Skip to content

Compare moats

Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.

comparing Cipher Mining×GitLab×Applied Materials× maximum of 3 — remove one to swap
Cipher Mining CIFR ai moat: latest change 2026-02-24 GitLab GTLB ai moat: latest change 2026-08-05 Applied Materials AMAT ai moat: latest change 2025-12-12
Moat rating none

Cipher (renamed Cipher Digital Inc. on 20 February 2026) holds signed, credit-supported leases but has not yet shown that they amount to a durable advantage. Its 2025 Form 10-K (filed 2026-02-24) says "Through the end of 2025, our revenue has been derived from mining bitcoin". Its Q2 2026 business update (2026-08-04, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/q226_earningsxprxdraftxvf.htm) reported "Q2 2026 Revenue of $25 million", and its first HPC rent began only in August 2026 at Black Pearl. The 10-K's own risk factors describe a contested market. They say "There has been an increasing number of businesses constructing HPC data centers, which has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive", that "our data centers are single-tenant properties", and that lessees "will have the right to terminate the lease if there are significant delays in the completion of construction". At Barber Lake, where the 10-K targeted Phase I delivery "by September 30, 2026", a September 2026 amendment, made "In connection with change orders and the continued evolution of tenant requirements", moved data-hall deliveries to the fourth quarter of 2026 through the first quarter of 2027. Under it, Cipher "will bear the first $359.3 million of costs in excess of the initial budgeted amount" (2026-09-25). There is real counter-evidence: a 15-year Amazon lease, a Google-backstopped Fluidstack lease whose contracted life a "leading AI lab" extended to 20 years, and a third lease with an investment-grade hyperscale tenant. Until that capacity is delivered and paying rent, though, a moat is not shown, so the band is none.

source: sec.gov

narrow

The FY2026 10-K (year ended 2026-01-31) shows real expansion inside the installed base: 118% Dollar-Based Net Retention, Base Customers up to 10,682 from 9,893, customers above $100,000 of ARR up to 1,456 from 1,229, and $1.0 million ARR customers "to 155 from 123, an increase of 26%". But the filing concedes "limited barriers to entry" and names "Microsoft Corporation, which owns GitHub" as principal competitor. Retention decelerates (130% FY2024, 123% FY2025, 118% FY2026), and since DBNR is reported "on a threshold basis of 130%," the FY2024 figure is a cap and the slide is steeper than it looks. Narrow, not wide: expansion must be re-won against a bundled hyperscaler.

source: sec.gov

wide

The FY2025 10-K (filed 2025-12-12) grounds a wide moat on three reinforcing pillars: (1) scale IP — 'more than 23,500 active patents in the United States and other countries' and $3.57B of fiscal 2025 RD&E spend that 'must generally enable us to deliver new products and technologies before the emergence of strong demand'; (2) portfolio breadth — 'the semiconductor capital equipment industry's most comprehensive portfolio of products', letting Applied 'combine, co-optimize and integrate our technologies to develop highly differentiated solutions'; (3) an installed-base annuity — the AGS segment monetizes 'our large, global installed base of semiconductor and other equipment' with transactional and subscription services, spares and factory automation software, carrying a $7,141M backlog (48% of the company's $15,002M total) at fiscal year-end 2025. Company gross margin expanded three straight years (46.7% FY2023, 47.5% FY2024, 48.7% FY2025) while this played out.

source: sec.gov

Moat type none

No moat source is demonstrated yet. Switching costs are the most likely candidate, since the leases are long (15 years at Black Pearl; Barber Lake now a 20-year contracted life) and each site has a single tenant. But the 10-K says tenant guarantees "will only be effective after rent commencement under such leases and are subject to certain limitations", and by August 2026 rent had begun at only one site. The advantages the 10-K claims are the company's own. It speaks of "industry-leading expertise in originating and securing industrial-scale, greenfield data center sites" and of securing West Texas land "on more favorable terms than in more established data center markets". The same document says "there is significant competition for power capacity and energized facilities". Intellectual property is modest: "four granted United States patents and one issued patent in Taiwan". With 66 full-time employees, Cipher has no scale advantage over the competitors it names: CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers.

source: sec.gov

switching costs

Stickiness comes from platform embedding, not IP. The 10-K rests differentiation on "our single platform with a unified data model," on "Consolidation of multiple tools into a single platform," and on deployment inside the customer's own perimeter for regulated buyers. Replacement means re-integrating a toolchain and re-certifying compliance. IP is the wrong label: only "16 issued patents and 25 pending patent applications," plus open-source licenses granting "broad permissions to use, copy, modify, and redistribute." The no-lock-in claim is the filing's own characterisation, footnoted to a Forrester study "commissioned by GitLab."

source: sec.gov

intangibles ip

The 10-K itself names IP as the competitive foundation: 'Protection of our technology assets through enforcement of our intellectual property rights, including patents, is important for our competitive position', backed by 'more than 23,500 active patents' plus trademarks, know-how, trade secrets and copyrights, and $3,570M of fiscal 2025 RD&E ($3,042M inside Semiconductor Systems alone). A strong secondary switching-cost layer is also documented: the risk factors cite the difficulty of 'securing development-tool-of-record (DTOR) and production-tool-of-record (PTOR) positions with customers' as a decisive competitive factor — once a tool is the record tool for a node, displacement is the exception — and AGS service/spares revenue is tied to the installed base.

source: sec.gov

Leadership fast follower

No independent share or rank was found. The 10-K names CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers as competitors, along with miners that have "signed leases with hyperscalers and HPC tenants": Hut 8, IREN, TeraWulf, Core Scientific and Applied Digital. Cipher has signed hyperscale-grade tenants (Amazon; Fluidstack with a Google backstop; a third investment-grade hyperscaler) but delivered its first HPC capacity only in August 2026 (Q2 2026 update). That makes it a fast follower. Its self-description as "a leading developer, owner, and operator of industrial-scale data centers" is the company's own claim and is not counted.

source: sec.gov

fast follower

The 10-K positions GitLab against a leader rather than as one: "Our principal competitor is Microsoft Corporation, which owns GitHub." Competition reads from the challenger side, differentiating "from GitHub through flexible deployment options that work within enterprise security and compliance requirements, LLM neutrality with self-hosted gateway support" and an open core model. On AI it follows: Duo Agent Platform went "Generally available in January 2026," the last month of the fiscal year. What keeps it a follower rather than behind is cadence, "a new version of our software every month for 172 months in a row," plus a regulated-deployment franchise a SaaS-first rival does not cover.

source: sec.gov

clear leader

Self-declared basis, not an independent rank: the 10-K's opening sentence claims Applied 'is the leader in the materials engineering solutions used to produce virtually every semiconductor in the world' and repeatedly claims 'the semiconductor capital equipment industry's most comprehensive portfolio'. The filing names no competitor and states no market-share figure — it acknowledges rivals ranging 'from small companies that compete in a single region... to global, diversified companies' and says only that 'many of our products have strong competitive positions'. Leadership claim is scoped to materials engineering (Applied sells no lithography).

source: sec.gov

Pricing power weak

The 10-K says competition "has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive". It adds that if customers cut usage "we may be compelled to lower our prices or risk losing a significant customer". At Barber Lake, Cipher agreed to absorb "the first $359.3 million of costs in excess of the initial budgeted amount", with the tenant reimbursing "50% of any such costs above that amount" (2026-09-25, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000043/barberlakeleaseamendmentpr.htm). Its one input-cost edge is specific to mining: Odessa's power costs about 2.8 c/kWh under the Luminant contract, available "until at least July 2027". A landlord that concedes cost overruns to its tenants has weak pricing power.

source: sec.gov

moderate

FY2026 gross margin was 87% against 89%, with cost of revenue up $35.6 million "primarily due to an increase of $18.4 million in third party hosting costs for SaaS and cloud usage," and management expects SaaS and Duo mix to bring costs that "may adversely impact our gross margins." Strain is explicit: GitLab "may be required to reduce our prices," competitors "may offer their products and services at a lower price or for free," and it "implemented user limits on our free SaaS product." Power retained: Premium lists at $29 per user/month billed annually, and seats bundle $12 and $24 of GitLab Credits. But "A majority of our subscriptions are on a one-year period."

source: sec.gov

strong

MD&A attributes the FY2025 gross-margin expansion explicitly to price: margin rose 1.2 points to 48.7% 'primarily driven by higher net revenue, favorable changes in customer and product mix, an increase in average selling prices, and lower material and manufacturing costs' — the third consecutive annual increase (46.7% FY2023, 47.5% FY2024, 48.7% FY2025), with Semiconductor Systems segment gross margin at 54.2%. Counterweight from the same filing: a 'highly concentrated customer base' (two customers ~19% and ~15% of net revenue) whose members 'may seek pricing, payment, intellectual property-related, or other commercial terms that are less favorable to us'.

source: sec.gov

Summary

Cipher built bitcoin mining data centres in Texas and is now developing single-tenant AI and HPC campuses for lease to hyperscalers. Its 10-K reports a portfolio of "4.2 gigawatts ("GW") of capacity across 10 sites". It lists a 15-year Amazon Web Services lease for about 300 MW of turnkey capacity at Black Pearl and a Fluidstack lease at Barber Lake (300 MW gross) under which Google "has agreed to backstop certain obligations of Fluidstack". It describes bitcoin mining at Odessa on a Luminant power contract at about 2.8 c/kWh. In 2026 it signed a third campus lease "with an investment-grade Hyperscale tenant" (Q1 2026 update, 2026-05-05), delivered first Black Pearl capacity in August "two months ahead of the original schedule" with rent commenced, and fully funded its Stingray development with a bond (Q2 2026 update). On 2026-09-25 it said Barber Lake's contracted life was extended from 10 to 20 years, taking contracted revenue at the site "from $3.8 billion to over $9 billion". The 10-K says Odessa was "the first bitcoin mining data center awarded the Management and Operations, or M&O, Stamp of Approval award from the Uptime Institute", which is independent recognition of how the company operates. Against this, the latest quarter's revenue was still bitcoin mining and fell to $25 million. The 10-K describes growing "competition and pricing pressure", single-tenant concentration, and termination rights for construction delays. The Barber Lake schedule was reset, and Cipher absorbs the first $359.3 million of cost overruns. Cipher's contracted pipeline is substantial, but a competitive advantage is not yet demonstrated, so it is rated as having no moat. That could change to narrow once its leased campuses are delivered and paying rent.

GitLab sells a single-platform DevSecOps toolchain defended by workflow lock-in rather than intellectual property: a unified data model plus deployment flexibility, including single-tenant "Dedicated for Government with FedRAMP compliance," makes it hard to remove where data residency is contractual. The installed base expands: 118% Dollar-Based Net Retention, 10,682 Base Customers, 1,456 above $100,000 of ARR, 155 above $1.0 million (up 26%), over 70% of ARR from public sector and enterprise. The filing supplies the counterweight: "limited barriers to entry," Microsoft/GitHub as principal competitor, 16 issued patents. Retention (130 to 123 to 118, the 130 a cap), gross margin (89% to 87%) and a January 2026 AI launch point to compression at the commodity end. No source measures market share, so every share band is "unknown".

Applied Materials describes itself in its FY2025 10-K as 'the leader in the materials engineering solutions used to produce virtually every semiconductor in the world', selling wafer-fab equipment across patterning, transistor and interconnect fabrication (deposition/etch for 3D transistors), optical and eBeam process control, and advanced packaging. Fiscal 2025 net revenue was $28,368M: Semiconductor Systems $20,798M at a 54.2% gross margin (up from 52.9% FY2024 and 52.0% FY2023), AGS services $6,385M, and Corporate and Other (including display equipment) $1,185M. Within Semiconductor Systems, foundry/logic was 67% of revenue, DRAM 26%, NAND 7%. The moat mechanics the filing documents: 23,500+ active patents and $3.57B annual RD&E that must land tools with customers 'during early-stage technology selection'; DTOR/PTOR tool-of-record incumbency (cited in risk factors as the hard-to-win competitive position); and an AGS installed-base annuity whose backlog ($7,141M) now rivals the equipment backlog. The filing is equally clear about the moat's edges: 'Substantial competition exists across all the segments of our business'; two customers were approximately 19% and 15% of fiscal 2025 net revenue; ~89% of revenue is from outside the United States; and U.S. export controls on China 'have limited the market for certain of our products and services, adversely impacted our revenues and increased our exposure to foreign and Chinese domestic competition'.

Chain position

Cipher develops single-tenant, powered data-centre campuses for hyperscale and AI tenants: Amazon at Black Pearl, Fluidstack (backstopped by Google) at Barber Lake, and an unnamed investment-grade hyperscaler at a third campus. Meanwhile it winds down bitcoin mining.

GitLab sits at the software-tooling layer, not compute or models. It consumes third-party LLM capacity — marketing "LLM neutrality and support for self-hosted AI gateways, including air-gapped environments" — so it captures no model-layer economics and bears inference as COGS, visible in the $18.4 million rise in hosting costs. Its distinctive position is the regulated perimeter.

Upstream chokepoint of the AI-compute supply chain: Applied's tools fabricate chips for 'artificial intelligence (AI) and data center servers' among other end markets, selling into foundry/logic (67% of Semiconductor Systems revenue), DRAM (26%) and NAND (7%). Concentration cuts both ways — two customers were ~19% and ~15% of FY2025 net revenue, ~89% of revenue is non-U.S., and the customer base is 'geographically concentrated, particularly in China, Taiwan and Korea', with U.S. export controls on China constraining the addressable market and feeding Chinese domestic-equipment competition (all per the FY2025 10-K).

Products (share / barrier)
  • Bitcoin mining (Odessa) Unknown · Low source: sec.gov
  • HPC data center leasing (Black Pearl, Barber Lake, Stingray) Challenger · Moderate source: sec.gov
  • Enterprise Agile Planning add-on Unknown · Low source: sec.gov
  • GitLab Dedicated (including Dedicated for Government) Unknown · Deep source: sec.gov
  • GitLab DevSecOps Platform (Free, Premium, and Ultimate tiers) Unknown · Moderate source: sec.gov
  • GitLab Duo Agent Platform (with GitLab Credits) Unknown · Low source: about.gitlab.com
  • Self-Managed GitLab (on-premises and hybrid cloud deployment) Unknown · Deep source: sec.gov
Long-horizon vote -0.06 at weight 0.20 · swarm bearish

Editorial prior, not backtested.

see exactly how it voted →

+0.06 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

+0.42 at weight 0.20 · swarm bullish

Editorial prior, not backtested.

see exactly how it voted →