Skip to content

Compare moats

Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.

comparing IREN×Bloom Energy×CXMT× maximum of 3 — remove one to swap
IREN IREN ai moat: latest change 2026-08-27 Bloom Energy BE ai moat: latest change 2026-02-09 CXMT 688825.SS ai moat: latest change 2026-08-29
Moat rating none

The FY2026 10-K (filed 2026-08-27) shows IREN holds an input the industry competes on: it names 'access to secured and energized power' first among what it believes are the principal competitive factors in its industry, and reports 'executed grid connection agreements, letters of agreement or equivalents representing approximately 5GW of total power capacity' in the United States, Canada, Spain and Australia as of June 30, 2026. It does not claim an advantage over rivals in that input. It says 'Certain competitors may have access to more competitively priced power, a greater access to power and a better capacity to timely secure grid connections,' and 'Many of our competitors have greater financial, technical or commercial resources, longer cloud operating histories or larger customer bases, compared to us.' Operating AI Cloud Services capacity was approximately 40MW at June 30, 2026, and the stored XBRL fundamentals from this 10-K show an FY2026 operating loss of about $1,046.7M on revenue of about $707.0M, so no durable advantage is yet demonstrated.

source: sec.gov

narrow

FY2025 10-K (Item 1, filed 2026-02-09): a proprietary solid-oxide platform protected by 380 active U.S. utility patents plus 183 pending, with speed-to-power the company says can deliver onsite power 'within approximately 90 days' — real but contested advantages: the same 10-K's Item 1A calls distributed generation and hydrogen 'still emerging markets' whose acceptance is uncertain, and revenue concentration was 43%/13%/12% across three customers in FY2025 (sec.gov/Archives/edgar/data/1664703/000162828026006516/be-20251231.htm).

source: sec.gov

none

CXMT's 2026 interim report (published 2026-08-29) names scale and IDM technology as core competencies, but also concedes gaps. It says that compared with the leading international manufacturers the Company 'still has a certain gap in overall scale, technology accumulation and customer resources' (与国际头部厂商相比,公司在整体规模、技术积累、客户资源等方面仍然存在一定差距). It describes its scale effect as 'gradually emerging' (逐步显现), and its gross-margin risk covers the case where the scale effect cannot materialise over the long term (公司规模效应长期无法显现). Its excess returns span a single shortage. The retained-earnings note shows an accumulated deficit of ¥36.65bn entering 2026, after ¥1.87bn of 2025 net profit attributable to the parent, and the first-half 2025 net loss attributable to shareholders was ¥2.33bn. Then first-half 2026 revenue rose 873.64%, which the report attributes to the global DRAM supply shortage, higher prices and sharply higher volumes, and the main-business gross margin reached 84.84%.

source: static.cninfo.com.cn

Moat type none

The FY2026 10-K's asserted advantage is control from owning its data centers, 'including the associated land, grid connections and substations', which it believes allows it 'to benefit from more sustainable cash flows and operational flexibility relative to operators that rely upon third-party colocation services or short-term land leases'. Its only scale language is a belief that its 'procurement scale, deployment experience and direct control over the data center layer' lets it bring new compute into service 'rapidly and at scale', a deployment-speed claim, and it 'generally target[s]' regions with 'low-cost and attractive renewable energy sources', a siting target rather than a demonstrated cost position. It does not claim a cost or scale lead: it says 'Many of our competitors are larger, have longer operating histories and significantly greater resources than we do' and that certain competitors 'may have access to more competitively priced power, a greater access to power and a better capacity to timely secure grid connections.' There is no network effect or lock-in either, since existing contracts have 'terms ranging from month to month up to five years'. No enumerated moat source is grounded.

source: sec.gov

intangibles ip

The FY2025 10-K states 'Intellectual property is an essential differentiator for our business' and details 380 active U.S. utility patents, 252 active international patents, trade secrets around cell printing, and a purpose-built copy-exact Newark manufacturing facility — the moat rests on proprietary solid-oxide technology and manufacturing know-how, not network effects or locked-in customers (Item 1, Intellectual Property / Manufacturing Facilities).

source: sec.gov

none

On the report's own evidence, no candidate moat source qualifies. Cost scale: the report calls DRAM a highly standardised product (高度标准化的产品) in which the cost advantage of scale is a core competency. But CXMT ranks fourth globally by capacity, and the report, calculating on sales, puts Samsung, SK hynix and Micron at 33.96%, 34.48% and 23.41% of the 2025 global DRAM market, so the scale advantage lies with the leaders. IP: it reports 4,484 domestic patents (3,744 of them invention patents) and 3,400 overseas patents as of 2026-06-30. Yet it describes its core technology as reaching 'international advanced level' (国际先进水平) and flags possible IP disputes with competitors. Switching costs: ¥133.48bn of ¥150.31bn first-half 2026 revenue went through distributors, who under the report's revenue note decide their own resale prices.

