Compare moats
Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.
| Applied Digital | Credo Technology | Vistra | |
|---|---|---|---|
| Moat rating | none The FY2026 10-K (filed 2026-07-29) shows contracted revenue, not a demonstrated competitive edge. About 1,410 MW is leased under 15-year take-or-pay, non-cancellable base terms worth about $36.2 billion, but only about 100 MW of the roughly 1.5 GW that is contracted and either operating or under construction was operating and earning revenue at May 31, 2026, and Item 1A says "lessees may have the right to terminate applicable leases if there are significant delays in construction." Item 1A also concedes "We do not have the resources to compete with larger providers of similar products or services at this time," and the Competition section names 13 power-advantaged developers the company competes with. Signed leases give revenue visibility, but the filing does not show a durable advantage. | narrow The 10-K names Broadcom, Marvell and Astera Labs as principal competitors that compete on 'some, but not all' of Credo's solutions, and discloses that the top 10 customers were approximately 90% of fiscal 2026 revenue with two customers at 10% or more each. A defensible technical position sold into a handful of buyers with that much leverage is narrow, not wide. | narrow The 10-K states that "the majority of our facilities operate as “merchant” facilities without long-term power sales agreements" and that Vistra is "not guaranteed any rate of return on our capital investments". Against that, the scarcity is real: six NRC-licensed nuclear units totalling 6,448 MW, licences running 2036-2053, inside a 43,641 MW fleet, plus 20-year PPAs with AWS (1,200 MW) and Meta (2,609 MW). The 2025 gas additions - Lotus (2,600 MW, closed October 2025) and pending Cogentrix (5,500 MW) - extend the merchant gas side, not the nuclear scarcity. Only the 433 MW of uprates extends the moat asset. |
| Moat type | none The 10-K claims three advantages: power-advantaged sites (it believes securing power and interconnection ahead of demand is 'the principal constraint on new HPC capacity and a core differentiator for us from many of our competitors'), a standardized 'franchise-style' design, and hyperscaler master service and master telecom service agreements 'that are difficult to obtain.' The filing does not show any of them to be durable. Its Competition section says competition 'centers on securing and developing sites with access to large-scale, reliable, and cost-competitive power and interconnection' and names 13 power-advantaged developers going after the same leases, and Item 1A concedes it lacks the resources to compete with larger providers. Signed leases are take-or-pay and non-cancellable, so a tenant leaving for convenience owes 'the full remaining contractual value,' but that is contractual lock-in on each lease rather than a moat source, so no moat type is assigned. | intangibles ip The filing states the products 'are based on our own optimized Serializer/Deserializer (SerDes) and Digital Signal Processor (DSP) technologies' and lists 'extent of IP protection and enforcement of rights' among the principal competitive factors in its market. | intangibles ip The intangibles are non-replicable regulatory assets rather than patents: six nuclear licences (Comanche Peak 2050/2053, Perry 2046, Davis-Besse 2037, Beaver Valley 2036/2047), fuel "contracted to support all our refueling needs through 2030", section 45U credits "recognizing the value of existing carbon-free nuclear power", and TXU Energy, sold "for over 20 years" and "registered and protected by trademark law". Read 45U as a floor, not moat strength: the 2025 credit was $220m against $545m in 2024, and it "provides increasing levels of support as unit revenues decline". Efficient scale does not apply. |
| Leadership | behind The 10-K makes no leadership claim and gives no ranking or share figure. Item 1A concedes "We do not have the resources to compete with larger providers of similar products or services at this time" and that some rivals have "substantially greater liquidity and financial resources than we do." Its Competition section places APLD against established operators (Digital Realty, Equinix), hyperscalers that build their own capacity, independent developers and 13 named power-advantaged developers (IREN, Cipher Digital, TeraWulf, Hut 8, Riot, CleanSpark, HIVE, Core Scientific, Bitdeer, Galaxy Digital, Fermi, Keel Infrastructure, MARA). | co leader The 10-K states 'We believe we are the only company in our industry offering a complete suite of high-performance connectivity solutions', while naming Broadcom, Marvell and Astera as principal competitors on parts of the portfolio — a co-leader's claim, attributed to the company, not an independently observed share. | co leader Vistra describes itself as "one of the largest producers of power in deregulated markets in the U.S." with over 230 TWh generated, "one of the largest competitive power generators in the U.S. as measured by MWh of generation capacity", "one of the largest electricity generators in the U.S.", and "one of the largest competitive residential retail electricity providers". That hedged phrasing appears four times and is the strongest claim the filing makes. The 10-K names no competitor and assigns no rank, so co-leader is the ceiling the disclosure supports. |
| Pricing power | weak Item 1A says "Due to the limited number of hyperscalers, we expect that a limited number of customers will continue to account for a high percentage of our revenue for the foreseeable future," and that if customers' equipment usage declines or they discontinue use of its facilities, APLD "may be compelled to lower our lease prices in some instances or risk losing a significant customer." One customer was 59% of FY2026 revenue from continuing operations. Take-or-pay, non-cancellable terms protect contracted revenue over the base term, and Note 19 reports a $39.1M HPC Hosting segment profit on $385.3M of segment revenue in FY2026, but those terms are agreed with a small group of concentrated buyers. | moderate The n-1 node advantage the filing describes lets Credo price against competitors from a lower cost base, but the same filing discloses two customers at 10% or more of revenue and a top-10 concentration near 90%, which is buyer leverage working the other way. | weak Vistra is a merchant price taker. Price formation rests on "the highest variable cost unit that clears the market", prices are "unpredictable and may fluctuate substantially", hedging markets have "limited liquidity after two to three years", and competing retailers "may offer different products, lower electricity prices and other incentives". ERCOT's $2,000/MWh figure is the low system-wide offer cap, applied conditionally when the peaker net margin exceeds three times CONE or under the PUCT Emergency Pricing Program, not a standing cap. PJM has "announced that it would propose" extending its capacity cap to 2028-29 and 2029-30, subject to FERC approval. |
| Summary | Applied Digital designs, builds and operates purpose-built, liquid-cooled HPC data centers, which it calls 'AI factories', and leases the capacity to CoreWeave and investment-grade hyperscalers. At May 31, 2026 its 10-K lists five campuses (Polaris Forge 1-3 and Delta Forge 1-2) with about 1,410 MW contracted under roughly 15-year take-or-pay, non-cancellable leases worth about $36.2 billion over the base terms. The filing claims three sources of advantage: it controls power-advantaged sites, it uses a standardized 'franchise-style' design built to deliver about 150 MW in about 14 to 18 months, and it holds hyperscaler master agreements that are 'difficult to obtain.' The same document shows how early the company is. About 100 MW was operating and earning revenue. One customer was 59% of FY2026 revenue from continuing operations. It competes with Digital Realty, Equinix, hyperscalers that build their own capacity and 13 named power-advantaged developers, and it concedes that it lacks the resources to compete with larger providers. Signed leases give long-dated revenue visibility, but the filing does not show a durable competitive advantage. | Credo's durable asset is its own SerDes and DSP silicon, which the 10-K says reaches 'similar performance to leading competitors' products but at a lower cost and more highly available legacy node (n-1 advantage)'. That cost-and-supply edge, plus a portfolio the company believes is the industry's only complete high-performance connectivity suite, is what holds a position against far larger rivals — and it is held with roughly 90% of revenue coming from ten customers. | Vistra's moat is one scarce asset wrapped in a commodity business. Six NRC-licensed nuclear units - 6,448 MW, licences running 2036-2053 - sit inside a 43,641 MW fleet that the 10-K says operates in the majority as "merchant" facilities with no long-term power sales agreements and no guaranteed rate of return. That block cannot be rebuilt by a rival, and is now partly de-risked by 20-year PPAs with AWS (1,200 MW from Comanche Peak) and Meta (2,609 MW from the PJM plants) plus section 45U credits. Everything else - 26,989 MW of gas, 8,743 MW of coal, the 5m-customer retail book - competes on price in markets Vistra does not set, against entrants the filing says keep building "despite relatively low power prices". The 2025 growth was gas M&A (Lotus, pending Cogentrix), which widens the commodity-exposed side. Narrow, for a specific reason: the moat is 15% of the fleet. |
| Chain position | Developer and landlord of power-advantaged, liquid-cooled AI data-center capacity, leased long-term to CoreWeave and investment-grade hyperscalers. | Upstream interconnect supplier: SerDes/DSP silicon and active cables sitting between accelerators, switches and optics inside AI data centers. | Merchant IPP: sells energy, capacity and ancillary services into ISO/RTO spot and short-term wholesale markets (ERCOT, PJM, ISO-NE, NYISO, CAISO, MISO) and resells to ~5m retail customers. Emerging role as long-term nuclear offtake supplier to hyperscalers (AWS, Meta). Not a price setter at any link. |
| Products (share / barrier) |
|
|
|
| Long-horizon vote | -0.20 at weight 0.20 · swarm neutral Editorial prior, not backtested. | +0.13 at weight 0.20 · swarm neutral Editorial prior, not backtested. | +0.05 at weight 0.20 · swarm neutral Editorial prior, not backtested. |