Skip to content

Compare moats

Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.

comparing Bloom Energy×GE Vernova×Hut 8× maximum of 3 — remove one to swap
Bloom Energy BE ai moat: latest change 2026-02-09 GE Vernova GEV ai moat: latest change 2026-01-29 Hut 8 HUT ai moat: latest change 2026-02-25
Moat rating narrow

FY2025 10-K (Item 1, filed 2026-02-09): a proprietary solid-oxide platform protected by 380 active U.S. utility patents plus 183 pending, with speed-to-power the company says can deliver onsite power 'within approximately 90 days' — real but contested advantages: the same 10-K's Item 1A calls distributed generation and hydrogen 'still emerging markets' whose acceptance is uncertain, and revenue concentration was 43%/13%/12% across three customers in FY2025 (sec.gov/Archives/edgar/data/1664703/000162828026006516/be-20251231.htm).

source: sec.gov

wide

FY2025 10-K (filed 2026-01-29): the installed base generates approximately 25% of the world's electricity; the Power segment carries ~$94.4B of remaining performance obligations with ~1,800 of ~7,000 installed gas turbines under long-term service agreements averaging ~10 years of remaining contract life; and the filing states demand is 'exceeding available capacity' for its products — a contracted, decade-scale service annuity on proprietary installed equipment.

source: sec.gov

narrow

The FY2025 10-K says 'we believe we have established a defensible competitive advantage through our power-first, innovation-driven strategy', resting on a power-native team, an application-agnostic framework for digital infrastructure design, end-to-end greenfield development capabilities, and the use of ASIC compute builds to rapidly and cost-effectively secure and monetize power. What separates this from no moat is scarce power: the filing says demand for energy capacity continues to outpace supply and that 'grid interconnection bottlenecks have further constrained access to power and digital infrastructure development', and Hut 8 reports 330 MW of utility capacity under construction at River Bend, commercialized in December 2025 through a 15-year triple-net lease supporting 245 MW of IT capacity, plus 1,230 MW of utility capacity under development. The same filing says 'The industries in which we operate are highly competitive and continuously evolving.', warns that these factors 'might not provide the competitive advantage we anticipate, or if they do, such competitive advantage might not endure', cites the River Bend lease (valued at $7.0 billion over the base term) as an example of expecting a significant portion of revenue from a limited number of customers, and says the company has not maintained consistent profitability. That supports narrow at most, not wide.

source: sec.gov

Moat type intangibles ip

The FY2025 10-K states 'Intellectual property is an essential differentiator for our business' and details 380 active U.S. utility patents, 252 active international patents, trade secrets around cell printing, and a purpose-built copy-exact Newark manufacturing facility — the moat rests on proprietary solid-oxide technology and manufacturing know-how, not network effects or locked-in customers (Item 1, Intellectual Property / Manufacturing Facilities).

source: sec.gov

switching costs

10-K: ~1,800 gas turbines under long-term service agreements with ~10-year average remaining life, plus services agreements on ~24,000 of ~59,000 installed onshore wind turbines — service revenue is contractually tied to GE Vernova's own installed fleet; the filing adds it derives 'a sustained competitive advantage both from our IP portfolio as well as technical know-how embedded in our products and manufacturing techniques developed over decades'.

source: sec.gov

cost scale

The 10-K says 'we believe success depends on the ability to secure scarce assets like power, data center equipment, and customers', and places part of its claimed edge in 'our ability to use ASIC compute infrastructure development to rapidly and cost-effectively secure and monetize power'. Its examples: Vega was energized less than a year after acquisition for an all-in cost of about $455,000 per megawatt, which the filing calls 'a fraction of traditional data center costs', and Salt Creek was completed for about $250,000 per MW; Vega also has immediate access to some of the lowest locational wholesale power prices in North America. These are low-redundancy ASIC compute builds, which the 10-K says carry relatively low capital intensity by design. The 'fraction of traditional data center costs' comparison is against a different facility tier, and the filing gives no peer cost comparison and no cost figure for its AI campuses.

source: sec.gov

Leadership clear leader

Scoped to fuel-cell-based onsite power for datacenters: Energy Changemakers (2026-07-04) positions Bloom as the market leader in fuel-cell deployment for AI datacenters — Brookfield framework expanded $5B→$25B, Oracle up to 2.8 GW, Equinix 100+ MW across 19 US datacenters, AEP gigawatt-scale — with FuelCell Energy the named challenger at smaller aggregate scale (~450/380/360 MW deals). In onsite power broadly (vs. turbines and engines) Bloom is one option among several (energychangemakers.com/fuel-cells-gain-ground-in-data-centers/).

source: sec.gov

co leader

10-K opens with 'GE Vernova is a global leader in the electric power industry' and its installed base generates ~25% of world electricity, but the filing names peer-scale competitors in every segment — Siemens Energy in both Power and Electrification, Mitsubishi Power, Vestas, Hitachi Energy, Schneider Electric, ABB — so co-leader across the portfolio rather than clear leader.

source: sec.gov

fast follower

The 10-K says 'For example, we signed our first large scale single tenant AI data center lease and commenced construction of the site at our River Bend campus.', offered under the statement that to remain competitive with peers it may need to modify aspects of its business model. River Bend was commercialized in December 2025 through a 15-year triple-net lease supporting 245 MW of IT capacity; Fluidstack is expected to serve as tenant and Google is expected to provide a financial backstop, and initial delivery is targeted for Q2 2027. On speed, the filing says 'Through early engagement with Entergy Louisiana, we assumed key interconnection and development functions typically managed by the utility, such as the development of transmission and distribution infrastructure, materially accelerating originally quoted power delivery timelines.', and that Vega was energized 'less than a year after acquiring it'. It also warns that Hut 8 competes against companies 'that may be more established or have greater financial and other resources and/or expertise'. That describes a newer entrant moving quickly, not an established leader.

source: sec.gov

Pricing power moderate

Q2 2026 release: GAAP gross margin 33.4%, up 668 bps YoY, with 34.3% non-GAAP and raised FY26 guidance of ~34% non-GAAP gross margin — margin expansion during a supply-constrained turbine market suggests real but cyclical pricing leverage; the FY2025 10-K frames the core competition as grid electricity and combustion OEMs on cost, which caps pricing through the cycle (sec.gov/Archives/edgar/data/1664703/000162828026050150/ex991_q226financialresults.htm).

source: sec.gov

strong

10-K: 'increasing demand exceeding available capacity', Electrification customer lead-times 'increased as a result of demand outstripping supply', and both Power and Electrification state they adjust pricing 'in line with market demand, inflation, and industry dynamics'; trade press (Power Engineering, 2026-04-23) reported new gas-turbine order pricing in H1 2026 tracking 10-20 points higher on a dollar-per-kilowatt basis than Q4 2025 orders.

source: sec.gov

weak

The 10-K says ASIC compute, run through American Bitcoin, can only be profitable if hardware and electricity costs are below the price of the Bitcoin mined, which makes it a price-taking business. It also says Traditional Cloud and AI Cloud compete with cloud services providers for customers, and that the company has not maintained consistent profitability. River Bend's contracted triple-net lease economics are not in service yet; initial delivery is targeted for Q2 2027.

source: sec.gov

Summary

Bloom's edge is a single solid-oxide platform — 'cell printing, stack assemblies, and column configurations' — that serves both the Energy Server and the Bloom Electrolyzer, protected by 380 active U.S. patents and decades of materials know-how (FY2025 10-K, Item 1). Against its practical competition — grid power, gas reciprocating engines, small gas turbines, and other fuel-cell chemistries (PEM/MCFC/PAFC) — the 10-K claims higher efficiency, no combustion, 99.9% fleet availability on post-2020 non-redundant installs, and deployment in weeks-to-months while turbine OEMs are supply-constrained. That time-to-power window is currently being monetized in AI datacenters: the Q2 2026 release (2026-07-28) reported record revenue of $1,065.4M (+165.5% YoY) and management said all major U.S. hyperscalers have 'validated and approved' Bloom, calling it 'a standard for AI onsite power.' The moat is rated narrow, not wide: the 10-K's own risk factors stress that distributed generation is an emerging market with uncertain acceptance, three customers were 43%/13%/12% of FY2025 revenue, and industry coverage (Energy Changemakers, 2026-07-04) shows FuelCell Energy signing deals of comparable scale — the advantage is a technology-and-execution lead that rivals and turbine capacity additions can compress, not a structural lock.

GE Vernova's moat rests on its installed base: the FY2025 10-K states its equipment generates approximately 25% of the world's electricity, with ~7,000 installed gas turbines (~1,800 under long-term service agreements averaging ~10 years of remaining life) and ~$94.4B of Power-segment remaining performance obligations. The filing reports demand 'exceeding available capacity', lengthening Electrification lead-times 'as a result of demand outstripping supply', and pricing adjusted with demand — scarcity trade press later quantified as new gas-turbine order pricing tracking 10-20 points higher per kW in H1 2026 than Q4 2025, with only ~10 GW of production slots left across 2029-2030 (Power Engineering, 2026-04-23). The moat is not uniform: the 10-K risk section flags intensifying competition as manufacturers from China 'improve quality and reliability and pursue markets outside their home countries', and Offshore Wind is delivering its backlog under project-cost and execution pressure, compounded by the U.S. Interior Department's December 22, 2025 pause of leases for all large-scale U.S. offshore projects under construction, which directly impacted the Vineyard Wind timeline. Nuclear adds optionality: the 10-K cites an SMR deployment agreement it calls 'the first commercial contract of its kind in North America' via its joint ventures with Hitachi.

Per its FY2025 10-K, Hut 8 is a power-first infrastructure developer. It originates powered land and interconnections, uses ASIC compute builds, which the filing says combine relatively low capital intensity with rapid deployment, as a transitional load to monetize sites sooner, and aims to transition suitable power assets to higher-return uses; its River Bend campus was commercialized through a 15-year AI data center lease. The filing claims a defensible advantage but warns it might not provide the advantage anticipated, or might not endure. It says Hut 8 competes for powered land with digital infrastructure developers and large-scale Bitcoin miners, and its first AI campus is still under construction. Its majority-owned Bitcoin miner, American Bitcoin, can only be profitable when mining costs are below the price of the Bitcoin mined, and the filing says it believes American Bitcoin must keep acquiring miners to keep up with a growing global network hashrate.

Chain position

Onsite prime-power supplier to AI infrastructure: per the FY2025 10-K, AEP is procuring up to 1 GW of Bloom fuel cells for AI datacenter loads, Brookfield established a financing framework (up to $5.0B over five years at signing, per the 10-K) housed in an AI Infrastructure Fund, and SK ecoplant (a ~2.5% Class A holder) distributes and co-assembles in Korea; the Q2 2026 release adds that all major U.S. hyperscalers plus over a dozen neoclouds, AI labs, and colocation operators have approved Bloom's systems.

Power supplier to the AI buildout: the 10-K states gas power serves 'rising electricity demand from hyperscalers and data centers' and Electrification benefits from orders to electrify data centers 'playing a key role in the development of artificial intelligence (AI)'; trade press (Power Engineering, 2026-04-23) put roughly 20% of the ~100 GW of gas capacity under contract as explicitly tied to data-center load.

Power-first developer building AI data center capacity, beginning with River Bend under a 15-year lease (Fluidstack is the expected tenant and Google is expected to provide a financial backstop; initial delivery is targeted for Q2 2027), and runs Bitcoin mining through majority-owned American Bitcoin.

Products (share / barrier)
Long-horizon vote +0.20 at weight 0.20 · swarm bullish

Editorial prior, not backtested.

see exactly how it voted →

+0.35 at weight 0.20 · swarm bullish

Editorial prior, not backtested.

see exactly how it voted →

-0.01 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →