the deployment over time of up to 5GW of NVIDIA DSX-aligned infrastructure, which the filing cites among arrangements that are non-binding or subject to conditions, with no assurance as to the extent of deployments. Against that, the filing names hyperscaler and specialized competitors (AWS, Google Cloud, Azure, Oracle, CoreWeave, Nebius, Crusoe, Lambda, Nscale, SpaceX), many of which it says have greater resources, customers that can use or develop their own solutions, and possible delays to Texas energization from changes to ERCOT's Batch Zero procedures, so the power position is not a demonstrated advantage over rivals and its value depends on execution.

Alibaba is a commerce network and an AI cloud fused into one ecosystem. The retail side draws its moat from network effects the filing names explicitly, rooted in the world's largest online retail market; the cloud side is pivoting hard into AI — Alibaba Cloud's 'growth engine fully pivots from traditional compute and storage to models, AI compute, and agent services,' anchored by the in-house Qwen family (Qwen3.7-Max 'specifically engineered for agents') and the PAI platform. The 20-F's own framing is 'leading full-stack capabilities across the AI value chain.' The counterweights are structural rather than competitive: a Cayman VIE structure, China's regulatory environment, and the US Commerce Department's proposed ICTS cloud-computing controls the filing discloses.

Chain position

Layer-4 wafer-scale accelerators plus an inference cloud — hardware vendor and specialized cloud in one node.

Downstream AI-cloud operator: owns grid-connected data centers and deploys NVIDIA/AMD GPU systems it rents to hyperscalers, frontier labs, AI developers and enterprises (anchor customers Microsoft and NVIDIA).

Layer-8 hyperscaler + AI-application incumbent: Alibaba Cloud supplies AI compute and the Qwen models while the commerce ecosystem is a vast applied-AI distribution surface.

Products (share / barrier)
  • AI Cloud Services (bare metal and managed GPU compute) Unknown · Moderate source: sec.gov
  • AI infrastructure software (Mirantis k0rdent AI) Unknown · Low source: sec.gov
  • Bitcoin mining (in wind-down) Unknown · Low source: sec.gov
  • Owned data centers and grid-connected power portfolio Unknown · Moderate source: sec.gov
Long-horizon vote +0.20 at weight 0.20 · swarm bearish

Editorial prior, not backtested.

see exactly how it voted →

-0.20 at weight 0.20 · swarm bearish

Editorial prior, not backtested.

see exactly how it voted →

+0.38 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →