Skip to content

Compare moats

Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.

comparing IREN×GitLab×Powell Industries, Inc.× maximum of 3 — remove one to swap
IREN IREN ai moat: latest change 2026-08-27 GitLab GTLB ai moat: latest change 2026-08-05 Powell Industries, Inc. POWL ai moat: latest change 2025-11-19
Moat rating none

The FY2026 10-K (filed 2026-08-27) shows IREN holds an input the industry competes on: it names 'access to secured and energized power' first among what it believes are the principal competitive factors in its industry, and reports 'executed grid connection agreements, letters of agreement or equivalents representing approximately 5GW of total power capacity' in the United States, Canada, Spain and Australia as of June 30, 2026. It does not claim an advantage over rivals in that input. It says 'Certain competitors may have access to more competitively priced power, a greater access to power and a better capacity to timely secure grid connections,' and 'Many of our competitors have greater financial, technical or commercial resources, longer cloud operating histories or larger customer bases, compared to us.' Operating AI Cloud Services capacity was approximately 40MW at June 30, 2026, and the stored XBRL fundamentals from this 10-K show an FY2026 operating loss of about $1,046.7M on revenue of about $707.0M, so no durable advantage is yet demonstrated.

source: sec.gov

narrow

The FY2026 10-K (year ended 2026-01-31) shows real expansion inside the installed base: 118% Dollar-Based Net Retention, Base Customers up to 10,682 from 9,893, customers above $100,000 of ARR up to 1,456 from 1,229, and $1.0 million ARR customers "to 155 from 123, an increase of 26%". But the filing concedes "limited barriers to entry" and names "Microsoft Corporation, which owns GitHub" as principal competitor. Retention decelerates (130% FY2024, 123% FY2025, 118% FY2026), and since DBNR is reported "on a threshold basis of 130%," the FY2024 figure is a cap and the slide is steeper than it looks. Narrow, not wide: expansion must be re-won against a bundled hyperscaler.

source: sec.gov

none

The FY2025 10-K (filed 2025-11-19) says the company believes its integration capabilities, technical and project management acumen, application engineering expertise and specialty contracting experience 'give us a sustainable competitive advantage in our markets', and that 'a significant portion of our business is from repeat customers', many times involving EPC firms 'with whom we often have long, established relationships'. Neither the filing nor Powell's record shows that edge protecting returns. Item 1A warns 'Our industry is highly competitive' and says certain competitors 'may have lower cost structures' and 'may, therefore, be able to provide their products or services at lower prices'. Item 1 says products are 'typically awarded in competitive bid situations' and that projects 'are typically non-recurring.' Stored fundamentals from Powell's filings show operating margin between -4.9% and 7.1% in every fiscal year from FY2011 to FY2022, with operating losses in FY2017 (-$19.3M on $395.9M of revenue) and FY2018 (-$9.1M on $448.7M). Operating margin has since risen to 19.7% in FY2025 ($217.9M on $1,104.3M), but the 10-K credits the gross-margin gain to 'favorable volume leverage and strong project execution in a stable pricing environment', not to a competitive edge. A self-described advantage that left operating margin no higher than 7.1% in any year from FY2011 to FY2022 is not shown to be a moat, so the band is none.

source: sec.gov

Moat type none

The FY2026 10-K's asserted advantage is control from owning its data centers, 'including the associated land, grid connections and substations', which it believes allows it 'to benefit from more sustainable cash flows and operational flexibility relative to operators that rely upon third-party colocation services or short-term land leases'. Its only scale language is a belief that its 'procurement scale, deployment experience and direct control over the data center layer' lets it bring new compute into service 'rapidly and at scale', a deployment-speed claim, and it 'generally target[s]' regions with 'low-cost and attractive renewable energy sources', a siting target rather than a demonstrated cost position. It does not claim a cost or scale lead: it says 'Many of our competitors are larger, have longer operating histories and significantly greater resources than we do' and that certain competitors 'may have access to more competitively priced power, a greater access to power and a better capacity to timely secure grid connections.' There is no network effect or lock-in either, since existing contracts have 'terms ranging from month to month up to five years'. No enumerated moat source is grounded.

source: sec.gov

switching costs

Stickiness comes from platform embedding, not IP. The 10-K rests differentiation on "our single platform with a unified data model," on "Consolidation of multiple tools into a single platform," and on deployment inside the customer's own perimeter for regulated buyers. Replacement means re-integrating a toolchain and re-certifying compliance. IP is the wrong label: only "16 issued patents and 25 pending patent applications," plus open-source licenses granting "broad permissions to use, copy, modify, and redistribute." The no-lock-in claim is the filing's own characterisation, footnoted to a Forrester study "commissioned by GitLab."

source: sec.gov

none

The 10-K describes engineering know-how, not protected technology or lock-in. It says 'We consider our engineering, project management, systems integration and technical support capabilities vital to the success of our business', that 'Powell's expertise in vacuum circuit breaker engineering is internationally recognized', and that unpatented technology, including engineering technical skills and know-how, 'is important to our overall business'. It also says 'we believe that the growth of our business will depend primarily upon the quality of our products and our relationships with our customers, rather than the extent of our patent protection', so patents are not the source. Switching costs are not shown: projects are 'typically awarded in competitive bid situations' and 'typically non-recurring', even though 'a significant portion of our business is from repeat customers'. The same filing says some competitors 'are significantly larger and have substantially greater global resources such as engineering, manufacturing and marketing', so the know-how is a capability rivals also bring to each bid, not a demonstrated moat source; the type is none.

source: sec.gov

Leadership behind

The 10-K lists IREN's competitors as hyperscalers (Amazon Web Services, Google Cloud, Microsoft Azure, Oracle Cloud) and specialized AI Cloud Services providers (CoreWeave, Nebius, Crusoe, Lambda, Nscale, SpaceX and others). It says IREN began providing AI Cloud Services in 2024 and cites its 'shorter operating history in AI Cloud Services relative to some competitors', and states 'Some of our competitors have longer operating histories, larger customer bases, more comprehensive IP portfolios and patent protections, more design wins, and greater financial, sales, marketing and distribution resources than we do.' Operating AI Cloud Services capacity was approximately 40MW at June 30, 2026. The filing describes a smaller, later entrant that trails some competitors on operating history, customer base and resources, with its progress so far resting on two anchor contracts (a ~$9.7B five-year Microsoft agreement and a ~$3.4B five-year NVIDIA contract) rather than any claimed category position.

source: sec.gov

fast follower

The 10-K positions GitLab against a leader rather than as one: "Our principal competitor is Microsoft Corporation, which owns GitHub." Competition reads from the challenger side, differentiating "from GitHub through flexible deployment options that work within enterprise security and compliance requirements, LLM neutrality with self-hosted gateway support" and an open core model. On AI it follows: Duo Agent Platform went "Generally available in January 2026," the last month of the fiscal year. What keeps it a follower rather than behind is cadence, "a new version of our software every month for 172 months in a row," plus a regulated-deployment franchise a SaaS-first rival does not cover.

source: sec.gov

at parity

The 10-K gives no share or rank. It says Powell competes 'with a small number of multinational competitors', naming ABB, Eaton, Schneider and Siemens Industries, and that some are 'significantly larger and have substantially greater global resources'. It adds that bid evaluation varies 'from project to project', covering technical support, engineering and manufacturing capability, equipment rating, delivered value, scheduling and price. Powell therefore competes bid by bid alongside those multinationals rather than leading the category.

source: sec.gov

Pricing power weak

The 10-K's risk factors state 'Our competitors' products, services and technologies may be cheaper or provide better functionality or features than ours, which has resulted and may in the future result in lower-than-expected selling prices or demand for our products.' They also say long-term contract pricing 'is generally fixed or agreed at the time of contracting', so if market pricing for comparable capacity rises during a contract's term 'we will not benefit from those increases with respect to capacity already committed under our existing long-term contracts', and that if customers suffer a downturn or discontinue its services it 'may be compelled to offer more flexible terms, lower our prices or risk losing a significant customer.' The stored XBRL fundamentals from this 10-K show FY2026 revenue of about $707.0M against an operating loss of about $1,046.7M, so there is no margin record yet that evidences pricing power.

source: sec.gov

moderate

FY2026 gross margin was 87% against 89%, with cost of revenue up $35.6 million "primarily due to an increase of $18.4 million in third party hosting costs for SaaS and cloud usage," and management expects SaaS and Duo mix to bring costs that "may adversely impact our gross margins." Strain is explicit: GitLab "may be required to reduce our prices," competitors "may offer their products and services at a lower price or for free," and it "implemented user limits on our free SaaS product." Power retained: Premium lists at $29 per user/month billed annually, and seats bundle $12 and $24 of GitLab Credits. But "A majority of our subscriptions are on a one-year period."

source: sec.gov

weak

The 10-K says gross margin rose to 29% of revenue in FY2025 from 27% in FY2024, 'due to favorable volume leverage and strong project execution in a stable pricing environment'. The 10-Q for the quarter ended June 30, 2026 (https://www.sec.gov/Archives/edgar/data/80420/000008042026000107/powl-20260630.htm) gives the same reason for 30% in the first nine months of FY2026, so neither filing credits price. Before this upcycle, stored fundamentals from Powell's filings show gross margin between 12.8% and 21.6% in every fiscal year from FY2011 to FY2022 (FY2022: $85.0M of gross profit on $532.6M of revenue, about 16%), which fits cyclical volume leverage more than pricing power. The limits are explicit: the 10-K says 'Fixed-price contracts can limit our ability to pass these increases to our customers', and Item 1A says certain competitors 'may, therefore, be able to provide their products or services at lower prices'. The one offset is cost pass-through, not price-setting: the 10-K says 'we believe we can manage this volatility through contract pricing adjustments'. Pricing power is rated weak.

source: sec.gov

Summary

Per its FY2026 10-K, IREN is a vertically integrated AI Cloud Services platform that owns the data center, compute and software layers, underpinned by executed grid connection agreements, letters of agreement or equivalents representing ~5GW and a further multi-GW development pipeline. Its commercial record is concentrated: a five-year Microsoft agreement (~$9.7B total contract value, Horizon 1 delivered and accepted in August 2026, Horizons 2-4 targeted for delivery in phases in calendar Q4 2026) and a five-year ~$3.4B NVIDIA cloud contract together make up a substantial majority of contracted revenue. It holds NVIDIA Preferred Partner and Exemplar Cloud status (HGX B300 and GB300 NVL72) and a strategic partnership intended to support the deployment over time of up to 5GW of NVIDIA DSX-aligned infrastructure, which the filing cites among arrangements that are non-binding or subject to conditions, with no assurance as to the extent of deployments. Against that, the filing names hyperscaler and specialized competitors (AWS, Google Cloud, Azure, Oracle, CoreWeave, Nebius, Crusoe, Lambda, Nscale, SpaceX), many of which it says have greater resources, customers that can use or develop their own solutions, and possible delays to Texas energization from changes to ERCOT's Batch Zero procedures, so the power position is not a demonstrated advantage over rivals and its value depends on execution.

GitLab sells a single-platform DevSecOps toolchain defended by workflow lock-in rather than intellectual property: a unified data model plus deployment flexibility, including single-tenant "Dedicated for Government with FedRAMP compliance," makes it hard to remove where data residency is contractual. The installed base expands: 118% Dollar-Based Net Retention, 10,682 Base Customers, 1,456 above $100,000 of ARR, 155 above $1.0 million (up 26%), over 70% of ARR from public sector and enterprise. The filing supplies the counterweight: "limited barriers to entry," Microsoft/GitHub as principal competitor, 16 issued patents. Retention (130 to 123 to 118, the 130 a cap), gross margin (89% to 87%) and a January 2026 AI launch point to compression at the commodity end. No source measures market share, so every share band is "unknown".

Powell designs, builds and services custom-engineered power-distribution packages: power control rooms, E-Houses, switchgear and medium-voltage breakers. Its FY2025 10-K says the company believes its integration, project-management and application-engineering capabilities 'give us a sustainable competitive advantage in our markets', and that a significant portion of its business comes from repeat customers, often through EPC firms with which it has long relationships. The record does not show that edge protecting returns. Work is typically won in competitive bids, projects are typically non-recurring, and the 10-K names ABB, Eaton, Schneider and Siemens Industries as principal competitors, some of which it calls significantly larger. The company says it believes growth depends on product quality and customer relationships rather than patents. Stored fundamentals from Powell's filings show operating margin between -4.9% and 7.1% in every fiscal year from FY2011 to FY2022, with operating losses in FY2017 and FY2018. In the current cycle, gross margin reached 29% in FY2025 (10-K) and 30% in the first nine months of FY2026 (10-Q, quarter ended June 30, 2026, https://www.sec.gov/Archives/edgar/data/80420/000008042026000107/powl-20260630.htm). Both filings attribute that to favorable volume leverage and strong project execution 'in a stable pricing environment', not to price increases. The same 10-Q reports backlog of $2.4 billion and says diversification into electric utility and data centers 'has reduced the cyclicality of our business.' It also cautions that as data center projects become a larger component of backlog and revenues, the product mix may shift, 'as such projects will likely require less custom engineered-to-order equipment and systems than other end markets', which is the custom-engineering skill the claimed edge rests on.

Chain position

Downstream AI-cloud operator: owns grid-connected data centers and deploys NVIDIA/AMD GPU systems it rents to hyperscalers, frontier labs, AI developers and enterprises (anchor customers Microsoft and NVIDIA).

GitLab sits at the software-tooling layer, not compute or models. It consumes third-party LLM capacity — marketing "LLM neutrality and support for self-hosted AI gateways, including air-gapped environments" — so it captures no model-layer economics and bears inference as COGS, visible in the $18.4 million rise in hosting costs. Its distinctive position is the regulated perimeter.

Supplies custom-engineered switchgear and power control rooms to oil and gas, utility and commercial/industrial projects. Its Q3 FY2026 bookings included 'a data center project valued at over $400 million' (10-Q, quarter ended June 30, 2026, https://www.sec.gov/Archives/edgar/data/80420/000008042026000107/powl-20260630.htm).

Products (share / barrier)
  • AI Cloud Services (bare metal and managed GPU compute) Unknown · Moderate source: sec.gov
  • AI infrastructure software (Mirantis k0rdent AI) Unknown · Low source: sec.gov
  • Bitcoin mining (in wind-down) Unknown · Low source: sec.gov
  • Owned data centers and grid-connected power portfolio Unknown · Moderate source: sec.gov
  • Enterprise Agile Planning add-on Unknown · Low source: sec.gov
  • GitLab Dedicated (including Dedicated for Government) Unknown · Deep source: sec.gov
  • GitLab DevSecOps Platform (Free, Premium, and Ultimate tiers) Unknown · Moderate source: sec.gov
  • GitLab Duo Agent Platform (with GitLab Credits) Unknown · Low source: about.gitlab.com
  • Self-Managed GitLab (on-premises and hybrid cloud deployment) Unknown · Deep source: sec.gov
Long-horizon vote -0.20 at weight 0.20 · swarm bearish

Editorial prior, not backtested.

see exactly how it voted →

+0.06 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

-0.06 at weight 0.20 · swarm bearish

Editorial prior, not backtested.

see exactly how it voted →