Compare moats
Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.
| MiTAC Holdings | GE Vernova | |
|---|---|---|
| Moat rating | none The 2025 annual report (English version filed with TWSE on 2026-05-08) shows fast growth without a protected position. Revenue rose about 72% to NT$105.577 billion while gross profit rose 63%. One customer, Customer A, took 67% of 2025 net sales, up from 56% in 2024, and one supplier, Supplier C, provided 41% of purchases. The report says standard rack-mount server technology "has been relatively mature and there are a large number of ODM firms", and its risk section says "The supply of key components remains dependent on overseas suppliers, and experience in hardware–software integration is still developing". The May 2026 investor deck shows gross margin at 9% in 1Q26, down from 12% in 1Q25. Global Market Insights' AI server ranking (published September 2026) does not name MiTAC among the five largest vendors. No durable advantage is evidenced. | wide FY2025 10-K (filed 2026-01-29): the installed base generates approximately 25% of the world's electricity; the Power segment carries ~$94.4B of remaining performance obligations with ~1,800 of ~7,000 installed gas turbines under long-term service agreements averaging ~10 years of remaining contract life; and the filing states demand is 'exceeding available capacity' for its products — a contracted, decade-scale service annuity on proprietary installed equipment. |
| Moat type | none No single moat source is evidenced. The report describes a business that follows others' platforms: it aligns "with product specifications led by leading technology players", and says that, with mature technology and many ODM firms, "differentiation strategy emerged as the vital issue for all R&D designers". R&D was NT$3.597 billion, about 3% of revenue, and the report counts 200 patents in Taiwan, 197 in mainland China and 222 in Europe, the US and Japan, excluding MiTAC Digital; a patent count alone does not show a barrier. The nearest thing to a switching cost is the depth of its main customer relationship, with Customer A at 67% of sales, and the report says a global cloud platform customer gave MiTAC Computing a 2025 Outstanding Supplier Award. A concentration that large is as much a dependency as a lock-in. | switching costs 10-K: ~1,800 gas turbines under long-term service agreements with ~10-year average remaining life, plus services agreements on ~24,000 of ~59,000 installed onshore wind turbines — service revenue is contractually tied to GE Vernova's own installed fleet; the filing adds it derives 'a sustained competitive advantage both from our IP portfolio as well as technical know-how embedded in our products and manufacturing techniques developed over decades'. |
| Leadership | behind No independent tracker ranks MiTAC, and the sources that rank the market leave it out. Global Market Insights' AI server page (published September 2026) names Supermicro, Dell Technologies, Wiwynn, HPE and Inspur as the top five, "which collectively held a market share of 56% in 2025", and names QCT, Lenovo, Foxconn and Wistron among other ODM and OEM participants; it does not mention MiTAC. A US brokerage channel check reported by TechNews (2026-05-12) covers Foxconn, Quanta and Wistron as the three major GB200/GB300 rack assemblers. The annual report's own market-share section gives no share or rank, only "over 20 years of experience in server R&D, design and manufacturing", and its long-term plan is to "solidify our position as a major ODM/OEM for server systems". It also concedes that its hardware–software integration experience "is still developing". Outside the leading group. | co leader 10-K opens with 'GE Vernova is a global leader in the electric power industry' and its installed base generates ~25% of world electricity, but the filing names peer-scale competitors in every segment — Siemens Energy in both Power and Electrification, Mitsubishi Power, Vestas, Hitachi Energy, Schneider Electric, ABB — so co-leader across the portfolio rather than clear leader. |
| Pricing power | weak The May 2026 investor deck gives gross profit margins of 12% in 2024, 11% in 2025, 12% in 1Q25 and 9% in 1Q26, with 1Q26 gross profit up 6% on revenue up 35%. The annual report shows 2025 gross profit up 63% on revenue up 72%. The Taipei Times (2026-05-29) reports that MiTAC Computing's president named shortages and rising prices of DRAM chips, solid-state drives and CPUs as this year's pressure. He said whether the company can secure enough key components and ship on schedule "would directly affect gross margins and operating performance". Margins falling as volume grows, with one customer taking 67% of sales. | strong 10-K: 'increasing demand exceeding available capacity', Electrification customer lead-times 'increased as a result of demand outstripping supply', and both Power and Electrification state they adjust pricing 'in line with market demand, inflation, and industry dynamics'; trade press (Power Engineering, 2026-04-23) reported new gas-turbine order pricing in H1 2026 tracking 10-20 points higher on a dollar-per-kilowatt basis than Q4 2025 orders. |
| Summary | MiTAC Holdings is a Taiwanese holding company. Its server arm, MiTAC Computing Technology, made 90.1% of 1Q26 revenue of NT$31.86 billion, with MiTAC Digital Technology (dashcams, fleet management and edge AI devices) at 7.8% and MiTAC International at 2.1% (Taipei Times, 2026-05-29). 2025 revenue rose about 72% to NT$105.577 billion on demand from hyperscale data centers and cloud service providers, and the annual report shows a single customer, Customer A, taking 67% of net sales. MiTAC Computing sells under its own brand, which since October 2024 combines the TYAN, former Intel DSG and MiTAC OCP server lines, and as an ODM. It is moving into liquid-cooled AI racks, with a Hanoi factory in mass production and two US factories due to start operating in the third quarter of 2026. The report itself calls standard server technology relatively mature, with a large number of ODM firms. The weak point is pricing power: gross margin was 12% in 2024, 11% in 2025 and 9% in 1Q26 (May 2026 investor deck), and MiTAC Computing's president said securing key components amid shortages would directly affect gross margins. A fast-growing supplier that depends on one customer and has no protected position. | GE Vernova's moat rests on its installed base: the FY2025 10-K states its equipment generates approximately 25% of the world's electricity, with ~7,000 installed gas turbines (~1,800 under long-term service agreements averaging ~10 years of remaining life) and ~$94.4B of Power-segment remaining performance obligations. The filing reports demand 'exceeding available capacity', lengthening Electrification lead-times 'as a result of demand outstripping supply', and pricing adjusted with demand — scarcity trade press later quantified as new gas-turbine order pricing tracking 10-20 points higher per kW in H1 2026 than Q4 2025, with only ~10 GW of production slots left across 2029-2030 (Power Engineering, 2026-04-23). The moat is not uniform: the 10-K risk section flags intensifying competition as manufacturers from China 'improve quality and reliability and pursue markets outside their home countries', and Offshore Wind is delivering its backlog under project-cost and execution pressure, compounded by the U.S. Interior Department's December 22, 2025 pause of leases for all large-scale U.S. offshore projects under construction, which directly impacted the Vineyard Wind timeline. Nuclear adds optionality: the 10-K cites an SMR deployment agreement it calls 'the first commercial contract of its kind in North America' via its joint ventures with Hitachi. |
| Chain position | Server designer and manufacturer selling under its own MiTAC Computing brand and as an ODM. The annual report places it downstream of IC and component makers and lists CPU/chipset, HDD, DRAM, PCB, IC and PSU as key components. The US took NT$74.138 billion of 2025 sales of NT$105.577 billion. | Power supplier to the AI buildout: the 10-K states gas power serves 'rising electricity demand from hyperscalers and data centers' and Electrification benefits from orders to electrify data centers 'playing a key role in the development of artificial intelligence (AI)'; trade press (Power Engineering, 2026-04-23) put roughly 20% of the ~100 GW of gas capacity under contract as explicitly tied to data-center load. |
| Products (share / barrier) |
|
|
| Long-horizon vote | -0.20 at weight 0.20 · swarm neutral Editorial prior, not backtested. | +0.35 at weight 0.20 · swarm neutral Editorial prior, not backtested. |