Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.

comparing Digital Realty Trust×Broadcom×X-energy× maximum of 3 — remove one to swap
Digital Realty Trust DLR ai moat: latest change 2026-02-13 Broadcom AVGO ai moat: latest change 2025-12-18 X-energy XE ai moat: latest change 2026-08-13
Moat rating narrow

The FY2025 10-K's own competitive record cuts both ways. Item 1 says a "high-quality, highly interconnected global portfolio such as ours could not be easily replicated today on a cost-competitive basis," yet Item 1A concedes that competitors have "significantly greater financial, marketing and other resources and more ready access to capital" and that as rivals keep developing space, "rental rates may be reduced or we may face delays in leasing." A durable advantage that its own filing says new supply can price against is bounded, not unassailable.

source: sec.gov

wide

The FY2025 10-K describes category-leading franchises across a broad semiconductor portfolio plus acquired infrastructure software (VMware, CA, Symantec), with top-five end customers at approximately 40% of net revenue — diversified concentration by AI-supply-chain standards — and the Q3 FY2026 release shows non-GAAP operating margin guided at approximately 66% of revenue while revenue grew 86%.

source: sec.gov

narrow

Real but unbuilt. The Q2 2026 10-Q shows the moat resting on regulatory standing rather than delivered product: the NRC completed the Environmental Assessment for the Dow Long Mott construction permit application on 18 May 2026 with a Finding of No Significant Impact, yet no Xe-100 has been constructed or operated and two counterparties supplied nearly all income, with the U.S. Government at 90.3% and Dow at 4.4% of total revenue and grant income for the three months ended 30 June 2026.

source: sec.gov

Moat type network effects

Item 1 attributes the hard-to-replicate part of the portfolio to connectivity rather than to real estate: "the network density, interconnection infrastructure and connectivity-centric customers in certain of our data centers have led to the organic formation of densely connected data communities that are difficult for competitors to replicate." That community sits on over 232,000 cross connects in over 55 metros, so each network and cloud that lands makes the same building worth more to the next tenant.

source: sec.gov

switching costs

The 10-K describes custom accelerators (XPUs) co-designed for hyperscalers and AI frontier-model companies — multi-year, customer-specific silicon programs — alongside enterprise infrastructure software; both are positions a customer leaves only at high cost.

source: sec.gov

intangibles ip

The IPO prospectus describes an 'intellectual property-driven business model': revenue is to come from technology fees for licensing the proprietary Xe-100 design plus proprietary TRISO-X fuel, and the company states it will not construct, own or operate the power plants. The durable assets are therefore patents and NRC licences, not plant, installed base or scale.

source: sec.gov

Leadership co leader

Item 1 claims the title of "the largest global provider of cloud- and carrier-neutral data center, colocation and interconnection solutions," but the Competition section names Equinix and NTT as operators of properties "similar to ours in some of the same metropolitan areas," plus Global Switch and regional operators abroad — a shared top tier on the company's own telling, not a solitary one.

source: sec.gov

clear leader

The 10-K claims 'category-leading semiconductor and infrastructure software solutions' — the company's own attribution — and the Q3 FY2026 release reports AI semiconductor revenue of $16.7 billion in one quarter, up 221% year over year, a scale no other custom-accelerator design house reports.

source: sec.gov

co leader

The prospectus records X-energy as one of two awardees under the DOE Advanced Reactor Demonstration Program, and it holds the Oak Ridge HALEU fuel-fabrication licence; but it is not the NRC design-approval leader — the NRC issued a standard design approval to NuScale for the US460 small modular reactor, published at 90 FR / Federal Register document 2025-10123 on 4 June 2025, while the Xe-100 is being licensed indirectly through a customer's Part 50 construction permit and holds no design certification or approval of its own.

source: sec.gov

Pricing power strong

FY2025 renewals signed re-priced upward in every bucket — +27.0% on greater-than-1 MW space ($146 to $186 per square foot), +4.6% on 0-1 MW ($268 to $280) and +43.0% on other ($49 to $71) — and MD&A expects average aggregate rental rates on 2026 renewals to be positive against the rates currently paid for the same space "on a GAAP basis and on a cash basis." On costs, the filing says utilities expense "is our largest expense category" and that "the vast majority of the expense is passed directly through to our customers," which it credits with significantly mitigating exposure to power-cost increases rather than removing it. The cap: Item 1A warns competitor development could still force rates down.

source: sec.gov

strong

Q4 FY2026 non-GAAP operating income is guided at approximately 66% of revenue, flat from a year ago, while consolidated revenue is guided up 93% — margin held through a near-doubling of revenue.

source: sec.gov

weak

Nothing has been priced in a market yet. The prospectus states the Xe-100 technology fee is a benchmarking assumption to be 'negotiated on a case by case basis' with no assurance customers will accept the proposed structure, and that Amazon holds first-priority manufacturing queue slots across 2031-2039, a right of first refusal and most-favoured pricing; the 10-Q records a 2025 warrant issued to a related-party customer with a $162.7 million grant-date fair value accounted for as consideration payable to a customer, i.e. a reduction of the transaction price.

source: sec.gov

Summary

Digital Realty rents space, power and connectivity rather than compute: at 2025 year-end its portfolio held 310 data centers and roughly 57.6 million rentable square feet across more than 55 metros in over 30 countries, about 84.7% leased, serving more than 5,000 customers. Two different businesses sit inside that footprint. The greater-than-1 MW wholesale side is a capital-and-power race — 769 MW of projects underway with 64% pre-leased, and land that "could accommodate over 3,500 megawatts of additional data center capacity" — where the 10-K names Equinix, NTT, Global Switch and "various private operators" as rivals and warns that added supply can push rents down. The colocation and interconnection side is the defended half: over 232,000 cross connects and the "densely connected data communities" Item 1 says competitors cannot easily replicate, reinforced by contracts the filing describes as generally running 5-10+ years on large deployments and by improvements "installed at our customers' expense." FY2025 leasing supports that read — renewals signed re-priced +27.0% on greater-than-1 MW space and +4.6% on 0-1 MW — while customer concentration is the offsetting exposure, with the largest customer at roughly 11.7% of annualized recurring revenue.

Broadcom holds two moats under one roof. In AI silicon it is the design partner for custom accelerators and the merchant supplier of the Ethernet switching, NIC, PHY and optical parts that connect them — 'connectivity at scale, within and across AI server racks and across AI data center sites' in the filing's words. In software it owns acquired enterprise franchises. The 10-K's own competition section flags the counterweight: competition is increasing 'as new companies, including some of our customers, enter the markets.'

X-energy's defensible assets today are regulatory and intellectual, not commercial. NRC Special Nuclear Material Licence SNM-7007, issued 13 February 2026 for a 40-year licence period, authorises HALEU fuel manufacture at Oak Ridge, and the company's own prospectus calls it the first-ever Category II nuclear fuel facility licensed in the United States; the Long Mott construction permit application for four Xe-100 reactors has reached its uncontested mandatory NRC hearing, scheduled for 22 September 2026. Neither has yet produced a reactor or a commercial fuel pebble: the prospectus expects TX-1 to be completed in the first half of 2028, and the 10-Q describes present revenue as derived from cost-share agreements such as the DOE ARDP. The HALEU feedstock the fuel depends on is a live dependency rather than a settled advantage — the prospectus states HALEU enrichment services are available only in limited quantities globally and that customers procure the feedstock, and the 10-Q discloses a definitive enrichment agreement with Centrus Energy announced 6 August 2026 under a phased approach with prepayments by X-energy to support Centrus's domestic capacity programme.

Chain position

Landlord to the AI stack — sells the space, power and interconnection that cloud, network and enterprise tenants run compute in (Oracle, IBM, Meta Platforms, AT&T, Comcast and Lumen are among the customers named in Item 1), with roughly 2.9 GW of total in-place IT capacity.

Layer-4 chip supplier twice over: custom accelerators for hyperscalers and the Ethernet switching/optical silicon between every AI rack.

Upstream supplier of reactor technology and TRISO fuel to industrial-heat and data-centre power buyers; it licenses the design and fabricates the fuel rather than owning or operating the plants.

Products (share / barrier)
Long-horizon vote +0.17 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

+0.42 at weight 0.20 · swarm bullish

Editorial prior, not backtested.

see exactly how it voted →

+0.05 at weight 0.20 · swarm neutral

Editorial prior, not backtested.