source: static.cninfo.com.cn

Leadership behind

The 10-K lists IREN's competitors as hyperscalers (Amazon Web Services, Google Cloud, Microsoft Azure, Oracle Cloud) and specialized AI Cloud Services providers (CoreWeave, Nebius, Crusoe, Lambda, Nscale, SpaceX and others). It says IREN began providing AI Cloud Services in 2024 and cites its 'shorter operating history in AI Cloud Services relative to some competitors', and states 'Some of our competitors have longer operating histories, larger customer bases, more comprehensive IP portfolios and patent protections, more design wins, and greater financial, sales, marketing and distribution resources than we do.' Operating AI Cloud Services capacity was approximately 40MW at June 30, 2026. The filing describes a smaller, later entrant that trails some competitors on operating history, customer base and resources, with its progress so far resting on two anchor contracts (a ~$9.7B five-year Microsoft agreement and a ~$3.4B five-year NVIDIA contract) rather than any claimed category position.

source: sec.gov

clear leader

Scoped to fuel-cell-based onsite power for datacenters: Energy Changemakers (2026-07-04) positions Bloom as the market leader in fuel-cell deployment for AI datacenters — Brookfield framework expanded $5B→$25B, Oracle up to 2.8 GW, Equinix 100+ MW across 19 US datacenters, AEP gigawatt-scale — with FuelCell Energy the named challenger at smaller aggregate scale (~450/380/360 MW deals). In onsite power broadly (vs. turbines and engines) Bloom is one option among several (energychangemakers.com/fuel-cells-gain-ground-in-data-centers/).

source: sec.gov

fast follower

TrendForce (2026-09-24) reports that CXMT's global DRAM revenue share rose to 9.5% in 2Q26 from 7.6% in 1Q26, 'placing it fourth behind Samsung at 39.4%, SK hynix at 24.9%, and Micron at 23.3%'. It is catching up through generation-skipping R&D. The interim report had its fifth process platform in customer certification, and a voluntary disclosure on 2026-09-21 announced that platform's mass production, adding that its products are not yet in scale sales and yields need time to ramp. TrendForce's listing analysis (2026-07-28) still says CXMT 'still trails Samsung, SK hynix, and Micron in advanced processes, product performance, yields, and certification by high-end customers'.

source: static.cninfo.com.cn

Pricing power weak

The 10-K's risk factors state 'Our competitors' products, services and technologies may be cheaper or provide better functionality or features than ours, which has resulted and may in the future result in lower-than-expected selling prices or demand for our products.' They also say long-term contract pricing 'is generally fixed or agreed at the time of contracting', so if market pricing for comparable capacity rises during a contract's term 'we will not benefit from those increases with respect to capacity already committed under our existing long-term contracts', and that if customers suffer a downturn or discontinue its services it 'may be compelled to offer more flexible terms, lower our prices or risk losing a significant customer.' The stored XBRL fundamentals from this 10-K show FY2026 revenue of about $707.0M against an operating loss of about $1,046.7M, so there is no margin record yet that evidences pricing power.

source: sec.gov

moderate

Q2 2026 release: GAAP gross margin 33.4%, up 668 bps YoY, with 34.3% non-GAAP and raised FY26 guidance of ~34% non-GAAP gross margin — margin expansion during a supply-constrained turbine market suggests real but cyclical pricing leverage; the FY2025 10-K frames the core competition as grid electricity and combustion OEMs on cost, which caps pricing through the cycle (sec.gov/Archives/edgar/data/1664703/000162828026050150/ex991_q226financialresults.htm).

source: sec.gov

weak

CXMT is a price taker riding the cycle. The interim report attributes first-half revenue growth to the global DRAM supply shortage, rising prices and sharply higher volumes. It records industry prices between 2015 and 2025 as high as $7.89/GB and as low as $1.78/GB in first-half 2023, and it states that the continued steep price rise is not sustainable. Main-business revenue was ¥15.22bn against cost of ¥13.29bn in first-half 2025, and ¥150.04bn against ¥22.75bn in first-half 2026. Most sales go through distributors, who set their own resale prices.

source: static.cninfo.com.cn

Summary

Per its FY2026 10-K, IREN is a vertically integrated AI Cloud Services platform that owns the data center, compute and software layers, underpinned by executed grid connection agreements, letters of agreement or equivalents representing ~5GW and a further multi-GW development pipeline. Its commercial record is concentrated: a five-year Microsoft agreement (~$9.7B total contract value, Horizon 1 delivered and accepted in August 2026, Horizons 2-4 targeted for delivery in phases in calendar Q4 2026) and a five-year ~$3.4B NVIDIA cloud contract together make up a substantial majority of contracted revenue. It holds NVIDIA Preferred Partner and Exemplar Cloud status (HGX B300 and GB300 NVL72) and a strategic partnership intended to support the deployment over time of up to 5GW of NVIDIA DSX-aligned infrastructure, which the filing cites among arrangements that are non-binding or subject to conditions, with no assurance as to the extent of deployments. Against that, the filing names hyperscaler and specialized competitors (AWS, Google Cloud, Azure, Oracle, CoreWeave, Nebius, Crusoe, Lambda, Nscale, SpaceX), many of which it says have greater resources, customers that can use or develop their own solutions, and possible delays to Texas energization from changes to ERCOT's Batch Zero procedures, so the power position is not a demonstrated advantage over rivals and its value depends on execution.

Bloom's edge is a single solid-oxide platform — 'cell printing, stack assemblies, and column configurations' — that serves both the Energy Server and the Bloom Electrolyzer, protected by 380 active U.S. patents and decades of materials know-how (FY2025 10-K, Item 1). Against its practical competition — grid power, gas reciprocating engines, small gas turbines, and other fuel-cell chemistries (PEM/MCFC/PAFC) — the 10-K claims higher efficiency, no combustion, 99.9% fleet availability on post-2020 non-redundant installs, and deployment in weeks-to-months while turbine OEMs are supply-constrained. That time-to-power window is currently being monetized in AI datacenters: the Q2 2026 release (2026-07-28) reported record revenue of $1,065.4M (+165.5% YoY) and management said all major U.S. hyperscalers have 'validated and approved' Bloom, calling it 'a standard for AI onsite power.' The moat is rated narrow, not wide: the 10-K's own risk factors stress that distributed generation is an emerging market with uncertain acceptance, three customers were 43%/13%/12% of FY2025 revenue, and industry coverage (Energy Changemakers, 2026-07-04) shows FuelCell Energy signing deals of comparable scale — the advantage is a technology-and-execution lead that rivals and turbine capacity additions can compress, not a structural lock.

CXMT (ChangXin) is a Hefei-based IDM that designs and fabricates DDR5 and LPDDR4X/LPDDR5/5X/LPDDR6 memory and sells DRAM wafers, chips and modules. Its 2026 interim report says it reached its fourth process platform through a 'generation-skipping' (跳代研发) R&D strategy, and that it ranks first in China and fourth globally by shipments and sales. First-half 2026 revenue was ¥150.31bn (DDR series ¥69.47bn, LPDDR series ¥78.19bn), with a main-business gross margin of 84.84%. TrendForce puts its 2Q26 DRAM revenue share at 9.5%, up from 7.6% in 1Q26. The position is real but recent. The report concedes gaps to the three leaders in scale, technology and customers. The customers it names are Alibaba Cloud, ByteDance, Tencent, Lenovo, Xiaomi, Transsion, Honor, OPPO and vivo. On 2026-06-08 the US Defense Department added its subsidiary ChangXin Memory to the Section 1260H list. TrendForce notes that export controls leave CXMT relying on DUV multiple patterning rather than EUV, and that its prospectus 'has not disclosed a clear mass-production timetable' for HBM. The report itself warns that the continued steep rise in DRAM prices is not sustainable (价格的持续大幅上涨不具备可持续性) as international makers add capacity.

Chain position

Downstream AI-cloud operator: owns grid-connected data centers and deploys NVIDIA/AMD GPU systems it rents to hyperscalers, frontier labs, AI developers and enterprises (anchor customers Microsoft and NVIDIA).

Onsite prime-power supplier to AI infrastructure: per the FY2025 10-K, AEP is procuring up to 1 GW of Bloom fuel cells for AI datacenter loads, Brookfield established a financing framework (up to $5.0B over five years at signing, per the 10-K) housed in an AI Infrastructure Fund, and SK ecoplant (a ~2.5% Class A holder) distributes and co-assembles in Korea; the Q2 2026 release adds that all major U.S. hyperscalers plus over a dozen neoclouds, AI labs, and colocation operators have approved Bloom's systems.

Upstream DRAM IDM selling wafers, chips and modules to server, smartphone, PC and automotive makers, mostly through distributors (¥133.48bn of ¥150.31bn first-half 2026 revenue).

Products (share / barrier)
  • AI Cloud Services (bare metal and managed GPU compute) Unknown · Moderate source: sec.gov
  • AI infrastructure software (Mirantis k0rdent AI) Unknown · Low source: sec.gov
  • Bitcoin mining (in wind-down) Unknown · Low source: sec.gov
  • Owned data centers and grid-connected power portfolio Unknown · Moderate source: sec.gov
Long-horizon vote -0.20 at weight 0.20 · swarm bearish

Editorial prior, not backtested.

see exactly how it voted →

+0.20 at weight 0.20 · swarm bullish

Editorial prior, not backtested.

see exactly how it voted →

-0.06 at weight 0.20 · swarm bullish

Editorial prior, not backtested.

see exactly how it voted →