Compare moats
Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.
| Cipher Mining | Cadence Design Systems | Tesla, Inc. | |
|---|---|---|---|
| Moat rating | none Cipher (renamed Cipher Digital Inc. on 20 February 2026) holds signed, credit-supported leases but has not yet shown that they amount to a durable advantage. Its 2025 Form 10-K (filed 2026-02-24) says "Through the end of 2025, our revenue has been derived from mining bitcoin". Its Q2 2026 business update (2026-08-04, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/q226_earningsxprxdraftxvf.htm) reported "Q2 2026 Revenue of $25 million", and its first HPC rent began only in August 2026 at Black Pearl. The 10-K's own risk factors describe a contested market. They say "There has been an increasing number of businesses constructing HPC data centers, which has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive", that "our data centers are single-tenant properties", and that lessees "will have the right to terminate the lease if there are significant delays in the completion of construction". At Barber Lake, where the 10-K targeted Phase I delivery "by September 30, 2026", a September 2026 amendment, made "In connection with change orders and the continued evolution of tenant requirements", moved data-hall deliveries to the fourth quarter of 2026 through the first quarter of 2027. Under it, Cipher "will bear the first $359.3 million of costs in excess of the initial budgeted amount" (2026-09-25). There is real counter-evidence: a 15-year Amazon lease, a Google-backstopped Fluidstack lease whose contracted life a "leading AI lab" extended to 20 years, and a third lease with an investment-grade hyperscale tenant. Until that capacity is delivered and paying rent, though, a moat is not shown, so the band is none. | wide The FY2025 10-K competition section names only a short list of full-flow rivals — Synopsys, Ansys (acquired by Synopsys) and Siemens EDA — for a toolset it describes as essential to meeting foundry manufacturing sign-off requirements. | narrow Tesla's FY2025 10-K calls the automotive market "highly competitive" and expects it to "become even more competitive," and its energy-storage market "also highly competitive"; gross margin compressed from ~25.6% (FY2022) to ~18% (FY2023-FY2025) amid price cuts — a real but contested moat, not a wide one. |
| Moat type | none No moat source is demonstrated yet. Switching costs are the most likely candidate, since the leases are long (15 years at Black Pearl; Barber Lake now a 20-year contracted life) and each site has a single tenant. But the 10-K says tenant guarantees "will only be effective after rent commencement under such leases and are subject to certain limitations", and by August 2026 rent had begun at only one site. The advantages the 10-K claims are the company's own. It speaks of "industry-leading expertise in originating and securing industrial-scale, greenfield data center sites" and of securing West Texas land "on more favorable terms than in more established data center markets". The same document says "there is significant competition for power capacity and energized facilities". Intellectual property is modest: "four granted United States patents and one issued patent in Taiwan". With 66 full-time employees, Cipher has no scale advantage over the competitors it names: CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers. | switching costs The 10-K states Cadence works with foundry partners to develop process design kits 'to ensure our core EDA products and solutions meet manufacturing sign-off requirements', and licenses software on two-to-three-year time-based terms — so the tools are embedded in a customer's qualified design flow, not bought per project. | intangibles ip The 10-K attributes Tesla's differentiation to a "vertically integrated business model, and focus on user experience," delivering "AI-related and enhanced software" via FSD (Supervised) and neural-network capabilities — a brand-plus-proprietary-technology (EV/battery + autonomy) intangible edge. |
| Leadership | fast follower No independent share or rank was found. The 10-K names CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers as competitors, along with miners that have "signed leases with hyperscalers and HPC tenants": Hut 8, IREN, TeraWulf, Core Scientific and Applied Digital. Cipher has signed hyperscale-grade tenants (Amazon; Fluidstack with a Google backstop; a third investment-grade hyperscaler) but delivered its first HPC capacity only in August 2026 (Q2 2026 update). That makes it a fast follower. Its self-description as "a leading developer, owner, and operator of industrial-scale data centers" is the company's own claim and is not counted. | co leader The 10-K calls Virtuoso 'the industry standard for custom and analog IC design' while naming Synopsys, Ansys and Siemens EDA as key competitors across the same markets. | co leader A leading global EV maker whose Model Y is among the world's best-selling vehicles, but the 10-K acknowledges "a significant and growing number of established and new" competitors entering EVs, and Tesla competes in autonomy/robotics as one of several players. |
| Pricing power | weak The 10-K says competition "has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive". It adds that if customers cut usage "we may be compelled to lower our prices or risk losing a significant customer". At Barber Lake, Cipher agreed to absorb "the first $359.3 million of costs in excess of the initial budgeted amount", with the tenant reimbursing "50% of any such costs above that amount" (2026-09-25, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000043/barberlakeleaseamendmentpr.htm). Its one input-cost edge is specific to mining: Odessa's power costs about 2.8 c/kWh under the Luminant contract, available "until at least July 2027". A landlord that concedes cost overruns to its tenants has weak pricing power. | strong Product and maintenance was 91% of fiscal 2025 revenue under time-based licences 'generally two to three years', with $7.8 billion of contracted but unsatisfied performance obligations at December 31, 2025; SEC-reported operating income in the same filing was 28.2% of revenue. | moderate Gross margin fell from ~25.6% (FY2022) to ~18.0% (FY2025) as Tesla cut prices to defend volume, though it remains above most auto peers (SEC financials in the FY2025 10-K). |
| Summary | Cipher built bitcoin mining data centres in Texas and is now developing single-tenant AI and HPC campuses for lease to hyperscalers. Its 10-K reports a portfolio of "4.2 gigawatts ("GW") of capacity across 10 sites". It lists a 15-year Amazon Web Services lease for about 300 MW of turnkey capacity at Black Pearl and a Fluidstack lease at Barber Lake (300 MW gross) under which Google "has agreed to backstop certain obligations of Fluidstack". It describes bitcoin mining at Odessa on a Luminant power contract at about 2.8 c/kWh. In 2026 it signed a third campus lease "with an investment-grade Hyperscale tenant" (Q1 2026 update, 2026-05-05), delivered first Black Pearl capacity in August "two months ahead of the original schedule" with rent commenced, and fully funded its Stingray development with a bond (Q2 2026 update). On 2026-09-25 it said Barber Lake's contracted life was extended from 10 to 20 years, taking contracted revenue at the site "from $3.8 billion to over $9 billion". The 10-K says Odessa was "the first bitcoin mining data center awarded the Management and Operations, or M&O, Stamp of Approval award from the Uptime Institute", which is independent recognition of how the company operates. Against this, the latest quarter's revenue was still bitcoin mining and fell to $25 million. The 10-K describes growing "competition and pricing pressure", single-tenant concentration, and termination rights for construction delays. The Barber Lake schedule was reset, and Cipher absorbs the first $359.3 million of cost overruns. Cipher's contracted pipeline is substantial, but a competitive advantage is not yet demonstrated, so it is rated as having no moat. That could change to narrow once its leased campuses are delivered and paying rent. | Cadence sells the design and sign-off flow that chips must pass to be manufacturable: the 10-K describes foundry-co-developed PDKs, integrated DRC/LVS/STA sign-off, and multi-year time-based licences that leave $7.8 billion of contracted but unsatisfied performance obligations at December 31, 2025. | Tesla's edge rests on a vertically integrated manufacturing model, a strong brand, the Supercharger network, a fast-growing energy-storage business, and the largest supervised-FSD fleet feeding its autonomy neural networks. But its FY2025 10-K itself calls both the automotive and energy-storage markets "highly competitive" and expects auto to become "even more competitive," and gross margin has compressed from ~26% to ~18%, so the moat is durable but contested rather than wide. |
| Chain position | Cipher develops single-tenant, powered data-centre campuses for hyperscale and AI tenants: Amazon at Black Pearl, Fluidstack (backstopped by Google) at Barber Lake, and an unnamed investment-grade hyperscaler at a third campus. Meanwhile it winds down bitcoin mining. | Upstream design layer: every chip in the graph is designed and signed off through an EDA flow before a foundry will build it. | Downstream AI application/end-user: consumes AI compute (NVIDIA) and custom inference silicon (Samsung/TSMC) to build autonomy (FSD/Robotaxi) and robotics (Optimus). |
| Products (share / barrier) |
|
|
|
| Long-horizon vote | -0.06 at weight 0.20 · swarm bearish Editorial prior, not backtested. | +0.35 at weight 0.20 · swarm neutral Editorial prior, not backtested. | +0.13 at weight 0.20 · swarm neutral Editorial prior, not backtested. |