Skip to content

Compare moats

Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.

comparing Cipher Mining×CrowdStrike×Cisco Systems× maximum of 3 — remove one to swap
Cipher Mining CIFR ai moat: latest change 2026-02-24 CrowdStrike CRWD ai moat: latest change 2026-03-05 Cisco Systems CSCO ai moat: latest change 2025-09-03
Moat rating none

Cipher (renamed Cipher Digital Inc. on 20 February 2026) holds signed, credit-supported leases but has not yet shown that they amount to a durable advantage. Its 2025 Form 10-K (filed 2026-02-24) says "Through the end of 2025, our revenue has been derived from mining bitcoin". Its Q2 2026 business update (2026-08-04, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/q226_earningsxprxdraftxvf.htm) reported "Q2 2026 Revenue of $25 million", and its first HPC rent began only in August 2026 at Black Pearl. The 10-K's own risk factors describe a contested market. They say "There has been an increasing number of businesses constructing HPC data centers, which has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive", that "our data centers are single-tenant properties", and that lessees "will have the right to terminate the lease if there are significant delays in the completion of construction". At Barber Lake, where the 10-K targeted Phase I delivery "by September 30, 2026", a September 2026 amendment, made "In connection with change orders and the continued evolution of tenant requirements", moved data-hall deliveries to the fourth quarter of 2026 through the first quarter of 2027. Under it, Cipher "will bear the first $359.3 million of costs in excess of the initial budgeted amount" (2026-09-25). There is real counter-evidence: a 15-year Amazon lease, a Google-backstopped Fluidstack lease whose contracted life a "leading AI lab" extended to 20 years, and a third lease with an investment-grade hyperscale tenant. Until that capacity is delivered and paying rent, though, a moat is not shown, so the band is none.

source: sec.gov

narrow

Narrow rather than wide because the FY2026 10-K argues both ways and its own risk factors are the harder side: it describes a self-reinforcing data advantage and says "we do not believe any of our competitors currently have a true platform offering equivalent to the Falcon platform", but the same filing calls the market for security and IT operations solutions "intensely competitive, fragmented", warns that "Competitive pricing pressure may reduce our gross profits", and still carries the July 19 Incident as having "had, and is expected to continue to have, an adverse effect on our business, sales, customer and partner relations, reputation" more than two years after it occurred.

source: sec.gov

narrow

The FY2025 10-K shows a moat that still pays but no longer compounds: total gross margin of 64.9% and remaining performance obligations of $43,533 million (up 6%) against a Networking product category that fell from $34,570 million in fiscal 2023 to $29,229 million in fiscal 2024 to $28,304 million in fiscal 2025, and a product gross-margin bridge in which 'Product pricing' subtracted 1.6 percentage points. All of the reported category growth came from Splunk-carrying lines - Security +59% and Observability +26%. Real and durable, but bounded: narrow, not wide.

source: sec.gov

Moat type none

No moat source is demonstrated yet. Switching costs are the most likely candidate, since the leases are long (15 years at Black Pearl; Barber Lake now a 20-year contracted life) and each site has a single tenant. But the 10-K says tenant guarantees "will only be effective after rent commencement under such leases and are subject to certain limitations", and by August 2026 rent had begun at only one site. The advantages the 10-K claims are the company's own. It speaks of "industry-leading expertise in originating and securing industrial-scale, greenfield data center sites" and of securing West Texas land "on more favorable terms than in more established data center markets". The same document says "there is significant competition for power capacity and energized facilities". Intellectual property is modest: "four granted United States patents and one issued patent in Taiwan". With 66 full-time employees, Cipher has no scale advantage over the competitors it names: CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers.

source: sec.gov

network effects

The 10-K states the mechanism directly: "The more data that is fed into our Falcon platform, the more intelligent the AI Security Cloud becomes, the stronger our ability to anticipate and counter evolving adversary tradecraft, and the more our customers benefit, creating a powerful network effect that increases the overall value we provide."

source: sec.gov

switching costs

The durable piece is the contracted annuity attached to installed equipment: total remaining performance obligations of $43,533 million, of which $21,961 million is services and $21,810 million is long-term (recognised beyond twelve months), carried at a services gross margin of 68.5% that has risen for three consecutive years from 66.4% and 68.1%. Customers keep paying for support on gear they already run.

source: sec.gov

Leadership fast follower

No independent share or rank was found. The 10-K names CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers as competitors, along with miners that have "signed leases with hyperscalers and HPC tenants": Hut 8, IREN, TeraWulf, Core Scientific and Applied Digital. Cipher has signed hyperscale-grade tenants (Amazon; Fluidstack with a Google backstop; a third investment-grade hyperscaler) but delivered its first HPC capacity only in August 2026 (Q2 2026 update). That makes it a fast follower. Its self-description as "a leading developer, owner, and operator of industrial-scale data centers" is the company's own claim and is not counted.

source: sec.gov

co leader

Co-leader rather than clear leader because the only claim of platform primacy available is the company's own ("we do not believe any of our competitors currently have a true platform offering equivalent"), while the same 10-K describes a fragmented market and lists seven distinct categories of competitor, from legacy antivirus to network security, cloud security, identity and legacy SIEM vendors.

source: sec.gov

co leader

The 10-K names no competitor and discloses no market share anywhere in Management's Discussion and Analysis. The positional facts it does give are scale and direction: Networking product revenue of $28,304 million in fiscal 2025 - by far the largest of its four categories - but down $6.3 billion from fiscal 2023, with channel partner financing volume falling from $32.1 billion to $27.1 billion to $24.9 billion across fiscal 2023-2025.

source: sec.gov

Pricing power weak

The 10-K says competition "has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive". It adds that if customers cut usage "we may be compelled to lower our prices or risk losing a significant customer". At Barber Lake, Cipher agreed to absorb "the first $359.3 million of costs in excess of the initial budgeted amount", with the tenant reimbursing "50% of any such costs above that amount" (2026-09-25, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000043/barberlakeleaseamendmentpr.htm). Its one input-cost edge is specific to mining: Odessa's power costs about 2.8 c/kWh under the Luminant contract, available "until at least July 2027". A landlord that concedes cost overruns to its tenants has weak pricing power.

source: sec.gov

moderate

The 10-K's risk factors state that "Competitive pricing pressure may reduce our gross profits" and that competing successfully may require "aggressive pricing", which is the company's own case against strong pricing power; the offsetting factor it cites is module consolidation on one sensor.

source: sec.gov

moderate

The product gross-margin bridge attributes fiscal 2025's 0.2-point improvement to productivity (+2.0 points) and mix (+1.1 points) while 'Product pricing' subtracted 1.6 points; a legal dispute with a supplier cost a further 0.8 points. Total gross margin of 64.9% (product 63.7%, services 68.5%) is held by cost and mix, not by price.

source: sec.gov

Summary

Cipher built bitcoin mining data centres in Texas and is now developing single-tenant AI and HPC campuses for lease to hyperscalers. Its 10-K reports a portfolio of "4.2 gigawatts ("GW") of capacity across 10 sites". It lists a 15-year Amazon Web Services lease for about 300 MW of turnkey capacity at Black Pearl and a Fluidstack lease at Barber Lake (300 MW gross) under which Google "has agreed to backstop certain obligations of Fluidstack". It describes bitcoin mining at Odessa on a Luminant power contract at about 2.8 c/kWh. In 2026 it signed a third campus lease "with an investment-grade Hyperscale tenant" (Q1 2026 update, 2026-05-05), delivered first Black Pearl capacity in August "two months ahead of the original schedule" with rent commenced, and fully funded its Stingray development with a bond (Q2 2026 update). On 2026-09-25 it said Barber Lake's contracted life was extended from 10 to 20 years, taking contracted revenue at the site "from $3.8 billion to over $9 billion". The 10-K says Odessa was "the first bitcoin mining data center awarded the Management and Operations, or M&O, Stamp of Approval award from the Uptime Institute", which is independent recognition of how the company operates. Against this, the latest quarter's revenue was still bitcoin mining and fell to $25 million. The 10-K describes growing "competition and pricing pressure", single-tenant concentration, and termination rights for construction delays. The Barber Lake schedule was reset, and Cipher absorbs the first $359.3 million of cost overruns. Cipher's contracted pipeline is substantial, but a competitive advantage is not yet demonstrated, so it is rated as having no moat. That could change to narrow once its leased campuses are delivered and paying rent.

A single lightweight sensor collects enterprise data once and reuses it across 33 cloud modules, and the pooled telemetry trains the models every customer is then defended by — the 10-K calls this crowdsourced, high-fidelity data "cloud-scale AI" and treats it as the fundamental differentiator from competitors.

The installed base still switches slowly - but the filing does not claim it is winning the AI datacenter on the strength of that base. The fiscal 2025 Networking decline is attributed to 'product shipments returning to normalized levels during the first half of fiscal 2025 from the elevated levels ... in the first half of fiscal 2024', to servers, and to 'a decline in campus switching' - normalisation, not disclosed share loss, so the whitebox/Arista thesis is not something this 10-K either confirms or denies. What the filing does disclose is the shape of the AI dollar Cisco is actually winning: Americas service provider and cloud growth 'driven by AI infrastructure revenue from webscale customers', funded by additional purchase commitments 'related to manufacturing Cisco Silicon One and other products to meet demand from webscale and other customers', which 'significantly increased our supply chain exposure, which has resulted in negative impacts to our product gross margin in recent periods and may result in further negative impacts in future periods'. Enterprise switching earns 63.7% product gross margin; webscale silicon costs margin to serve. The moat is intact where the annuity is and thin where the growth is.

Chain position

Cipher develops single-tenant, powered data-centre campuses for hyperscale and AI tenants: Amazon at Black Pearl, Fluidstack (backstopped by Google) at Barber Lake, and an unnamed investment-grade hyperscaler at a third campus. Meanwhile it winds down bitcoin mining.

AI-native security platform — an adopter and reseller of AI rather than a supplier of AI infrastructure.

Supplies networking into AI datacenters: the 10-K ties Americas service provider and cloud growth to 'AI infrastructure revenue from webscale customers' and to Cisco Silicon One manufacturing commitments.

Products (share / barrier)
  • Bitcoin mining (Odessa) Unknown · Low source: sec.gov
  • HPC data center leasing (Black Pearl, Barber Lake, Stingray) Challenger · Moderate source: sec.gov
  • Cisco Silicon One and webscale AI infrastructure Challenger · Low source: sec.gov
  • Collaboration (Webex Suite, devices, Contact Center, CPaaS) Challenger · Low source: sec.gov
  • Networking (switching, routing, wireless, servers) Leader · Moderate source: sec.gov
  • Observability (Splunk Observability Suite, ThousandEyes) Niche · Moderate source: sec.gov
  • Security (Splunk TDR, SASE, network security) Top 3 · Moderate source: sec.gov
  • Technical support and services Leader · Deep source: sec.gov
Long-horizon vote -0.06 at weight 0.20 · swarm bearish

Editorial prior, not backtested.

see exactly how it voted →

+0.13 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

+0.13 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →