Compare moats
Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.
| Core Scientific | ASE Technology Holding | |
|---|---|---|
| Moat rating | narrow Core Scientific's position rests on long-dated, take-or-pay leases of energized capacity, not on a protected market. Its 2025 Form 10-K (filed 2026-03-02) says wholesale colocation "typically involves large, long-term agreements with a limited number of customers, often with initial terms of 10 years or more". It adds that such leases are frequently paired with take-or-pay commitments "under which the customer is obligated to pay for leased customer power capacity regardless of utilization, providing operators with revenue visibility over the contract term." On the Q2 2026 call (2026-07-28, https://d1io3yog0oux5.cloudfront.net/_fda3a1f2f1890adaa7ac6c4d9d310971/corescientific/db/1085/11280/prepared_remarks/2Q26+Prepared+Remarks+Transcript+PDF.pdf) management said the company "now has approximately 1.1 gigawatts of total contracted billable capacity, representing more than $24 billion of base contracted revenue". That total combines CoreWeave's 590 MW, on what the CFO called "the 12-year lease terms", with AMD agreements for 530 MW that carry "more than $14 billion of base contracted revenue across the 15-year agreements with 2.5% annual escalators". Management also said it was "currently billing for 437 megawatts of capacity". The limits are just as clear. The 10-K says "Competitors compete on price, facility location, reputation and perceived skill with respect to performance" and that many rivals "are more established, have better brand recognition, are well capitalized". It also says "One customer, CoreWeave, currently accounts for 100% of our Colocation segment revenue." The Q2 2026 10-Q says a material weakness tied to converting mining facilities to HPC "has not been remediated". Long take-or-pay terms are the norm in wholesale colocation, so the contracts alone are contracted revenue, not an edge over rivals. What supports narrow is capacity already billing and a tenant that has expanded in place, and even that is bound to those contracts and to one customer today, so the band is narrow, not wide. | narrow The FY2025 20-F argues ASEH out-competes IDM in-house lines because serving "a large base of customers across a wide range of products" lets it "reduce costs and shorten production cycles through high-capacity utilization and process expertise" and gives its equipment "a longer useful life" — a real but bounded edge, since the same filing calls the global packaging and testing market "highly competitive", notes "most of our customers obtain services from more than one source", flags foundry encroachment ("TSMC has offered advanced packaging technologies such as integrated fan-out"), and warns that "some of our competitors may have superior financial, marketing, manufacturing, research and development and technological resources than we do", offering P.R.C. government support of its domestic semiconductor companies as the example. |
| Moat type | switching costs The lock-in is contractual and physical. The 10-K's description of colocation is that "Customers deploy and manage their own hardware, while the operator designs, builds and operates the underlying infrastructure", under take-or-pay leases "often with initial terms of 10 years or more". On the Q2 2026 call the COO described the AMD program as "an integrated colocation platform engineered to support AMD's Helios Rack-Scale systems" with a "close-coupled AMD design framework". Leaving would mean rebuilding that power, cooling and fit-out elsewhere. The relationship with CoreWeave shows the stickiness: it "began with a 16-megawatt lease at our Austin campus in 2024 and has since expanded to 590 megawatts of total contracted capacity". Intellectual property is not the source. The 10-K says the company has "filed over 130 patent applications" but that these laws and procedures "provide only limited protection". Scale is not the source either: the 10-K says rivals are "well capitalized" and some are organized to lower "their external cost of capital". | cost scale The advantage the 20-F actually claims is unit economics from volume, not lock-in: specialization and "economies of scale by providing services to a large base of customers", high capacity utilization spreading "relatively high fixed costs", and equipment that lasts longer because of the breadth of the order book. Capital intensity reinforces it — the filing says "semiconductor businesses are capital intensive and require significant investment in expensive equipment manufactured by a limited number of vendors", with the equipment market itself "characterized by intense demand, limited supply, and long delivery cycles". |
| Leadership | fast follower No independent share or rank was found. The 10-K lists Aligned Data Centers, Compass Datacenters, Equinix, Digital Realty Trust, NTT, QTS, Switch, Vantage Data Centers and CyrusOne as HDC competitors and says "Many of these competitors are more established, have better brand recognition, are well capitalized". It separately names Applied Digital, Cipher Mining, Galaxy Digital, Hut 8, IREN and TeraWulf as miners converting facilities for AI and HPC customers. Against that field Core Scientific is scaling quickly from a small base: 437 MW billing and about 1.1 GW contracted at the Q2 2026 call. That makes it a fast follower behind larger incumbents. Its press releases describe the company as "a leader in designing, building and operating large scale, purpose-built data centers", but that is the company's own claim and is not counted. | co leader The 20-F calls ASEH "a leading provider of semiconductor manufacturing services in assembly and testing" and "a market leader in SiP technologies from design to assembly with high-volume manufacturing", and says it has "established ourselves as a leader through the successful introduction of leading-edge advanced packaging solutions, which have played a pivotal role in bringing advanced ASIC and HBM products to the marketplace" — but the hedged "we believe we are among the leaders in such packaging processes and technologies", alongside named consolidating rivals (Jiangsu Changjiang Electronics Technology/STATS ChipPAC, Amkor/J-Devices, Tianshui Huatian Technology/Unisem) and TSMC's InFO, describes shared rather than sole leadership. |
| Pricing power | moderate Price is set competitively at signing and then locked in. The 10-K says "Competitors compete on price" and warns that "If we fail to accurately estimate the factors upon which we base our contract pricing, we may generate less profit than expected or incur losses on those contracts". Once signed, the AMD agreements carry "2.5% annual escalators" (Q2 2026 call), and the Q2 2026 10-Q says "power costs are passed through to our customer without markup". To win AMD, the company also gave AMD "market-priced warrants to purchase Core Scientific's common stock, subject to certain commercial conditions" (AMD release, 2026-07-28, https://investors.corescientific.com/news-events/press-releases/detail/138/core-scientific-and-amd-announce-infrastructure-partnership). In Q2 2026, colocation revenue was $136,669 thousand and the cost of colocation services was $56,686 thousand, including $35,073 thousand of power fees passed through to the customer (10-Q). Contracted escalators protect price over a 12- to 15-year term, but nothing shows a premium over rivals, so pricing power is moderate. | weak The 20-F states the industry has "a general trend toward declining prices for products and services of a given technology over time" and that ASEH's own "average selling prices of our packaging and testing services have experienced sharp declines" under "intense price competition". FY2025 consolidated gross margin was 17.7% (up from 16.3%), and management attributes the gain to "higher packaging and testing revenue mix and higher factory utilization" rather than price; the EMS half earned a 9.2% gross margin on raw-material costs equal to 78.7% of EMS revenue, and the five largest customers supplied 46.5% of 2025 operating revenues. |
| Summary | Core Scientific began as a bitcoin miner and is turning its sites into high-density colocation (HDC) data centres for AI and HPC tenants. At 31 December 2025 it owned or leased ten data centres across seven U.S. states, with "approximately 1.4 gigawatts ("GW") of gross utility power capacity, or approximately 920 megawatts ("MW") of total leasable customer power capacity", and it intends "to convert every megawatt in our portfolio to high-density colocation infrastructure over the next three years" (2025 10-K). The transition is now visible in the numbers: colocation revenue "represented 77% of total revenue" in the first half of 2026, against 12% a year earlier (Q2 2026 10-Q). By July 2026 the company was billing for 437 MW. It had about 1.1 GW contracted with two anchor customers, CoreWeave at 590 MW and AMD at 530 MW (about 380 MW leased directly to AMD and about 150 MW for a neocloud that AMD backs), and AMD holds an exclusive right, under specified conditions, to lease as much as 2 additional gigawatts (Q2 2026 call). Those long take-or-pay contracts, plus energized power at a time when the 10-K says utilities demand "significant collateral postings at contract execution" and large builds take "18 to 24 months, or longer", are the source of a narrow advantage. They do not make a protected franchise. The 10-K names nine established colocation providers and six converted miners as competitors, says competitors "compete on price", and reports that CoreWeave was 100 percent of colocation revenue. The Q2 2026 10-Q says colocation revenue "is concentrated with a single customer" and that the conversion-related material weakness is still unremediated. Build costs are "approximately $11 million to $12 million per megawatt" (Q2 2026 call), and the company expects to finance the AMD build-out through project-level bonds. Core Scientific is rated as having a narrow moat: contract-bound switching costs, with no evidence of a price premium or a scale advantage. | ASEH sells turnkey assembly and test at a scale most captive IDM lines cannot match: the 20-F says it is "involved in all stages of the semiconductor manufacturing process except circuit design and wafer fabrication", and leans on Taiwan, "currently the largest center for outsourced semiconductor manufacturing in the world", plus a "strategic alliance with TSMC", to sit next to the foundries its customers already use. The durable part is cost position from utilization, not customer capture — the filing concedes customers multi-source and that foundries are moving into advanced packaging from above. |
| Chain position | Core Scientific leases powered, liquid-cooled data-centre capacity to AI compute providers: CoreWeave (590 MW) and AMD, including a neocloud that AMD backs (about 530 MW), per the Q2 2026 call. It sits between utilities and GPU cloud operators while it winds down bitcoin self-mining. | Back-end contractor to the AI silicon chain: the 20-F ties its FOCoS, FOCoS-Bridge and 2.5D/3D lines to "ASICs and HBM for HPC, networking, server and AI/ML applications" and "AI accelerators for AI training", and warns that a slowdown in AI demand would leave "lower utilization rates for our specialized equipment". |
| Products (share / barrier) |
|
|
| Long-horizon vote | +0.06 at weight 0.20 · swarm bullish Editorial prior, not backtested. | +0.05 at weight 0.20 · swarm neutral Editorial prior, not backtested. |