Skip to content

Compare moats

Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.

comparing AMD×Hut 8×TE Connectivity× maximum of 3 — remove one to swap
AMD AMD ai moat: latest change 2026-02-04 Hut 8 HUT ai moat: latest change 2026-02-25 TE Connectivity TEL ai moat: latest change 2025-11-10
Moat rating narrow

AMD's FY2025 10-K documents real but bounded advantages: approximately 7,200 U.S. patents and roughly 18,900 patent matters worldwide, an outright claim that 'We are the market share leader in semi-custom game console products,' and gross margin of 50% on revenue up 34% to $34.6 billion. The same filing sets the ceiling: 'Some of our competitors may possess stronger market positions, larger customer bases, more design wins, and greater financial, sales, marketing, and distribution resources than us'; Nvidia is named 'the discrete GPU market share leader'; and AMD relies on TSMC 'for the production of all wafers for microprocessor and GPU products at 7 nanometer (nm) or smaller nodes.' Advantages that are genuine, contested, and dependent on a shared foundry are narrow, not wide.

source: sec.gov

narrow

The FY2025 10-K says 'we believe we have established a defensible competitive advantage through our power-first, innovation-driven strategy', resting on a power-native team, an application-agnostic framework for digital infrastructure design, end-to-end greenfield development capabilities, and the use of ASIC compute builds to rapidly and cost-effectively secure and monetize power. What separates this from no moat is scarce power: the filing says demand for energy capacity continues to outpace supply and that 'grid interconnection bottlenecks have further constrained access to power and digital infrastructure development', and Hut 8 reports 330 MW of utility capacity under construction at River Bend, commercialized in December 2025 through a 15-year triple-net lease supporting 245 MW of IT capacity, plus 1,230 MW of utility capacity under development. The same filing says 'The industries in which we operate are highly competitive and continuously evolving.', warns that these factors 'might not provide the competitive advantage we anticipate, or if they do, such competitive advantage might not endure', cites the River Bend lease (valued at $7.0 billion over the base term) as an example of expecting a significant portion of revenue from a limited number of customers, and says the company has not maintained consistent profitability. That supports narrow at most, not wide.

source: sec.gov

narrow

The FY2025 10-K's own Competition section undercuts any claim of insulation: 'The industries in which we operate are highly competitive, and we compete with thousands of companies that range from large multinational corporations to local manufacturers', competition is 'generally based on breadth of product offering, product innovation, price, quality, delivery, and service', and TE has 'experienced, and expect[s] to continue to experience, downward pressure on prices'. The same filing explicitly disclaims IP as the basis of its position: 'we do not believe that our competitive position or our operations are dependent upon or would be materially impacted by any single patent or group of related patents.' What TE does hold is durable rather than absolute — it calls itself 'one of the leading providers of advanced automobile connectivity solutions', its Industrial segment 'a leading supplier', and it converted that position into rising profitability across the same filing's three income statements (gross margin 31.5% of net sales in FY2023, 34.4% in FY2024, 35.2% in FY2025). A position that earns expanding margins into admitted price pressure is an advantage; one held against thousands of competitors and no decisive patent is not a wide one.

source: sec.gov

Moat type intangibles ip

The FY2025 10-K locates the durable asset in design IP rather than manufacturing: 'We rely on contracts and intellectual property rights to protect our products and technologies from unauthorized third-party copying and use,' with approximately 7,200 U.S. patents and about 18,900 patent matters worldwide spanning x86 EPYC/Ryzen CPUs, CDNA/RDNA graphics and the Versal/Zynq adaptive-SoC families, and it credits customer wins to 'our broad IP portfolio and leadership in design, integration and advanced packaging.' It is explicitly not cost_scale: AMD is fabless and 'utilize[s] Taiwan Semiconductor Manufacturing Company Limited (TSMC) for the production of wafers' — the same leading-edge foundry its merchant competitors use, so no manufacturing-scale advantage accrues to it.

source: sec.gov

cost scale

The 10-K says 'we believe success depends on the ability to secure scarce assets like power, data center equipment, and customers', and places part of its claimed edge in 'our ability to use ASIC compute infrastructure development to rapidly and cost-effectively secure and monetize power'. Its examples: Vega was energized less than a year after acquisition for an all-in cost of about $455,000 per megawatt, which the filing calls 'a fraction of traditional data center costs', and Salt Creek was completed for about $250,000 per MW; Vega also has immediate access to some of the lowest locational wholesale power prices in North America. These are low-redundancy ASIC compute builds, which the 10-K says carry relatively low capital intensity by design. The 'fraction of traditional data center costs' comparison is against a different facility tier, and the filing gives no peer cost comparison and no cost figure for its AI campuses.

source: sec.gov

switching costs

The FY2025 10-K locates the advantage at the customer, not in patents. It describes 'close working relationships with many of our customers' whose 'relationships with them typically date back many years', and co-development as the mechanism: 'By working with our customers in developing new products and technologies, we believe we can identify and act on trends and leverage knowledge about next-generation technology across our products.' Roughly 75% of fiscal 2025 net sales were direct to manufacturers rather than through distribution, and the Transportation segment's products 'must withstand harsh conditions' — parts engineered in with the customer and built to survive the application, so the position sits inside the customer's design rather than in a purchase order. The filing rules the alternative out in its own words on intellectual property, so intangibles_ip is not the source; the 'thousands of companies' in Competition rules out efficient_scale.

source: sec.gov

Leadership fast follower

The FY2025 10-K itself places AMD behind the pace-setter in its two most important markets: 'Our principal competitor in the supply of discrete graphics is Nvidia, who is the discrete GPU market share leader,' and the risk factors state Nvidia 'leverages its market position in data center GPU, financial resources, and proprietary software ecosystem to promote its systems and influences customers who do business with us.' AMD is nonetheless executing 'an annual cadence of leadership for AMD Instinct solutions' and has won gigawatt-scale commitments (OpenAI, 6 GW) — following fast and closely, not setting the pace.

source: sec.gov

fast follower

The 10-K says 'For example, we signed our first large scale single tenant AI data center lease and commenced construction of the site at our River Bend campus.', offered under the statement that to remain competitive with peers it may need to modify aspects of its business model. River Bend was commercialized in December 2025 through a 15-year triple-net lease supporting 245 MW of IT capacity; Fluidstack is expected to serve as tenant and Google is expected to provide a financial backstop, and initial delivery is targeted for Q2 2027. On speed, the filing says 'Through early engagement with Entergy Louisiana, we assumed key interconnection and development functions typically managed by the utility, such as the development of transmission and distribution infrastructure, materially accelerating originally quoted power delivery timelines.', and that Vega was energized 'less than a year after acquiring it'. It also warns that Hut 8 competes against companies 'that may be more established or have greater financial and other resources and/or expertise'. That describes a newer entrant moving quickly, not an established leader.

source: sec.gov

co leader

The FY2025 10-K claims leadership in qualified form and then names the peers who contest it. Transportation Solutions 'is a leader in connectivity and sensor technologies' and TE is 'one of the leading providers of advanced automobile connectivity solutions' — one of, not the — while the segment's 'major competitors include Yazaki, Aptiv, Sumitomo, Sensata, Honeywell, Molex, and Amphenol'. Industrial Solutions 'is a leading supplier of products that connect and distribute power, data, and signals' and 'competes primarily against Amphenol, Hubbell, Carlisle Companies, Integer Holdings, Molex, Omron, JST, and Korea Electric Terminal (KET)'. Amphenol and Molex appear on both lists, so TE shares the top of the interconnect market rather than owning it.

source: sec.gov

Pricing power moderate

FY2025 gross margin was 50%, up from 49% in 2024 per the 10-K — healthy and improving — but the same filing attributes average-selling-price pressure to competitors: Intel 'uses its microprocessor market position to price its products aggressively and target our customers and channel partners with special incentives. These aggressive activities have reduced and may reduce our unit sales and average selling prices for many of our products'. Pricing power is real but contested.

source: sec.gov

weak

The 10-K says ASIC compute, run through American Bitcoin, can only be profitable if hardware and electricity costs are below the price of the Bitcoin mined, which makes it a price-taking business. It also says Traditional Cloud and AI Cloud compete with cloud services providers for customers, and that the company has not maintained consistent profitability. River Bend's contracted triple-net lease economics are not in service yet; initial delivery is targeted for Q2 2027.

source: sec.gov

moderate

The FY2025 10-K states both halves plainly: TE has 'experienced, and expect[s] to continue to experience, downward pressure on prices. However, as a result of increased costs and tariffs, certain of our businesses implemented price increases in recent years.' Pass-through, not price-setting. The realised result is margin expansion rather than erosion — gross margin of 31.5% of net sales in FY2023, 34.4% in FY2024 and 35.2% in FY2025 per the same filing's income statements, and 36.5% ($5,319M on $14,573M) for the nine months to 26 June 2026 versus 35.3% a year earlier, with Q3 FY2026 GAAP operating margin of 19%, per the 22 July 2026 results release (https://www.sec.gov/Archives/edgar/data/1385157/000110465926085589/tel-20260722xex99d1.htm). Strong would require pricing that leads rather than follows cost; weak is contradicted by three years of expanding gross margin.

source: sec.gov

Summary

AMD's edge is architectural design IP executed on someone else's fabs. The FY2025 10-K describes a full-stack portfolio — EPYC server CPUs, Instinct AI accelerators, Ryzen client parts where 'AMD was the first company to integrate a dedicated neural processing unit (NPU) on the same SoC as an x86 CPU for AI PCs,' Radeon graphics, Pensando networking and Versal adaptive SoCs — backed by roughly 18,900 patent matters worldwide, and it discloses gigawatt-scale customer commitments (an October 2025 agreement with OpenAI 'to deploy 6 gigawatts of AMD GPUs,' first gigawatt on Instinct MI450). The same filing bounds that moat: Nvidia is 'the discrete GPU market share leader' and 'leverages its market position in data center GPU, financial resources, and proprietary software ecosystem'; Intel 'uses its microprocessor market position to price its products aggressively'; Arm architectures and customers who 'internally develop products to support similar AI workloads' are named as encroaching; and every wafer at 7 nm or below comes from TSMC. Revenue grew 34% in FY2025 with Data Center up 32%, but the filing's own competitive framing places AMD in the challenger seat rather than the entrenched one.

Per its FY2025 10-K, Hut 8 is a power-first infrastructure developer. It originates powered land and interconnections, uses ASIC compute builds, which the filing says combine relatively low capital intensity with rapid deployment, as a transitional load to monetize sites sooner, and aims to transition suitable power assets to higher-return uses; its River Bend campus was commercialized through a 15-year AI data center lease. The filing claims a defensible advantage but warns it might not provide the advantage anticipated, or might not endure. It says Hut 8 competes for powered land with digital infrastructure developers and large-scale Bitcoin miners, and its first AI campus is still under construction. Its majority-owned Bitcoin miner, American Bitcoin, can only be profitable when mining costs are below the price of the Bitcoin mined, and the filing says it believes American Bitcoin must keep acquiring miners to keep up with a growing global network hashrate.

TE Connectivity sells the connectors, terminals, sensors and cable-protection parts that, in its own framing, 'enable the distribution of power, signal, and data' — a component vendor, never a system or compute vendor. The FY2025 10-K puts the two reportable segments, Transportation Solutions (54% of net sales) and Industrial Solutions (46%), against a combined served market it estimates at roughly $200 billion, which tells you immediately that no single share number governs this business: the filing discloses no market share, says 'no single customer accounted for a significant amount of our net sales in fiscal 2025, 2024, or 2023', and states that because TE is 'not organized by product or service, it is not practicable to disclose net sales by product or service'. The defensible part is entrenchment. Parts get designed in with the customer and then qualified to survive automotive, aerospace, subsea and grid conditions; TE sells about 75% of net sales direct into ~130 countries; relationships 'typically date back many years'. That is a switching-cost moat, and the filing is unusually candid that it is not a patent moat — no single patent or group of patents is material to its competitive position. The limit is equally plain in the filing: highly competitive industries, thousands of competitors, and persistent downward price pressure, with Amphenol and Molex named as competitors in BOTH segments and Yazaki, Aptiv and Sumitomo heading the Transportation segment's competitor list. The evidence that the moat is nonetheless working is margin plus mix. Gross margin ran 31.5% / 34.4% / 35.2% of net sales across FY2023-FY2025, and in the nine months to 26 June 2026 gross margin was $5,319M on $14,573M of net sales (36.5%) against $4,419M on $12,513M (35.3%) a year earlier, while Q3 FY2026 GAAP operating margin was 19% and orders hit a record $5.7 billion, up 27% year over year. Growth has also rotated: digital data networks grew 34.2% in Q3 FY2026 (34.0% organic) and 48.8% over nine months, with the CEO naming 'increased momentum in AI in both the data center and across the broader energy infrastructure' — while sensors, an end market for which the 10-K makes no leadership claim at all, shrank 2.8% organically in the quarter. Narrow, not wide: a real toll on other people's platforms, collected under admitted price pressure.

Chain position

A fabless merchant-silicon designer sitting one layer above the foundries: the FY2025 10-K states AMD relies on TSMC 'for the production of all wafers for microprocessor and GPU products at 7 nanometer (nm) or smaller nodes' and primarily on GLOBALFOUNDRIES above 7 nm, with packaging and test performed by Asia-Pacific ATMP partners — so its cost, supply and cadence are inherited from partners it does not control.

Power-first developer building AI data center capacity, beginning with River Bend under a 15-year lease (Fluidstack is the expected tenant and Google is expected to provide a financial backstop; initial delivery is targeted for Q2 2027), and runs Bitcoin mining through majority-owned American Bitcoin.

TE is an upstream component supplier to the AI build-out, not a participant in compute. It sells 'connectivity and sensor solutions [that] enable the distribution of power, signal, and data to advance next-generation transportation, energy networks, automated factories, data centers enabling artificial intelligence', about 75% of it direct to manufacturers across roughly 130 countries. AI exposure runs through one end market: digital data networks was 28% of Industrial Solutions, and Industrial Solutions was 46% of fiscal 2025 net sales — so the datacenter line is a minority of a company still 54% transportation. That minority is where the growth now is: digital data networks net sales rose 34.2% in Q3 FY2026 and 48.8% over the nine months, and energy rose 34.4% in the quarter, the CEO tying both to AI momentum 'in both the data center and across the broader energy infrastructure' (https://www.sec.gov/Archives/edgar/data/1385157/000110465926085589/tel-20260722xex99d1.htm).

Products (share / barrier)
Long-horizon vote +0.06 at weight 0.20 · swarm bullish

Editorial prior, not backtested.

see exactly how it voted →

-0.01 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

+0.13 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →