Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.

comparing Bloom Energy×Talen Energy×Applied Digital× maximum of 3 — remove one to swap
Bloom Energy BE ai moat: latest change 2026-02-09 Talen Energy TLN ai moat: latest change 2026-02-26 Applied Digital APLD ai moat: latest change 2026-07-29
Moat rating narrow

FY2025 10-K (Item 1, filed 2026-02-09): a proprietary solid-oxide platform protected by 380 active U.S. utility patents plus 183 pending, with speed-to-power the company says can deliver onsite power 'within approximately 90 days' — real but contested advantages: the same 10-K's Item 1A calls distributed generation and hydrogen 'still emerging markets' whose acceptance is uncertain, and revenue concentration was 43%/13%/12% across three customers in FY2025 (sec.gov/Archives/edgar/data/1664703/000162828026006516/be-20251231.htm).

source: sec.gov

narrow

The FY2025 10-K grounds a real but bounded advantage. Susquehanna produced about 17 TWh in 2025 at an all-in cost of about $27/MWh, and up to 1,920 MW of it is contracted to AWS under a long-term, fixed-price PPA through 2042 'at anticipated premium prices', with deliveries expected to ramp to full volume no later than 2032. The moat is narrow rather than wide because, outside its contracts, the fleet sells into competitive wholesale markets, and the 10-K says that 'unlike regulated utilities, we are not assured of any rate of return on capital investments through a regulated rate structure'. It also concedes that competitors 'may have advantages over us through access to greater resources, newer generation facilities, lower costs, or more experience'. The advantage is also concentrated: Susquehanna has typically been about half of total annual generation.

source: sec.gov

none

The FY2026 10-K (filed 2026-07-29) shows contracted revenue, not a demonstrated competitive edge. About 1,410 MW is leased under 15-year take-or-pay, non-cancellable base terms worth about $36.2 billion, but only about 100 MW of the roughly 1.5 GW that is contracted and either operating or under construction was operating and earning revenue at May 31, 2026, and Item 1A says "lessees may have the right to terminate applicable leases if there are significant delays in construction." Item 1A also concedes "We do not have the resources to compete with larger providers of similar products or services at this time," and the Competition section names 13 power-advantaged developers the company competes with. Signed leases give revenue visibility, but the filing does not show a durable advantage.

source: sec.gov

Moat type intangibles ip

The FY2025 10-K states 'Intellectual property is an essential differentiator for our business' and details 380 active U.S. utility patents, 252 active international patents, trade secrets around cell printing, and a purpose-built copy-exact Newark manufacturing facility — the moat rests on proprietary solid-oxide technology and manufacturing know-how, not network effects or locked-in customers (Item 1, Intellectual Property / Manufacturing Facilities).

source: sec.gov

cost scale

The 10-K says Talen's ability to compete 'is affected primarily by electricity prices, fuel prices, the relative cost of electric generation, and the reliability and availability of generation assets'. The edge it cites is low-cost baseload supply: Susquehanna, the seventh-largest U.S. nuclear plant, produced power at an all-in cost of about $27/MWh in 2025, under NRC licences that expire in 2042 and 2044. The 10-K says natural gas facilities 'often serve as the marginal, price-setting generating units' and that energy margin is influenced by the relationship between electricity and natural gas prices, so a low-cost nuclear unit earns the gap between market price and its own cost. The AWS adjacency is a contract rather than a fleet-wide switching cost, and network effects and IP do not apply.

source: sec.gov

none

The 10-K claims three advantages: power-advantaged sites (it believes securing power and interconnection ahead of demand is 'the principal constraint on new HPC capacity and a core differentiator for us from many of our competitors'), a standardized 'franchise-style' design, and hyperscaler master service and master telecom service agreements 'that are difficult to obtain.' The filing does not show any of them to be durable. Its Competition section says competition 'centers on securing and developing sites with access to large-scale, reliable, and cost-competitive power and interconnection' and names 13 power-advantaged developers going after the same leases, and Item 1A concedes it lacks the resources to compete with larger providers. Signed leases are take-or-pay and non-cancellable, so a tenant leaving for convenience owes 'the full remaining contractual value,' but that is contractual lock-in on each lease rather than a moat source, so no moat type is assigned.

source: sec.gov

Leadership clear leader

Scoped to fuel-cell-based onsite power for datacenters: Energy Changemakers (2026-07-04) positions Bloom as the market leader in fuel-cell deployment for AI datacenters — Brookfield framework expanded $5B→$25B, Oracle up to 2.8 GW, Equinix 100+ MW across 19 US datacenters, AEP gigawatt-scale — with FuelCell Energy the named challenger at smaller aggregate scale (~450/380/360 MW deals). In onsite power broadly (vs. turbines and engines) Bloom is one option among several (energychangemakers.com/fuel-cells-gain-ground-in-data-centers/).

source: sec.gov

at parity

Talen calls itself 'a leading independent power producer', but its merchant output is undifferentiated. The 10-K says it sells into PJM capacity auctions and day-ahead and real-time markets against 'other non-utility generators, regulated utilities and their competitive subsidiaries, industrial companies, financial institutions, and other energy marketers', and that some rivals may have greater resources, newer plants or lower costs. Susquehanna's rank as the seventh-largest U.S. nuclear facility shows scale, not market leadership.

source: sec.gov

behind

The 10-K makes no leadership claim and gives no ranking or share figure. Item 1A concedes "We do not have the resources to compete with larger providers of similar products or services at this time" and that some rivals have "substantially greater liquidity and financial resources than we do." Its Competition section places APLD against established operators (Digital Realty, Equinix), hyperscalers that build their own capacity, independent developers and 13 named power-advantaged developers (IREN, Cipher Digital, TeraWulf, Hut 8, Riot, CleanSpark, HIVE, Core Scientific, Bitdeer, Galaxy Digital, Fermi, Keel Infrastructure, MARA).

source: sec.gov

Pricing power moderate

Q2 2026 release: GAAP gross margin 33.4%, up 668 bps YoY, with 34.3% non-GAAP and raised FY26 guidance of ~34% non-GAAP gross margin — margin expansion during a supply-constrained turbine market suggests real but cyclical pricing leverage; the FY2025 10-K frames the core competition as grid electricity and combustion OEMs on cost, which caps pricing through the cycle (sec.gov/Archives/edgar/data/1664703/000162828026050150/ex991_q226financialresults.htm).

source: sec.gov

moderate

Pricing power is mixed and sits in the AWS contract. The AWS PPA is fixed-price 'at anticipated premium prices' through 2042, and the 10-K says such large-load contracts 'can lock in meaningful premiums'. The Brandon Shores and H.A. Wagner RMR agreements provide FERC-approved annual fixed-cost payments of $145 million and $35 million from June 1, 2025, each including a performance hold-back, and FERC's approval is under appeal by the Maryland Office of People's Counsel; they give revenue certainty rather than pricing power. The merchant remainder takes market prices. The 10-K says gas units 'often serve as the marginal, price-setting generating units', and the PJM auction imposed a capacity price collar with an approximate minimum and maximum of $175/MWd and $325/MWd for the 2026/2027 and 2027/2028 auctions. In the 2027/2028 auction Talen cleared 8,745 MW at $333.44/MWd.

source: sec.gov

weak

Item 1A says "Due to the limited number of hyperscalers, we expect that a limited number of customers will continue to account for a high percentage of our revenue for the foreseeable future," and that if customers' equipment usage declines or they discontinue use of its facilities, APLD "may be compelled to lower our lease prices in some instances or risk losing a significant customer." One customer was 59% of FY2026 revenue from continuing operations. Take-or-pay, non-cancellable terms protect contracted revenue over the base term, and Note 19 reports a $39.1M HPC Hosting segment profit on $385.3M of segment revenue in FY2026, but those terms are agreed with a small group of concentrated buyers.

source: sec.gov

Summary

Bloom's edge is a single solid-oxide platform — 'cell printing, stack assemblies, and column configurations' — that serves both the Energy Server and the Bloom Electrolyzer, protected by 380 active U.S. patents and decades of materials know-how (FY2025 10-K, Item 1). Against its practical competition — grid power, gas reciprocating engines, small gas turbines, and other fuel-cell chemistries (PEM/MCFC/PAFC) — the 10-K claims higher efficiency, no combustion, 99.9% fleet availability on post-2020 non-redundant installs, and deployment in weeks-to-months while turbine OEMs are supply-constrained. That time-to-power window is currently being monetized in AI datacenters: the Q2 2026 release (2026-07-28) reported record revenue of $1,065.4M (+165.5% YoY) and management said all major U.S. hyperscalers have 'validated and approved' Bloom, calling it 'a standard for AI onsite power.' The moat is rated narrow, not wide: the 10-K's own risk factors stress that distributed generation is an emerging market with uncertain acceptance, three customers were 43%/13%/12% of FY2025 revenue, and industry coverage (Energy Changemakers, 2026-07-04) shows FuelCell Energy signing deals of comparable scale — the advantage is a technology-and-execution lead that rivals and turbine capacity additions can compress, not a structural lock.

Talen's advantage comes from one contracted asset. It owns 90% of the 2.5 GW Susquehanna nuclear plant, which produced about 17 TWh in 2025 at about $27/MWh all-in, and it has agreed to supply the adjacent AWS data campus with up to 1,920 MW under a fixed-price PPA through 2042. The rest of its roughly 13.1 GW fleet at the 10-K date (a total that includes its 2.2 GW nuclear share) includes newly acquired H-class combined-cycle gas plants, intermediate and peaking units, the Brandon Shores and H.A. Wagner units kept running under FERC-approved RMR agreements, and about 800 MW of minority interests in three coal-fired plants. Apart from the RMR units, that fleet sells capacity and energy mainly into competitive PJM markets through capacity auctions, spot markets and futures contracts, and the 10-K notes that, 'unlike regulated utilities, we are not assured of any rate of return on capital investments through a regulated rate structure'. The 10-K's 'Talen flywheel' strategy is to repeat the AWS model with other large-load buyers. Until more of the fleet is contracted, the moat stays narrow and concentrated in Susquehanna.

Applied Digital designs, builds and operates purpose-built, liquid-cooled HPC data centers, which it calls 'AI factories', and leases the capacity to CoreWeave and investment-grade hyperscalers. At May 31, 2026 its 10-K lists five campuses (Polaris Forge 1-3 and Delta Forge 1-2) with about 1,410 MW contracted under roughly 15-year take-or-pay, non-cancellable leases worth about $36.2 billion over the base terms. The filing claims three sources of advantage: it controls power-advantaged sites, it uses a standardized 'franchise-style' design built to deliver about 150 MW in about 14 to 18 months, and it holds hyperscaler master agreements that are 'difficult to obtain.' The same document shows how early the company is. About 100 MW was operating and earning revenue. One customer was 59% of FY2026 revenue from continuing operations. It competes with Digital Realty, Equinix, hyperscalers that build their own capacity and 13 named power-advantaged developers, and it concedes that it lacks the resources to compete with larger providers. Signed leases give long-dated revenue visibility, but the filing does not show a durable competitive advantage.

Chain position

Onsite prime-power supplier to AI infrastructure: per the FY2025 10-K, AEP is procuring up to 1 GW of Bloom fuel cells for AI datacenter loads, Brookfield established a financing framework (up to $5.0B over five years at signing, per the 10-K) housed in an AI Infrastructure Fund, and SK ecoplant (a ~2.5% Class A holder) distributes and co-assembles in Korea; the Q2 2026 release adds that all major U.S. hyperscalers plus over a dozen neoclouds, AI labs, and colocation operators have approved Bloom's systems.

Supplies nuclear power from Susquehanna to Amazon's adjacent AWS data campus, and sells capacity and energy into the PJM grid.

Developer and landlord of power-advantaged, liquid-cooled AI data-center capacity, leased long-term to CoreWeave and investment-grade hyperscalers.

Products (share / barrier)
  • Blockchain data center hosting (Jamestown / Ellendale) Niche · Low source: sec.gov
  • HPC data center leasing (Polaris Forge / Delta Forge AI factories) Challenger · Moderate source: sec.gov
Long-horizon vote +0.20 at weight 0.20 · swarm bullish

Editorial prior, not backtested.

see exactly how it voted →

+0.06 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

-0.20 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →