Compare moats
Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.
| AMD | Cipher Mining | GitLab | |
|---|---|---|---|
| Moat rating | narrow AMD's FY2025 10-K documents real but bounded advantages: approximately 7,200 U.S. patents and roughly 18,900 patent matters worldwide, an outright claim that 'We are the market share leader in semi-custom game console products,' and gross margin of 50% on revenue up 34% to $34.6 billion. The same filing sets the ceiling: 'Some of our competitors may possess stronger market positions, larger customer bases, more design wins, and greater financial, sales, marketing, and distribution resources than us'; Nvidia is named 'the discrete GPU market share leader'; and AMD relies on TSMC 'for the production of all wafers for microprocessor and GPU products at 7 nanometer (nm) or smaller nodes.' Advantages that are genuine, contested, and dependent on a shared foundry are narrow, not wide. | none Cipher (renamed Cipher Digital Inc. on 20 February 2026) holds signed, credit-supported leases but has not yet shown that they amount to a durable advantage. Its 2025 Form 10-K (filed 2026-02-24) says "Through the end of 2025, our revenue has been derived from mining bitcoin". Its Q2 2026 business update (2026-08-04, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/q226_earningsxprxdraftxvf.htm) reported "Q2 2026 Revenue of $25 million", and its first HPC rent began only in August 2026 at Black Pearl. The 10-K's own risk factors describe a contested market. They say "There has been an increasing number of businesses constructing HPC data centers, which has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive", that "our data centers are single-tenant properties", and that lessees "will have the right to terminate the lease if there are significant delays in the completion of construction". At Barber Lake, where the 10-K targeted Phase I delivery "by September 30, 2026", a September 2026 amendment, made "In connection with change orders and the continued evolution of tenant requirements", moved data-hall deliveries to the fourth quarter of 2026 through the first quarter of 2027. Under it, Cipher "will bear the first $359.3 million of costs in excess of the initial budgeted amount" (2026-09-25). There is real counter-evidence: a 15-year Amazon lease, a Google-backstopped Fluidstack lease whose contracted life a "leading AI lab" extended to 20 years, and a third lease with an investment-grade hyperscale tenant. Until that capacity is delivered and paying rent, though, a moat is not shown, so the band is none. | narrow The FY2026 10-K (year ended 2026-01-31) shows real expansion inside the installed base: 118% Dollar-Based Net Retention, Base Customers up to 10,682 from 9,893, customers above $100,000 of ARR up to 1,456 from 1,229, and $1.0 million ARR customers "to 155 from 123, an increase of 26%". But the filing concedes "limited barriers to entry" and names "Microsoft Corporation, which owns GitHub" as principal competitor. Retention decelerates (130% FY2024, 123% FY2025, 118% FY2026), and since DBNR is reported "on a threshold basis of 130%," the FY2024 figure is a cap and the slide is steeper than it looks. Narrow, not wide: expansion must be re-won against a bundled hyperscaler. |
| Moat type | intangibles ip The FY2025 10-K locates the durable asset in design IP rather than manufacturing: 'We rely on contracts and intellectual property rights to protect our products and technologies from unauthorized third-party copying and use,' with approximately 7,200 U.S. patents and about 18,900 patent matters worldwide spanning x86 EPYC/Ryzen CPUs, CDNA/RDNA graphics and the Versal/Zynq adaptive-SoC families, and it credits customer wins to 'our broad IP portfolio and leadership in design, integration and advanced packaging.' It is explicitly not cost_scale: AMD is fabless and 'utilize[s] Taiwan Semiconductor Manufacturing Company Limited (TSMC) for the production of wafers' — the same leading-edge foundry its merchant competitors use, so no manufacturing-scale advantage accrues to it. | none No moat source is demonstrated yet. Switching costs are the most likely candidate, since the leases are long (15 years at Black Pearl; Barber Lake now a 20-year contracted life) and each site has a single tenant. But the 10-K says tenant guarantees "will only be effective after rent commencement under such leases and are subject to certain limitations", and by August 2026 rent had begun at only one site. The advantages the 10-K claims are the company's own. It speaks of "industry-leading expertise in originating and securing industrial-scale, greenfield data center sites" and of securing West Texas land "on more favorable terms than in more established data center markets". The same document says "there is significant competition for power capacity and energized facilities". Intellectual property is modest: "four granted United States patents and one issued patent in Taiwan". With 66 full-time employees, Cipher has no scale advantage over the competitors it names: CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers. | switching costs Stickiness comes from platform embedding, not IP. The 10-K rests differentiation on "our single platform with a unified data model," on "Consolidation of multiple tools into a single platform," and on deployment inside the customer's own perimeter for regulated buyers. Replacement means re-integrating a toolchain and re-certifying compliance. IP is the wrong label: only "16 issued patents and 25 pending patent applications," plus open-source licenses granting "broad permissions to use, copy, modify, and redistribute." The no-lock-in claim is the filing's own characterisation, footnoted to a Forrester study "commissioned by GitLab." |
| Leadership | fast follower The FY2025 10-K itself places AMD behind the pace-setter in its two most important markets: 'Our principal competitor in the supply of discrete graphics is Nvidia, who is the discrete GPU market share leader,' and the risk factors state Nvidia 'leverages its market position in data center GPU, financial resources, and proprietary software ecosystem to promote its systems and influences customers who do business with us.' AMD is nonetheless executing 'an annual cadence of leadership for AMD Instinct solutions' and has won gigawatt-scale commitments (OpenAI, 6 GW) — following fast and closely, not setting the pace. | fast follower No independent share or rank was found. The 10-K names CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers as competitors, along with miners that have "signed leases with hyperscalers and HPC tenants": Hut 8, IREN, TeraWulf, Core Scientific and Applied Digital. Cipher has signed hyperscale-grade tenants (Amazon; Fluidstack with a Google backstop; a third investment-grade hyperscaler) but delivered its first HPC capacity only in August 2026 (Q2 2026 update). That makes it a fast follower. Its self-description as "a leading developer, owner, and operator of industrial-scale data centers" is the company's own claim and is not counted. | fast follower The 10-K positions GitLab against a leader rather than as one: "Our principal competitor is Microsoft Corporation, which owns GitHub." Competition reads from the challenger side, differentiating "from GitHub through flexible deployment options that work within enterprise security and compliance requirements, LLM neutrality with self-hosted gateway support" and an open core model. On AI it follows: Duo Agent Platform went "Generally available in January 2026," the last month of the fiscal year. What keeps it a follower rather than behind is cadence, "a new version of our software every month for 172 months in a row," plus a regulated-deployment franchise a SaaS-first rival does not cover. |
| Pricing power | moderate FY2025 gross margin was 50%, up from 49% in 2024 per the 10-K — healthy and improving — but the same filing attributes average-selling-price pressure to competitors: Intel 'uses its microprocessor market position to price its products aggressively and target our customers and channel partners with special incentives. These aggressive activities have reduced and may reduce our unit sales and average selling prices for many of our products'. Pricing power is real but contested. | weak The 10-K says competition "has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive". It adds that if customers cut usage "we may be compelled to lower our prices or risk losing a significant customer". At Barber Lake, Cipher agreed to absorb "the first $359.3 million of costs in excess of the initial budgeted amount", with the tenant reimbursing "50% of any such costs above that amount" (2026-09-25, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000043/barberlakeleaseamendmentpr.htm). Its one input-cost edge is specific to mining: Odessa's power costs about 2.8 c/kWh under the Luminant contract, available "until at least July 2027". A landlord that concedes cost overruns to its tenants has weak pricing power. | moderate FY2026 gross margin was 87% against 89%, with cost of revenue up $35.6 million "primarily due to an increase of $18.4 million in third party hosting costs for SaaS and cloud usage," and management expects SaaS and Duo mix to bring costs that "may adversely impact our gross margins." Strain is explicit: GitLab "may be required to reduce our prices," competitors "may offer their products and services at a lower price or for free," and it "implemented user limits on our free SaaS product." Power retained: Premium lists at $29 per user/month billed annually, and seats bundle $12 and $24 of GitLab Credits. But "A majority of our subscriptions are on a one-year period." |
| Summary | AMD's edge is architectural design IP executed on someone else's fabs. The FY2025 10-K describes a full-stack portfolio — EPYC server CPUs, Instinct AI accelerators, Ryzen client parts where 'AMD was the first company to integrate a dedicated neural processing unit (NPU) on the same SoC as an x86 CPU for AI PCs,' Radeon graphics, Pensando networking and Versal adaptive SoCs — backed by roughly 18,900 patent matters worldwide, and it discloses gigawatt-scale customer commitments (an October 2025 agreement with OpenAI 'to deploy 6 gigawatts of AMD GPUs,' first gigawatt on Instinct MI450). The same filing bounds that moat: Nvidia is 'the discrete GPU market share leader' and 'leverages its market position in data center GPU, financial resources, and proprietary software ecosystem'; Intel 'uses its microprocessor market position to price its products aggressively'; Arm architectures and customers who 'internally develop products to support similar AI workloads' are named as encroaching; and every wafer at 7 nm or below comes from TSMC. Revenue grew 34% in FY2025 with Data Center up 32%, but the filing's own competitive framing places AMD in the challenger seat rather than the entrenched one. | Cipher built bitcoin mining data centres in Texas and is now developing single-tenant AI and HPC campuses for lease to hyperscalers. Its 10-K reports a portfolio of "4.2 gigawatts ("GW") of capacity across 10 sites". It lists a 15-year Amazon Web Services lease for about 300 MW of turnkey capacity at Black Pearl and a Fluidstack lease at Barber Lake (300 MW gross) under which Google "has agreed to backstop certain obligations of Fluidstack". It describes bitcoin mining at Odessa on a Luminant power contract at about 2.8 c/kWh. In 2026 it signed a third campus lease "with an investment-grade Hyperscale tenant" (Q1 2026 update, 2026-05-05), delivered first Black Pearl capacity in August "two months ahead of the original schedule" with rent commenced, and fully funded its Stingray development with a bond (Q2 2026 update). On 2026-09-25 it said Barber Lake's contracted life was extended from 10 to 20 years, taking contracted revenue at the site "from $3.8 billion to over $9 billion". The 10-K says Odessa was "the first bitcoin mining data center awarded the Management and Operations, or M&O, Stamp of Approval award from the Uptime Institute", which is independent recognition of how the company operates. Against this, the latest quarter's revenue was still bitcoin mining and fell to $25 million. The 10-K describes growing "competition and pricing pressure", single-tenant concentration, and termination rights for construction delays. The Barber Lake schedule was reset, and Cipher absorbs the first $359.3 million of cost overruns. Cipher's contracted pipeline is substantial, but a competitive advantage is not yet demonstrated, so it is rated as having no moat. That could change to narrow once its leased campuses are delivered and paying rent. | GitLab sells a single-platform DevSecOps toolchain defended by workflow lock-in rather than intellectual property: a unified data model plus deployment flexibility, including single-tenant "Dedicated for Government with FedRAMP compliance," makes it hard to remove where data residency is contractual. The installed base expands: 118% Dollar-Based Net Retention, 10,682 Base Customers, 1,456 above $100,000 of ARR, 155 above $1.0 million (up 26%), over 70% of ARR from public sector and enterprise. The filing supplies the counterweight: "limited barriers to entry," Microsoft/GitHub as principal competitor, 16 issued patents. Retention (130 to 123 to 118, the 130 a cap), gross margin (89% to 87%) and a January 2026 AI launch point to compression at the commodity end. No source measures market share, so every share band is "unknown". |
| Chain position | A fabless merchant-silicon designer sitting one layer above the foundries: the FY2025 10-K states AMD relies on TSMC 'for the production of all wafers for microprocessor and GPU products at 7 nanometer (nm) or smaller nodes' and primarily on GLOBALFOUNDRIES above 7 nm, with packaging and test performed by Asia-Pacific ATMP partners — so its cost, supply and cadence are inherited from partners it does not control. | Cipher develops single-tenant, powered data-centre campuses for hyperscale and AI tenants: Amazon at Black Pearl, Fluidstack (backstopped by Google) at Barber Lake, and an unnamed investment-grade hyperscaler at a third campus. Meanwhile it winds down bitcoin mining. | GitLab sits at the software-tooling layer, not compute or models. It consumes third-party LLM capacity — marketing "LLM neutrality and support for self-hosted AI gateways, including air-gapped environments" — so it captures no model-layer economics and bears inference as COGS, visible in the $18.4 million rise in hosting costs. Its distinctive position is the regulated perimeter. |
| Products (share / barrier) |
|
|
|
| Long-horizon vote | +0.06 at weight 0.20 · swarm bullish Editorial prior, not backtested. | -0.06 at weight 0.20 · swarm bearish Editorial prior, not backtested. | +0.06 at weight 0.20 · swarm neutral Editorial prior, not backtested. |