Compare moats
Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.
| ASML | Digital Realty Trust | GE Vernova | |
|---|---|---|---|
| Moat rating | wide ASML's FY2025 20-F states it "is currently the world's only manufacturer of EUV lithography systems" — an effective monopoly on the extreme-ultraviolet tools required to pattern leading-edge logic and memory chips. | narrow The FY2025 10-K's own competitive record cuts both ways. Item 1 says a "high-quality, highly interconnected global portfolio such as ours could not be easily replicated today on a cost-competitive basis," yet Item 1A concedes that competitors have "significantly greater financial, marketing and other resources and more ready access to capital" and that as rivals keep developing space, "rental rates may be reduced or we may face delays in leasing." A durable advantage that its own filing says new supply can price against is bounded, not unassailable. | wide FY2025 10-K (filed 2026-01-29): the installed base generates approximately 25% of the world's electricity; the Power segment carries ~$94.4B of remaining performance obligations with ~1,800 of ~7,000 installed gas turbines under long-term service agreements averaging ~10 years of remaining contract life; and the filing states demand is 'exceeding available capacity' for its products — a contracted, decade-scale service annuity on proprietary installed equipment. |
| Moat type | intangibles ip The durable advantage rests on decades of proprietary technology and IP — the 20-F describes ASML's April 2025 1,000-watt EUV light source as "built on 25 years of engineering advancements" — reinforced by an exclusive arrangement with Carl Zeiss SMT as its "sole supplier" of the critical optics no rival can source. | network effects Item 1 attributes the hard-to-replicate part of the portfolio to connectivity rather than to real estate: "the network density, interconnection infrastructure and connectivity-centric customers in certain of our data centers have led to the organic formation of densely connected data communities that are difficult for competitors to replicate." That community sits on over 232,000 cross connects in over 55 metros, so each network and cloud that lands makes the same building worth more to the next tenant. | switching costs 10-K: ~1,800 gas turbines under long-term service agreements with ~10-year average remaining life, plus services agreements on ~24,000 of ~59,000 installed onshore wind turbines — service revenue is contractually tied to GE Vernova's own installed fleet; the filing adds it derives 'a sustained competitive advantage both from our IP portfolio as well as technical know-how embedded in our products and manufacturing techniques developed over decades'. |
| Leadership | clear leader Effectively 100% of the EUV market as the world's only EUV system maker; in the older DUV segment it "compete[s] primarily with Canon and Nikon" yet remains the leading supplier. | co leader Item 1 claims the title of "the largest global provider of cloud- and carrier-neutral data center, colocation and interconnection solutions," but the Competition section names Equinix and NTT as operators of properties "similar to ours in some of the same metropolitan areas," plus Global Switch and regional operators abroad — a shared top tier on the company's own telling, not a solitary one. | co leader 10-K opens with 'GE Vernova is a global leader in the electric power industry' and its installed base generates ~25% of world electricity, but the filing names peer-scale competitors in every segment — Siemens Energy in both Power and Electrification, Mitsubishi Power, Vestas, Hitachi Energy, Schneider Electric, ABB — so co-leader across the portfolio rather than clear leader. |
| Pricing power | strong FY2025 gross margin of 52.8%, up 1.5 percentage points year over year, with management guiding toward 56-60% by 2030 — consistent with monopoly pricing power on EUV tools. | strong FY2025 renewals signed re-priced upward in every bucket — +27.0% on greater-than-1 MW space ($146 to $186 per square foot), +4.6% on 0-1 MW ($268 to $280) and +43.0% on other ($49 to $71) — and MD&A expects average aggregate rental rates on 2026 renewals to be positive against the rates currently paid for the same space "on a GAAP basis and on a cash basis." On costs, the filing says utilities expense "is our largest expense category" and that "the vast majority of the expense is passed directly through to our customers," which it credits with significantly mitigating exposure to power-cost increases rather than removing it. The cap: Item 1A warns competitor development could still force rates down. | strong 10-K: 'increasing demand exceeding available capacity', Electrification customer lead-times 'increased as a result of demand outstripping supply', and both Power and Electrification state they adjust pricing 'in line with market demand, inflation, and industry dynamics'; trade press (Power Engineering, 2026-04-23) reported new gas-turbine order pricing in H1 2026 tracking 10-20 points higher on a dollar-per-kilowatt basis than Q4 2025 orders. |
| Summary | ASML is the sole producer of EUV lithography systems, the only tools able to pattern the most advanced logic and memory nodes, with a roadmap "intended to drive affordable scaling to 2030 and beyond" and a High-NA EUV (TWINSCAN EXE) platform on which customers "had run more than 400,000 wafers" by end-2025. That dominance is protected by 25 years of accumulated engineering IP and an exclusive lock on Carl Zeiss SMT optics that competitors cannot replicate. | Digital Realty rents space, power and connectivity rather than compute: at 2025 year-end its portfolio held 310 data centers and roughly 57.6 million rentable square feet across more than 55 metros in over 30 countries, about 84.7% leased, serving more than 5,000 customers. Two different businesses sit inside that footprint. The greater-than-1 MW wholesale side is a capital-and-power race — 769 MW of projects underway with 64% pre-leased, and land that "could accommodate over 3,500 megawatts of additional data center capacity" — where the 10-K names Equinix, NTT, Global Switch and "various private operators" as rivals and warns that added supply can push rents down. The colocation and interconnection side is the defended half: over 232,000 cross connects and the "densely connected data communities" Item 1 says competitors cannot easily replicate, reinforced by contracts the filing describes as generally running 5-10+ years on large deployments and by improvements "installed at our customers' expense." FY2025 leasing supports that read — renewals signed re-priced +27.0% on greater-than-1 MW space and +4.6% on 0-1 MW — while customer concentration is the offsetting exposure, with the largest customer at roughly 11.7% of annualized recurring revenue. | GE Vernova's moat rests on its installed base: the FY2025 10-K states its equipment generates approximately 25% of the world's electricity, with ~7,000 installed gas turbines (~1,800 under long-term service agreements averaging ~10 years of remaining life) and ~$94.4B of Power-segment remaining performance obligations. The filing reports demand 'exceeding available capacity', lengthening Electrification lead-times 'as a result of demand outstripping supply', and pricing adjusted with demand — scarcity trade press later quantified as new gas-turbine order pricing tracking 10-20 points higher per kW in H1 2026 than Q4 2025, with only ~10 GW of production slots left across 2029-2030 (Power Engineering, 2026-04-23). The moat is not uniform: the 10-K risk section flags intensifying competition as manufacturers from China 'improve quality and reliability and pursue markets outside their home countries', and Offshore Wind is delivering its backlog under project-cost and execution pressure, compounded by the U.S. Interior Department's December 22, 2025 pause of leases for all large-scale U.S. offshore projects under construction, which directly impacted the Vineyard Wind timeline. Nuclear adds optionality: the 10-K cites an SMR deployment agreement it calls 'the first commercial contract of its kind in North America' via its joint ventures with Hitachi. |
| Chain position | Upstream chokepoint of the AI chip supply chain: every leading-edge logic/DRAM wafer for AI accelerators is patterned on ASML EUV tools, making it the single indispensable equipment supplier to TSMC, Samsung and Intel. | Landlord to the AI stack — sells the space, power and interconnection that cloud, network and enterprise tenants run compute in (Oracle, IBM, Meta Platforms, AT&T, Comcast and Lumen are among the customers named in Item 1), with roughly 2.9 GW of total in-place IT capacity. | Power supplier to the AI buildout: the 10-K states gas power serves 'rising electricity demand from hyperscalers and data centers' and Electrification benefits from orders to electrify data centers 'playing a key role in the development of artificial intelligence (AI)'; trade press (Power Engineering, 2026-04-23) put roughly 20% of the ~100 GW of gas capacity under contract as explicitly tied to data-center load. |
| Products (share / barrier) |
|
|
|
| Long-horizon vote | +0.42 at weight 0.20 · swarm bullish Editorial prior, not backtested. | +0.17 at weight 0.20 · swarm neutral Editorial prior, not backtested. | +0.35 at weight 0.20 · swarm bullish Editorial prior, not backtested. |