Skip to content

Compare moats

Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.

comparing NetApp×X-energy×Cadence Design Systems× maximum of 3 — remove one to swap
NetApp NTAP ai moat: latest change 2026-06-05 X-energy XE ai moat: latest change 2026-08-13 Cadence Design Systems CDNS ai moat: latest change 2026-02-19
Moat rating narrow

The FY2026 10-K shows a real, durable lock but not an unassailable one. On the durable side: "Our cloud storage services are based on the same ONTAP data management software that underpins our on-premises ONTAP storage infrastructure offerings", and the same filing's income statement shows the company holding a gross margin near 71% across all three reported years - $4,433M on $6,268M in FY2024, $4,613M on $6,572M in FY2025 and $4,899M on $6,925M in FY2026 - while revenue grew from $6,268M to $6,925M and income from operations widened from 19% to 24% of net revenues. Holding that margin through the memory-cost shock the same filing discloses is the commercial evidence the lock is worth something. On the limiting side, the filing says competition "is intense", that in public cloud "customers may choose native cloud services that are consumed as operating expenses", and that "New competitors or alliances among existing competitors could emerge and quickly gain significant market share" - and IDC's 1Q26 external-storage tracker (Blocks & Files, 2026-06-16, cited on the AFF/ASA product row below) ranks NetApp second behind Dell, not first.

source: sec.gov

narrow

Real but unbuilt. The Q2 2026 10-Q shows the moat resting on regulatory standing rather than delivered product: the NRC completed the Environmental Assessment for the Dow Long Mott construction permit application on 18 May 2026 with a Finding of No Significant Impact, yet no Xe-100 has been constructed or operated and two counterparties supplied nearly all income, with the U.S. Government at 90.3% and Dow at 4.4% of total revenue and grant income for the three months ended 30 June 2026.

source: sec.gov

wide

The FY2025 10-K competition section names only a short list of full-flow rivals — Synopsys, Ansys (acquired by Synopsys) and Siemens EDA — for a toolset it describes as essential to meeting foundry manufacturing sign-off requirements.

source: sec.gov

Moat type switching costs

The FY2026 10-K makes the source of the advantage explicit and it is the cost of leaving the data-management layer, not a network or a patent estate. The same ONTAP software runs the on-premises arrays and the cloud services ("Our cloud storage services are based on the same ONTAP data management software that underpins our on-premises ONTAP storage infrastructure offerings"), and the AFF family "allows customers to connect to clouds for more data services, data tiering, caching, and disaster recovery". A customer's volume layout, snapshot and replication workflow and operating tools therefore carry from the array into Azure, AWS and Google rather than being abandoned at the cloud boundary — the filing describes NetApp as "the only provider of enterprise-grade storage services natively embedded in the world's largest public cloud providers", so the usual moment of escape is instead the moment the relationship renews.

source: sec.gov

intangibles ip

The IPO prospectus describes an 'intellectual property-driven business model': revenue is to come from technology fees for licensing the proprietary Xe-100 design plus proprietary TRISO-X fuel, and the company states it will not construct, own or operate the power plants. The durable assets are therefore patents and NRC licences, not plant, installed base or scale.

source: sec.gov

switching costs

The 10-K states Cadence works with foundry partners to develop process design kits 'to ensure our core EDA products and solutions meet manufacturing sign-off requirements', and licenses software on two-to-three-year time-based terms — so the tools are embedded in a customer's qualified design flow, not bought per project.

source: sec.gov

Leadership co leader

IDC's 1Q26 external enterprise storage systems tracker, as reported by Blocks & Files on 2026-06-16 (cited in full on the AFF/ASA product row below), ranks NetApp second worldwide behind Dell and ahead of Everpure, Huawei and HPE, attributing the placing to "its growing all-flash business and cloud-integrated data management". Second of five ranked vendors, in a market whose leader is someone else, is a shared front rank rather than an owned one - and the distinct claim NetApp makes in the FY2026 10-K is positional rather than volumetric: being "the only provider of enterprise-grade storage services natively embedded in the world's largest public cloud providers".

source: sec.gov

co leader

The prospectus records X-energy as one of two awardees under the DOE Advanced Reactor Demonstration Program, and it holds the Oak Ridge HALEU fuel-fabrication licence; but it is not the NRC design-approval leader — the NRC issued a standard design approval to NuScale for the US460 small modular reactor, published at 90 FR / Federal Register document 2025-10123 on 4 June 2025, while the Xe-100 is being licensed indirectly through a customer's Part 50 construction permit and holds no design certification or approval of its own.

source: sec.gov

co leader

The 10-K calls Virtuoso 'the industry standard for custom and analog IC design' while naming Synopsys, Ansys and Siemens EDA as key competitors across the same markets.

source: sec.gov

Pricing power moderate

It holds price rather than raising it. On the figures filed with the FY2026 10-K, gross margin was 70.7% of revenue in FY2024 ($4,433M on $6,268M), 70.2% in FY2025 ($4,613M on $6,572M) and 70.7% in FY2026 ($4,899M on $6,925M) - flat across three years in which revenue grew from $6,268M to $6,925M - and it held that level while absorbing a component-cost shock. It is no stronger than that because the filing's own risk factor lists "competitive pricing, customer price sensitivity" and "pricing and discounting pressures" among the drivers of gross margin, and discloses that the company "experienced inflationary pressure and supply chain constraints beginning in the second half of fiscal 2026, resulting in increased costs for memory and other components, which have affected our gross margins" - a cost shock it is absorbing rather than fully passing on.

source: sec.gov

weak

Nothing has been priced in a market yet. The prospectus states the Xe-100 technology fee is a benchmarking assumption to be 'negotiated on a case by case basis' with no assurance customers will accept the proposed structure, and that Amazon holds first-priority manufacturing queue slots across 2031-2039, a right of first refusal and most-favoured pricing; the 10-Q records a 2025 warrant issued to a related-party customer with a $162.7 million grant-date fair value accounted for as consideration payable to a customer, i.e. a reduction of the transaction price.

source: sec.gov

strong

Product and maintenance was 91% of fiscal 2025 revenue under time-based licences 'generally two to three years', with $7.8 billion of contracted but unsatisfied performance obligations at December 31, 2025; SEC-reported operating income in the same filing was 28.2% of revenue.

source: sec.gov

Summary

NetApp sells storage hardware but the asset is ONTAP, the data-management software that has run its arrays for over three decades and now also runs inside the three largest public clouds as a first-party service. The FY2026 10-K organises the company into two segments, Hybrid Cloud (AFF and ASA all-flash arrays, AFX for AI workloads, FAS hybrid-flash, E/EF-Series, StorageGRID object storage) and Public Cloud (Azure NetApp Files, Amazon FSx for NetApp ONTAP, Google Cloud NetApp Volumes, Cloud Volumes ONTAP), and states that both rest on the same ONTAP software. That is the whole argument: an enterprise that has standardised its snapshots, replication and multiprotocol access on ONTAP carries those habits with it when it moves workloads to a hyperscaler, and NetApp is paid on both sides of the move. The evidence that the lock has commercial value is the margin's steadiness: across the three years the FY2026 10-K reports, gross margin sat at 70.7%, 70.2% and 70.7% of revenue ($4,433M on $6,268M, $4,613M on $6,572M, $4,899M on $6,925M) while revenue grew, and the filing's own percentage-of-revenue table shows no mix shift doing that work - product and services held near 46% and 54% of revenue throughout. The limits are equally in the filing. NetApp is second, not first: IDC's 1Q26 tracker puts it behind Dell in external enterprise storage, and the 10-K's competition section concedes that cloud providers are simultaneously partners and rivals, that consumption models "may reduce overall demand for our traditional on-premises offerings sold through a capital expenditure (capex) model", and that alternative architectures "may reduce or eliminate demand for some of our offerings". Component exposure is real too: the filing discloses "inflationary pressure and supply chain constraints beginning in the second half of fiscal 2026, resulting in increased costs for memory and other components, which have affected our gross margins", and names NAND among the components whose supply can tighten. This is a durable second place built on software stickiness, not a structural monopoly.

X-energy's defensible assets today are regulatory and intellectual, not commercial. NRC Special Nuclear Material Licence SNM-7007, issued 13 February 2026 for a 40-year licence period, authorises HALEU fuel manufacture at Oak Ridge, and the company's own prospectus calls it the first-ever Category II nuclear fuel facility licensed in the United States; the Long Mott construction permit application for four Xe-100 reactors has reached its uncontested mandatory NRC hearing, scheduled for 22 September 2026. Neither has yet produced a reactor or a commercial fuel pebble: the prospectus expects TX-1 to be completed in the first half of 2028, and the 10-Q describes present revenue as derived from cost-share agreements such as the DOE ARDP. The HALEU feedstock the fuel depends on is a live dependency rather than a settled advantage — the prospectus states HALEU enrichment services are available only in limited quantities globally and that customers procure the feedstock, and the 10-Q discloses a definitive enrichment agreement with Centrus Energy announced 6 August 2026 under a phased approach with prepayments by X-energy to support Centrus's domestic capacity programme.

Cadence sells the design and sign-off flow that chips must pass to be manufacturable: the 10-K describes foundry-co-developed PDKs, integrated DRC/LVS/STA sign-off, and multi-year time-based licences that leave $7.8 billion of contracted but unsatisfied performance obligations at December 31, 2025.

Chain position

NetApp sits between the memory supply and the enterprise data centre. Upstream, the FY2026 10-K says "Third-party component costs make up a significant portion of our product costs" and singles out NAND as hard to manage "if supplies of certain components, including NAND, become limited relative to demand". Downstream, the hyperscalers are channel, partner and rival at once: the filing states "We both partner with and compete against cloud service providers through our cloud-based software and services offerings", while Azure NetApp Files, Amazon FSx for NetApp ONTAP and Google Cloud NetApp Volumes are delivered as those clouds' own natively embedded services. Distribution is a mix of direct sales and "an ecosystem of partners, including the leading cloud providers".

Upstream supplier of reactor technology and TRISO fuel to industrial-heat and data-centre power buyers; it licenses the design and fabricates the fuel rather than owning or operating the plants.

Upstream design layer: every chip in the graph is designed and signed off through an EDA flow before a foundry will build it.

Products (share / barrier)
  • Functional verification (Xcelium, Jasper, Palladium, Protium) Top 3 · Deep source: sec.gov
  • Innovus digital IC design and signoff Top 3 · Deep source: sec.gov
  • Semiconductor IP Unknown · Moderate source: sec.gov
  • System Design and Analysis (Allegro X, OrCAD X, Fidelity CFD, Clarity, Celsius) Top 3 · Moderate source: sec.gov
  • Virtuoso custom IC design and simulation Leader · Deep source: sec.gov
Long-horizon vote +0.13 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

+0.05 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

+0.35 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →