Compare moats
Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.
| Digital Realty Trust | Cadence Design Systems | |
|---|---|---|
| Moat rating | narrow The FY2025 10-K's own competitive record cuts both ways. Item 1 says a "high-quality, highly interconnected global portfolio such as ours could not be easily replicated today on a cost-competitive basis," yet Item 1A concedes that competitors have "significantly greater financial, marketing and other resources and more ready access to capital" and that as rivals keep developing space, "rental rates may be reduced or we may face delays in leasing." A durable advantage that its own filing says new supply can price against is bounded, not unassailable. | wide The FY2025 10-K competition section names only a short list of full-flow rivals — Synopsys, Ansys (acquired by Synopsys) and Siemens EDA — for a toolset it describes as essential to meeting foundry manufacturing sign-off requirements. |
| Moat type | network effects Item 1 attributes the hard-to-replicate part of the portfolio to connectivity rather than to real estate: "the network density, interconnection infrastructure and connectivity-centric customers in certain of our data centers have led to the organic formation of densely connected data communities that are difficult for competitors to replicate." That community sits on over 232,000 cross connects in over 55 metros, so each network and cloud that lands makes the same building worth more to the next tenant. | switching costs The 10-K states Cadence works with foundry partners to develop process design kits 'to ensure our core EDA products and solutions meet manufacturing sign-off requirements', and licenses software on two-to-three-year time-based terms — so the tools are embedded in a customer's qualified design flow, not bought per project. |
| Leadership | co leader Item 1 claims the title of "the largest global provider of cloud- and carrier-neutral data center, colocation and interconnection solutions," but the Competition section names Equinix and NTT as operators of properties "similar to ours in some of the same metropolitan areas," plus Global Switch and regional operators abroad — a shared top tier on the company's own telling, not a solitary one. | co leader The 10-K calls Virtuoso 'the industry standard for custom and analog IC design' while naming Synopsys, Ansys and Siemens EDA as key competitors across the same markets. |
| Pricing power | strong FY2025 renewals signed re-priced upward in every bucket — +27.0% on greater-than-1 MW space ($146 to $186 per square foot), +4.6% on 0-1 MW ($268 to $280) and +43.0% on other ($49 to $71) — and MD&A expects average aggregate rental rates on 2026 renewals to be positive against the rates currently paid for the same space "on a GAAP basis and on a cash basis." On costs, the filing says utilities expense "is our largest expense category" and that "the vast majority of the expense is passed directly through to our customers," which it credits with significantly mitigating exposure to power-cost increases rather than removing it. The cap: Item 1A warns competitor development could still force rates down. | strong Product and maintenance was 91% of fiscal 2025 revenue under time-based licences 'generally two to three years', with $7.8 billion of contracted but unsatisfied performance obligations at December 31, 2025; SEC-reported operating income in the same filing was 28.2% of revenue. |
| Summary | Digital Realty rents space, power and connectivity rather than compute: at 2025 year-end its portfolio held 310 data centers and roughly 57.6 million rentable square feet across more than 55 metros in over 30 countries, about 84.7% leased, serving more than 5,000 customers. Two different businesses sit inside that footprint. The greater-than-1 MW wholesale side is a capital-and-power race — 769 MW of projects underway with 64% pre-leased, and land that "could accommodate over 3,500 megawatts of additional data center capacity" — where the 10-K names Equinix, NTT, Global Switch and "various private operators" as rivals and warns that added supply can push rents down. The colocation and interconnection side is the defended half: over 232,000 cross connects and the "densely connected data communities" Item 1 says competitors cannot easily replicate, reinforced by contracts the filing describes as generally running 5-10+ years on large deployments and by improvements "installed at our customers' expense." FY2025 leasing supports that read — renewals signed re-priced +27.0% on greater-than-1 MW space and +4.6% on 0-1 MW — while customer concentration is the offsetting exposure, with the largest customer at roughly 11.7% of annualized recurring revenue. | Cadence sells the design and sign-off flow that chips must pass to be manufacturable: the 10-K describes foundry-co-developed PDKs, integrated DRC/LVS/STA sign-off, and multi-year time-based licences that leave $7.8 billion of contracted but unsatisfied performance obligations at December 31, 2025. |
| Chain position | Landlord to the AI stack — sells the space, power and interconnection that cloud, network and enterprise tenants run compute in (Oracle, IBM, Meta Platforms, AT&T, Comcast and Lumen are among the customers named in Item 1), with roughly 2.9 GW of total in-place IT capacity. | Upstream design layer: every chip in the graph is designed and signed off through an EDA flow before a foundry will build it. |
| Products (share / barrier) |
|
|
| Long-horizon vote | +0.17 at weight 0.20 · swarm neutral Editorial prior, not backtested. | +0.35 at weight 0.20 · swarm neutral Editorial prior, not backtested. |