Skip to content

Compare moats

Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.

comparing GitLab×Equinix×Schneider Electric× maximum of 3 — remove one to swap
GitLab GTLB ai moat: latest change 2026-08-05 Equinix EQIX ai moat: latest change 2026-02-11 Schneider Electric SBGSY ai moat: latest change 2026-03-27
Moat rating narrow

The FY2026 10-K (year ended 2026-01-31) shows real expansion inside the installed base: 118% Dollar-Based Net Retention, Base Customers up to 10,682 from 9,893, customers above $100,000 of ARR up to 1,456 from 1,229, and $1.0 million ARR customers "to 155 from 123, an increase of 26%". But the filing concedes "limited barriers to entry" and names "Microsoft Corporation, which owns GitHub" as principal competitor. Retention decelerates (130% FY2024, 123% FY2025, 118% FY2026), and since DBNR is reported "on a threshold basis of 130%," the FY2024 figure is a cap and the slide is steeper than it looks. Narrow, not wide: expansion must be re-won against a bundled hyperscaler.

source: sec.gov

wide

The FY2025 10-K (filed 2026-02-11) grounds the advantage in an asset that took 27 years to assemble and that a competitor cannot buy: "Over our 27-year history, we have curated a diverse, industry-leading ecosystem of more than 500,000 interconnections", "over 10,500 customers, including 2,000+ network service providers and a leading market share of cloud-on ramps", across "280 data centers, in 77 markets in 36 countries", with "99.9999%+ operational uptime" delivered in 2025 and no single customer at 10% of revenue. Because the value of each IBX rises with who else is already inside it, incumbency compounds rather than decays. The counterweight is real and disclosed: Item 1A says "The global multi-tenant data center market is highly fragmented. It is estimated that we are one of more than 2,400 companies that provide these offerings around the world", and warns that competitors "may adopt aggressive pricing policies". That caps the pricing that the moat converts into, not its durability — the fragmentation sits in commodity space-and-power, while the interconnection density the filing describes has no comparable substitute. FY2025 revenue of $9.217B with operating margin recovering to 20.0% from 15.2% in FY2024 is consistent with the incumbency holding.

source: sec.gov

wide

In its 2025 Universal Registration Document the Group states a #1 market position in electrical distribution in each of its four end markets, plus #1 in grid and #1 in industrial data and safety, reached through a channel it sizes at more than 1.4 million contractors and electricians alongside panel builders, integrators and distributors; FY2025 closed with a record-high backlog of EUR 25,362 million and, per the CFO section, a fifth consecutive year of profitability expansion, with adjusted EBITA margin at 18.7% (+50bps organic).

source: download.schneider-electric.com

Moat type switching costs

Stickiness comes from platform embedding, not IP. The 10-K rests differentiation on "our single platform with a unified data model," on "Consolidation of multiple tools into a single platform," and on deployment inside the customer's own perimeter for regulated buyers. Replacement means re-integrating a toolchain and re-certifying compliance. IP is the wrong label: only "16 issued patents and 25 pending patent applications," plus open-source licenses granting "broad permissions to use, copy, modify, and redistribute." The no-lock-in claim is the filing's own characterisation, footnoted to a Forrester study "commissioned by GitLab."

source: sec.gov

network effects

The 10-K names the mechanism itself, twice and unprompted: "As more customers choose Equinix for high connectivity and performance reliability at the metro edge, it benefits their suppliers and business partners to colocate in the same data centers and connect directly with each other. This adjacency creates a network effect that attracts new customers while continuously enhancing our value proposition to existing customers", and in the Competitive Landscape section, "This ecosystem creates a network effect that improves performance and lowers the cost for our customers". The evidence is the count of participants rather than any patent or unit-cost claim — 500,000+ interconnections, 2,000+ network service providers, a leading share of cloud on-ramps, an Internet Exchange the filing calls "the largest global peering solution". Switching costs are a genuine second layer (fixed-duration contracts billed on space and power, physical cross connects into resident counterparties), but they are what holds a customer already inside the ecosystem; the reason to enter in the first place is who is already there.

source: sec.gov

switching costs

The URD's own durability table assigns a Reference Service Life of 20 years to low-voltage equipment and 15 years to medium-voltage products, and the Group monetizes that installed stock repeatedly: it attributes Field Services growth to an increasing installed base, notably from Data Center, and reports recurring revenue at 79% of its agnostic-software revenues (AVEVA, ETAP, RIB), up 2 points year on year, with AVEVA ARR up +12% as of December 31, 2025.

source: download.schneider-electric.com

Leadership fast follower

The 10-K positions GitLab against a leader rather than as one: "Our principal competitor is Microsoft Corporation, which owns GitHub." Competition reads from the challenger side, differentiating "from GitHub through flexible deployment options that work within enterprise security and compliance requirements, LLM neutrality with self-hosted gateway support" and an open core model. On AI it follows: Duo Agent Platform went "Generally available in January 2026," the last month of the fiscal year. What keeps it a follower rather than behind is cadence, "a new version of our software every month for 172 months in a row," plus a regulated-deployment franchise a SaaS-first rival does not cover.

source: sec.gov

clear leader

Leadership is claimed on interconnection, not on square footage, and the filing's own evidence is about density: "our position is unmatched in the industry" is supported by 2,000+ resident network service providers, "a leading market share of cloud-on ramps", 500,000+ interconnections and an Internet Exchange described as "the largest global peering solution", across 36 countries. The band is read against neutral, ecosystem-dense colocation, where that footprint has no direct analogue. It is deliberately not read against total data centre capacity: the same 10-K puts Equinix among "more than 2,400 companies" in a "highly fragmented" MTDC market, and Item 1A concedes the company must compete for land and power against "new market entrants" drawn in by AI.

source: sec.gov

clear leader

The URD's end-market pages report #1 positions in electrical distribution across all four end markets, #1 in grid, #1 in industrial data and safety, and the most complete data-center portfolio including liquid cooling. These are the Group's own stated positions rather than a third-party ranking, and the same document names ABB, Legrand, Siemens, Eaton, Emerson, Honeywell, Johnson Controls, Rockwell Automation, Fuji Electric, Mitsubishi Electric and Yokogawa as the peer panel it is benchmarked against for TSR, a panel its compensation policy characterizes as business competitors.

source: download.schneider-electric.com

Pricing power moderate

FY2026 gross margin was 87% against 89%, with cost of revenue up $35.6 million "primarily due to an increase of $18.4 million in third party hosting costs for SaaS and cloud usage," and management expects SaaS and Duo mix to bring costs that "may adversely impact our gross margins." Strain is explicit: GitLab "may be required to reduce our prices," competitors "may offer their products and services at a lower price or for free," and it "implemented user limits on our free SaaS product." Power retained: Premium lists at $29 per user/month billed annually, and seats bundle $12 and $24 of GitLab Credits. But "A majority of our subscriptions are on a one-year period."

source: sec.gov

moderate

Contract structure supports price: fixed-duration agreements billed on space and power plus per-connection interconnection fees, an installed base too physically entangled to move cheaply, and 99.9999%+ uptime in 2025 as the thing being paid for. FY2025 revenue of $9.217B grew about 5% on FY2024's $8.748B while operating margin recovered to 20.0% from 15.2%, so pricing and cost were at least held. But the filing itself refuses the strong band: competitors "may adopt aggressive pricing policies, especially if they are not highly leveraged or have lower return thresholds than we do. As a result, we may suffer from pricing pressure that would adversely affect our ability to generate revenues", and some rivals bundle communications or cloud services against bare colocation. Power procurement is a further pass-through risk the filing flags. Price is defended, not dictated.

source: sec.gov

moderate

Price is real but has not been covering input costs. FY2025 gross margin fell to 42.1%, down 40bps organic, with the URD stating that accelerating Q4 product pricing was insufficient to fully offset mix and raw-material cost inflation inclusive of tariffs; in the July 30, 2026 half-year release, gross pricing on products of +EUR 280 million was outweighed by a raw-material impact of -EUR 330 million and net tariffs of -EUR 104 million for a net price impact of -EUR 154 million, and the Group says it expects to be net-price positive only in H2 2026.

source: download.schneider-electric.com

Summary

GitLab sells a single-platform DevSecOps toolchain defended by workflow lock-in rather than intellectual property: a unified data model plus deployment flexibility, including single-tenant "Dedicated for Government with FedRAMP compliance," makes it hard to remove where data residency is contractual. The installed base expands: 118% Dollar-Based Net Retention, 10,682 Base Customers, 1,456 above $100,000 of ARR, 155 above $1.0 million (up 26%), over 70% of ARR from public sector and enterprise. The filing supplies the counterweight: "limited barriers to entry," Microsoft/GitHub as principal competitor, 16 issued patents. Retention (130 to 123 to 118, the 130 a cap), gross margin (89% to 87%) and a January 2026 AI launch point to compression at the commodity end. No source measures market share, so every share band is "unknown".

Equinix is a network-neutral, multi-tenant colocation and interconnection REIT: it does not sell compute, it sells the metro-edge real estate where networks, clouds and enterprises physically meet. The FY2025 10-K describes the platform as "280 data centers, in 77 markets in 36 countries" serving "over 10,500 customers, including 2,000+ network service providers and a leading market share of cloud-on ramps", carrying "more than 500,000 interconnections" curated over 27 years, with 61% of 2025 revenue recognised outside the U.S. Revenue is structurally recurring — infrastructure offerings are "billed based on the space and power a customer consumes" under fixed-duration contracts generating MRR, interconnection is "billed based on the outbound connections from a customer" — and no customer reached 10% of 2025 revenue. AI enters the story as demand rather than as a product: the filing positions Equinix as the interconnect point for "model providers, data platforms, neoclouds and gateways", and pushes core hyperscale capacity into xScale, which is "developed and operated through our joint venture partnership arrangements". The bear case is in the company's own Item 1A. The MTDC market is "highly fragmented", Equinix being "one of more than 2,400 companies"; competitors "may adopt aggressive pricing policies"; the AI build-out invites "significant investments in the data center industry by both current competitors and new investors", after which "we could lose market share" and must "compete against certain of these competitors to secure the land and power needed for our expansion plans". Product extension has also failed before — the filing notes past offerings "have been or are being discontinued, including the Equinix Metal product". The honest reading: the interconnection ecosystem is close to unreplicable and the moat sits there; the capacity business around it is a capital race Equinix enters with scale but no immunity.

Schneider sells electrification, automation and digitalization into four end markets — Data Center & Networks (30% of 2025 orders), Buildings (29%), Industry (27%) and Infrastructure (14%) — and its 2025 URD claims a #1 position in electrical distribution in every one of them, sold through an ecosystem of panel builders, integrators, distributors and more than 1.4 million contractors and electricians. Energy Management is the larger and higher-margin half: EUR 33,130 million of FY2025 revenue, 83% of the Group, up +10.3% organic at a 21.8% adjusted EBITA margin, against EUR 7,022 million and 14.2% at Industrial Automation. In the July 30, 2026 half-year release the Data Center end-market continues to lead growth: Systems, 35% of Q2 revenues, grew +28% organic with prefabricated solutions, cooling technologies and 3-phase UPS all seeing significant growth.

Chain position

GitLab sits at the software-tooling layer, not compute or models. It consumes third-party LLM capacity — marketing "LLM neutrality and support for self-hosted AI gateways, including air-gapped environments" — so it captures no model-layer economics and bears inference as COGS, visible in the $18.4 million rise in hosting costs. Its distinctive position is the regulated perimeter.

Equinix is the neutral meeting point of the AI and cloud supply chain rather than a link in its manufacturing path: it houses other companies' compute and sells the adjacency between them. The 10-K places it between the network layer (2,000+ service providers), the cloud layer ("a leading market share of cloud-on ramps") and enterprise consumers who "assemble these capabilities into operational stacks", and describes an AI ecosystem "of model providers, data platforms, neoclouds and gateways" curated for enterprise AI demand. Core hyperscale training capacity sits beside that, not inside it, in xScale, built with JV partners so hyperscalers "add to their core hyperscale data center deployments and existing customer access points at Equinix". The revenue is therefore levered to AI's distribution and inference edge more than to training-cluster buildout.

Supplies the power and cooling layer beneath AI compute: Data Center & Networks was 30% of 2025 orders, a market the URD places on a market CAGR above 10% from 2025 to 2030.

Products (share / barrier)
  • Enterprise Agile Planning add-on Unknown · Low source: sec.gov
  • GitLab Dedicated (including Dedicated for Government) Unknown · Deep source: sec.gov
  • GitLab DevSecOps Platform (Free, Premium, and Ultimate tiers) Unknown · Moderate source: sec.gov
  • GitLab Duo Agent Platform (with GitLab Credits) Unknown · Low source: about.gitlab.com
  • Self-Managed GitLab (on-premises and hybrid cloud deployment) Unknown · Deep source: sec.gov
Long-horizon vote +0.06 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

+0.38 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

+0.38 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →