Skip to content

Compare moats

Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.

comparing Arista Networks×Applied Digital×Micron× maximum of 3 — remove one to swap
Arista Networks ANET ai moat: latest change 2026-02-17 Applied Digital APLD ai moat: latest change 2026-07-29 Micron MU ai moat: latest change 2025-08-28
Moat rating narrow

The FY2025 10-K claims 'Market research confirms that we continue to be a leader in high-speed Ethernet switching', but grounds its differentiation in 'open and standards-based technology that avoids what is often expensive vendor lock-in' and warns that white-box entrants and alternative technologies 'may create downward pricing pressure'.

source: sec.gov

none

The FY2026 10-K (filed 2026-07-29) shows contracted revenue, not a demonstrated competitive edge. About 1,410 MW is leased under 15-year take-or-pay, non-cancellable base terms worth about $36.2 billion, but only about 100 MW of the roughly 1.5 GW that is contracted and either operating or under construction was operating and earning revenue at May 31, 2026, and Item 1A says "lessees may have the right to terminate applicable leases if there are significant delays in construction." Item 1A also concedes "We do not have the resources to compete with larger providers of similar products or services at this time," and the Competition section names 13 power-advantaged developers the company competes with. Signed leases give revenue visibility, but the filing does not show a durable advantage.

source: sec.gov

narrow

Micron sits in a three-firm DRAM oligopoly (with Samsung and SK hynix), holds "over 60,000 patents" and leading-edge process technology (industry-first 1-gamma EUV DRAM node in FY2025), yet its FY2025 10-K concedes competitors "may use aggressive pricing" and "may have a larger market share," and consolidated gross margin swung from negative 9% (FY2023) to 40% (FY2025) — a real but commodity-cyclical, non-durable advantage.

source: sec.gov

Moat type intangibles ip

The durable asset the 10-K names is software, not hardware: a single state-oriented operating system (EOS) with a centralised system database, one data lake (NetDL) and one management plane (CloudVision) across the whole portfolio, with Arista, EOS and CloudVision listed as core trademarks — while the switching silicon comes from Broadcom, its 'predominant merchant silicon vendor'.

source: sec.gov

none

The 10-K claims three advantages: power-advantaged sites (it believes securing power and interconnection ahead of demand is 'the principal constraint on new HPC capacity and a core differentiator for us from many of our competitors'), a standardized 'franchise-style' design, and hyperscaler master service and master telecom service agreements 'that are difficult to obtain.' The filing does not show any of them to be durable. Its Competition section says competition 'centers on securing and developing sites with access to large-scale, reliable, and cost-competitive power and interconnection' and names 13 power-advantaged developers going after the same leases, and Item 1A concedes it lacks the resources to compete with larger providers. Signed leases are take-or-pay and non-cancellable, so a tenant leaving for convenience owes 'the full remaining contractual value,' but that is contractual lock-in on each lease rather than a moat source, so no moat type is assigned.

source: sec.gov

intangibles ip

The 10-K roots Micron's edge in proprietary technology and IP: "over 60,000 patents" granted as of Aug 28, 2025, "significant investments to develop proprietary product and process technology," the industry's first 1-gamma (EUV) DRAM node, ninth-generation G9 NAND, and HBM4 samples to key AI customers.

source: sec.gov

Leadership co leader

The 10-K states Arista is a leader in high-speed Ethernet switching while also stating that 'The data center and campus networking markets have historically been dominated by Cisco', with Dell/EMC, Extreme Networks, HPE, Huawei, Juniper and Nvidia also competing.

source: sec.gov

behind

The 10-K makes no leadership claim and gives no ranking or share figure. Item 1A concedes "We do not have the resources to compete with larger providers of similar products or services at this time" and that some rivals have "substantially greater liquidity and financial resources than we do." Its Competition section places APLD against established operators (Digital Realty, Equinix), hyperscalers that build their own capacity, independent developers and 13 named power-advantaged developers (IREN, Cipher Digital, TeraWulf, Hut 8, Riot, CleanSpark, HIVE, Core Scientific, Bitdeer, Galaxy Digital, Fermi, Keel Infrastructure, MARA).

source: sec.gov

co leader

A member of the three-supplier DRAM oligopoly and at the technology frontier (industry-first 1-gamma EUV node), but the smallest of the three by share — the 10-K acknowledges competitors "may have a larger market share" — and a later entrant scaling up in HBM behind SK hynix and Samsung.

source: sec.gov

Pricing power strong

SEC-reported operating income in this filing was 42.8% of revenue in fiscal 2025, up from 42.0% in fiscal 2024, even as the 10-K warns that new entrants and white-box alternatives 'may create downward pricing pressure'.

source: sec.gov

weak

Item 1A says "Due to the limited number of hyperscalers, we expect that a limited number of customers will continue to account for a high percentage of our revenue for the foreseeable future," and that if customers' equipment usage declines or they discontinue use of its facilities, APLD "may be compelled to lower our lease prices in some instances or risk losing a significant customer." One customer was 59% of FY2026 revenue from continuing operations. Take-or-pay, non-cancellable terms protect contracted revenue over the base term, and Note 19 reports a $39.1M HPC Hosting segment profit on $385.3M of segment revenue in FY2026, but those terms are agreed with a small group of concentrated buyers.

source: sec.gov

weak

Memory is a commodity with cyclical ASPs: the 10-K flags "volatility in average selling prices" and competitors' "aggressive pricing" as key risks, and consolidated gross margin swung from -9% (FY2023) to 22% (FY2024) to 40% (FY2025), marking Micron largely as a cyclical price-taker; contract-based, supply-tight HBM is a partial exception.

source: sec.gov

Summary

Arista's edge is a single software image across every box: the 10-K describes EOS, NetDL and CloudVision as one operating model 'from client to cloud', deliberately built on merchant Broadcom silicon and open standards rather than on proprietary hardware lock-in.

Applied Digital designs, builds and operates purpose-built, liquid-cooled HPC data centers, which it calls 'AI factories', and leases the capacity to CoreWeave and investment-grade hyperscalers. At May 31, 2026 its 10-K lists five campuses (Polaris Forge 1-3 and Delta Forge 1-2) with about 1,410 MW contracted under roughly 15-year take-or-pay, non-cancellable leases worth about $36.2 billion over the base terms. The filing claims three sources of advantage: it controls power-advantaged sites, it uses a standardized 'franchise-style' design built to deliver about 150 MW in about 14 to 18 months, and it holds hyperscaler master agreements that are 'difficult to obtain.' The same document shows how early the company is. About 100 MW was operating and earning revenue. One customer was 59% of FY2026 revenue from continuing operations. It competes with Digital Realty, Equinix, hyperscalers that build their own capacity and 13 named power-advantaged developers, and it concedes that it lacks the resources to compete with larger providers. Signed leases give long-dated revenue visibility, but the filing does not show a durable competitive advantage.

Micron is one of only three scaled DRAM suppliers (with Samsung and SK hynix) and a leading-edge NAND maker, defended by proprietary product and process technology and more than 60,000 granted patents. In FY2025 it shipped the industry's first 1-gamma (EUV) DRAM production node and sampled HBM4 36GB 12-high to multiple key customers for next-generation AI platforms, evidencing process-technology leadership in AI memory (FY2025 10-K).

Chain position

Networking layer of the AI datacentre; two customers were 26% and 16% of fiscal 2025 revenue and Broadcom supplies the switching silicon.

Developer and landlord of power-advantaged, liquid-cooled AI data-center capacity, leased long-term to CoreWeave and investment-grade hyperscalers.

US-based supplier of the memory tier of the AI stack — DRAM, HBM and NAND; the 10-K notes cloud servers for AI and data-centric workloads "require significantly increasing quantities of DRAM, including HBM," and Micron sampled HBM4 to power next-generation AI platforms.

Products (share / barrier)
  • AI and cloud datacentre Ethernet switching (Etherlink, 7800R AI Spine, 7060 AI Leaf, 7700R4 DES) Leader · Moderate source: sec.gov
  • Campus networking and SD-WAN (campus spine/PoE leaf switches, Wi-Fi, VeloCloud) Challenger · Low source: sec.gov
  • Cloud-grade routing (7280R4 Universal Leaf, 7500R3 and 7800R4 Universal Spine) Challenger · Moderate source: sec.gov
  • EOS, NetDL and CloudVision network software Unknown · Moderate source: sec.gov
  • Network security and monitoring (Arista NDR, DANZ Monitoring Fabric) Niche · Low source: sec.gov
  • Blockchain data center hosting (Jamestown / Ellendale) Niche · Low source: sec.gov
  • HPC data center leasing (Polaris Forge / Delta Forge AI factories) Challenger · Moderate source: sec.gov
Long-horizon vote +0.17 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

-0.20 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

+0.05 at weight 0.20 · swarm bullish

Editorial prior, not backtested.

see exactly how it voted →