Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.

comparing Digital Realty Trust×Cisco Systems×X-energy× maximum of 3 — remove one to swap
Digital Realty Trust DLR ai moat: latest change 2026-02-13 Cisco Systems CSCO ai moat: latest change 2025-09-03 X-energy XE ai moat: latest change 2026-08-13
Moat rating narrow

The FY2025 10-K's own competitive record cuts both ways. Item 1 says a "high-quality, highly interconnected global portfolio such as ours could not be easily replicated today on a cost-competitive basis," yet Item 1A concedes that competitors have "significantly greater financial, marketing and other resources and more ready access to capital" and that as rivals keep developing space, "rental rates may be reduced or we may face delays in leasing." A durable advantage that its own filing says new supply can price against is bounded, not unassailable.

source: sec.gov

narrow

The FY2025 10-K shows a moat that still pays but no longer compounds: total gross margin of 64.9% and remaining performance obligations of $43,533 million (up 6%) against a Networking product category that fell from $34,570 million in fiscal 2023 to $29,229 million in fiscal 2024 to $28,304 million in fiscal 2025, and a product gross-margin bridge in which 'Product pricing' subtracted 1.6 percentage points. All of the reported category growth came from Splunk-carrying lines - Security +59% and Observability +26%. Real and durable, but bounded: narrow, not wide.

source: sec.gov

narrow

Real but unbuilt. The Q2 2026 10-Q shows the moat resting on regulatory standing rather than delivered product: the NRC completed the Environmental Assessment for the Dow Long Mott construction permit application on 18 May 2026 with a Finding of No Significant Impact, yet no Xe-100 has been constructed or operated and two counterparties supplied nearly all income, with the U.S. Government at 90.3% and Dow at 4.4% of total revenue and grant income for the three months ended 30 June 2026.

source: sec.gov

Moat type network effects

Item 1 attributes the hard-to-replicate part of the portfolio to connectivity rather than to real estate: "the network density, interconnection infrastructure and connectivity-centric customers in certain of our data centers have led to the organic formation of densely connected data communities that are difficult for competitors to replicate." That community sits on over 232,000 cross connects in over 55 metros, so each network and cloud that lands makes the same building worth more to the next tenant.

source: sec.gov

switching costs

The durable piece is the contracted annuity attached to installed equipment: total remaining performance obligations of $43,533 million, of which $21,961 million is services and $21,810 million is long-term (recognised beyond twelve months), carried at a services gross margin of 68.5% that has risen for three consecutive years from 66.4% and 68.1%. Customers keep paying for support on gear they already run.

source: sec.gov

intangibles ip

The IPO prospectus describes an 'intellectual property-driven business model': revenue is to come from technology fees for licensing the proprietary Xe-100 design plus proprietary TRISO-X fuel, and the company states it will not construct, own or operate the power plants. The durable assets are therefore patents and NRC licences, not plant, installed base or scale.

source: sec.gov

Leadership co leader

Item 1 claims the title of "the largest global provider of cloud- and carrier-neutral data center, colocation and interconnection solutions," but the Competition section names Equinix and NTT as operators of properties "similar to ours in some of the same metropolitan areas," plus Global Switch and regional operators abroad — a shared top tier on the company's own telling, not a solitary one.

source: sec.gov

co leader

The 10-K names no competitor and discloses no market share anywhere in Management's Discussion and Analysis. The positional facts it does give are scale and direction: Networking product revenue of $28,304 million in fiscal 2025 - by far the largest of its four categories - but down $6.3 billion from fiscal 2023, with channel partner financing volume falling from $32.1 billion to $27.1 billion to $24.9 billion across fiscal 2023-2025.

source: sec.gov

co leader

The prospectus records X-energy as one of two awardees under the DOE Advanced Reactor Demonstration Program, and it holds the Oak Ridge HALEU fuel-fabrication licence; but it is not the NRC design-approval leader — the NRC issued a standard design approval to NuScale for the US460 small modular reactor, published at 90 FR / Federal Register document 2025-10123 on 4 June 2025, while the Xe-100 is being licensed indirectly through a customer's Part 50 construction permit and holds no design certification or approval of its own.

source: sec.gov

Pricing power strong

FY2025 renewals signed re-priced upward in every bucket — +27.0% on greater-than-1 MW space ($146 to $186 per square foot), +4.6% on 0-1 MW ($268 to $280) and +43.0% on other ($49 to $71) — and MD&A expects average aggregate rental rates on 2026 renewals to be positive against the rates currently paid for the same space "on a GAAP basis and on a cash basis." On costs, the filing says utilities expense "is our largest expense category" and that "the vast majority of the expense is passed directly through to our customers," which it credits with significantly mitigating exposure to power-cost increases rather than removing it. The cap: Item 1A warns competitor development could still force rates down.

source: sec.gov

moderate

The product gross-margin bridge attributes fiscal 2025's 0.2-point improvement to productivity (+2.0 points) and mix (+1.1 points) while 'Product pricing' subtracted 1.6 points; a legal dispute with a supplier cost a further 0.8 points. Total gross margin of 64.9% (product 63.7%, services 68.5%) is held by cost and mix, not by price.

source: sec.gov

weak

Nothing has been priced in a market yet. The prospectus states the Xe-100 technology fee is a benchmarking assumption to be 'negotiated on a case by case basis' with no assurance customers will accept the proposed structure, and that Amazon holds first-priority manufacturing queue slots across 2031-2039, a right of first refusal and most-favoured pricing; the 10-Q records a 2025 warrant issued to a related-party customer with a $162.7 million grant-date fair value accounted for as consideration payable to a customer, i.e. a reduction of the transaction price.

source: sec.gov

Summary

Digital Realty rents space, power and connectivity rather than compute: at 2025 year-end its portfolio held 310 data centers and roughly 57.6 million rentable square feet across more than 55 metros in over 30 countries, about 84.7% leased, serving more than 5,000 customers. Two different businesses sit inside that footprint. The greater-than-1 MW wholesale side is a capital-and-power race — 769 MW of projects underway with 64% pre-leased, and land that "could accommodate over 3,500 megawatts of additional data center capacity" — where the 10-K names Equinix, NTT, Global Switch and "various private operators" as rivals and warns that added supply can push rents down. The colocation and interconnection side is the defended half: over 232,000 cross connects and the "densely connected data communities" Item 1 says competitors cannot easily replicate, reinforced by contracts the filing describes as generally running 5-10+ years on large deployments and by improvements "installed at our customers' expense." FY2025 leasing supports that read — renewals signed re-priced +27.0% on greater-than-1 MW space and +4.6% on 0-1 MW — while customer concentration is the offsetting exposure, with the largest customer at roughly 11.7% of annualized recurring revenue.

The installed base still switches slowly - but the filing does not claim it is winning the AI datacenter on the strength of that base. The fiscal 2025 Networking decline is attributed to 'product shipments returning to normalized levels during the first half of fiscal 2025 from the elevated levels ... in the first half of fiscal 2024', to servers, and to 'a decline in campus switching' - normalisation, not disclosed share loss, so the whitebox/Arista thesis is not something this 10-K either confirms or denies. What the filing does disclose is the shape of the AI dollar Cisco is actually winning: Americas service provider and cloud growth 'driven by AI infrastructure revenue from webscale customers', funded by additional purchase commitments 'related to manufacturing Cisco Silicon One and other products to meet demand from webscale and other customers', which 'significantly increased our supply chain exposure, which has resulted in negative impacts to our product gross margin in recent periods and may result in further negative impacts in future periods'. Enterprise switching earns 63.7% product gross margin; webscale silicon costs margin to serve. The moat is intact where the annuity is and thin where the growth is.

X-energy's defensible assets today are regulatory and intellectual, not commercial. NRC Special Nuclear Material Licence SNM-7007, issued 13 February 2026 for a 40-year licence period, authorises HALEU fuel manufacture at Oak Ridge, and the company's own prospectus calls it the first-ever Category II nuclear fuel facility licensed in the United States; the Long Mott construction permit application for four Xe-100 reactors has reached its uncontested mandatory NRC hearing, scheduled for 22 September 2026. Neither has yet produced a reactor or a commercial fuel pebble: the prospectus expects TX-1 to be completed in the first half of 2028, and the 10-Q describes present revenue as derived from cost-share agreements such as the DOE ARDP. The HALEU feedstock the fuel depends on is a live dependency rather than a settled advantage — the prospectus states HALEU enrichment services are available only in limited quantities globally and that customers procure the feedstock, and the 10-Q discloses a definitive enrichment agreement with Centrus Energy announced 6 August 2026 under a phased approach with prepayments by X-energy to support Centrus's domestic capacity programme.

Chain position

Landlord to the AI stack — sells the space, power and interconnection that cloud, network and enterprise tenants run compute in (Oracle, IBM, Meta Platforms, AT&T, Comcast and Lumen are among the customers named in Item 1), with roughly 2.9 GW of total in-place IT capacity.

Supplies networking into AI datacenters: the 10-K ties Americas service provider and cloud growth to 'AI infrastructure revenue from webscale customers' and to Cisco Silicon One manufacturing commitments.

Upstream supplier of reactor technology and TRISO fuel to industrial-heat and data-centre power buyers; it licenses the design and fabricates the fuel rather than owning or operating the plants.

Products (share / barrier)
  • Cisco Silicon One and webscale AI infrastructure Challenger · Low source: sec.gov
  • Collaboration (Webex Suite, devices, Contact Center, CPaaS) Challenger · Low source: sec.gov
  • Networking (switching, routing, wireless, servers) Leader · Moderate source: sec.gov
  • Observability (Splunk Observability Suite, ThousandEyes) Niche · Moderate source: sec.gov
  • Security (Splunk TDR, SASE, network security) Top 3 · Moderate source: sec.gov
  • Technical support and services Leader · Deep source: sec.gov
Long-horizon vote +0.17 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

+0.13 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

+0.05 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →