Skip to content

Compare moats

Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.

comparing Cipher Mining×NVIDIA×Penguin Solutions× maximum of 3 — remove one to swap
Cipher Mining CIFR ai moat: latest change 2026-02-24 NVIDIA NVDA ai moat: latest change 2026-02-25 Penguin Solutions PENG ai moat: latest change 2025-10-21
Moat rating none

Cipher (renamed Cipher Digital Inc. on 20 February 2026) holds signed, credit-supported leases but has not yet shown that they amount to a durable advantage. Its 2025 Form 10-K (filed 2026-02-24) says "Through the end of 2025, our revenue has been derived from mining bitcoin". Its Q2 2026 business update (2026-08-04, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/q226_earningsxprxdraftxvf.htm) reported "Q2 2026 Revenue of $25 million", and its first HPC rent began only in August 2026 at Black Pearl. The 10-K's own risk factors describe a contested market. They say "There has been an increasing number of businesses constructing HPC data centers, which has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive", that "our data centers are single-tenant properties", and that lessees "will have the right to terminate the lease if there are significant delays in the completion of construction". At Barber Lake, where the 10-K targeted Phase I delivery "by September 30, 2026", a September 2026 amendment, made "In connection with change orders and the continued evolution of tenant requirements", moved data-hall deliveries to the fourth quarter of 2026 through the first quarter of 2027. Under it, Cipher "will bear the first $359.3 million of costs in excess of the initial budgeted amount" (2026-09-25). There is real counter-evidence: a 15-year Amazon lease, a Google-backstopped Fluidstack lease whose contracted life a "leading AI lab" extended to 20 years, and a third lease with an investment-grade hyperscale tenant. Until that capacity is delivered and paying rent, though, a moat is not shown, so the band is none.

source: sec.gov

wide

Wide: the CUDA software platform and its developer installed base create high switching costs across the AI-training stack, defended by $76.7B cumulative R&D and reinforced by ~71% FY2026 gross margins and Data Center revenue (~90% of total) up 68% YoY — durable, hard-to-replicate advantages per the FY2026 10-K.

source: sec.gov

none

The FY2025 10-K (fiscal year ended August 29, 2025) documents design-in niches but no durable excess return. In favour: the Competition section says some large rivals 'tend to have limited customization and service capabilities and are generally focused on higher-volume memory, storage, or compute products that are manufactured to industry-standard specifications'. It says the company's 'close collaboration with customers, customer-specific designs, long-lifecycle solutions, superior products and proprietary supply chain services create significant customer loyalty that may provide an advantage when competing against large international companies'. Against: the same filing says many competitors have 'substantially greater financial, technical, marketing, distribution and other resources' and 'lower cost structures'. Sales are made 'primarily pursuant to customer purchase orders and are not based on long-term supply agreements', and 'customers are not obligated to purchase our products even if we achieve a design win'. Large customers 'have exerted' pressure for price concessions, and the ten largest were 66% of fiscal 2025 net sales. GAAP operating income was 0.6%, 1.6% and 4.2% of net sales in fiscal 2023, 2024 and 2025, and fiscal 2024 had a net loss from continuing operations of $41.8 million. The 10-Q for the quarter ended May 29, 2026 (filed 2026-07-07, https://www.sec.gov/Archives/edgar/data/1616533/000161653326000043/peng-20260529.htm) adds that Advanced Computing nine-month sales fell 20.6%, reflecting 'both the ongoing Penguin Edge wind down and hyperscale hardware sales in 2025 that did not recur in 2026'. The filing's own advantage claim is hedged ('may provide an advantage'): design-in niches exist, but the 10-K shows no durable excess return.

source: sec.gov

Moat type none

No moat source is demonstrated yet. Switching costs are the most likely candidate, since the leases are long (15 years at Black Pearl; Barber Lake now a 20-year contracted life) and each site has a single tenant. But the 10-K says tenant guarantees "will only be effective after rent commencement under such leases and are subject to certain limitations", and by August 2026 rent had begun at only one site. The advantages the 10-K claims are the company's own. It speaks of "industry-leading expertise in originating and securing industrial-scale, greenfield data center sites" and of securing West Texas land "on more favorable terms than in more established data center markets". The same document says "there is significant competition for power capacity and energized facilities". Intellectual property is modest: "four granted United States patents and one issued patent in Taiwan". With 66 full-time employees, Cipher has no scale advantage over the competitors it names: CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers.

source: sec.gov

intangibles ip

The durable edge rests on proprietary IP and software: the full-stack CUDA development platform running on all NVIDIA GPUs plus hundreds of proprietary domain libraries/SDKs/APIs, and $76.7B cumulative R&D yielding "inventions that are essential to modern computing" (NVIDIA invented the GPU in 1999). This is reinforced by developer-ecosystem network effects and CUDA switching costs, per the FY2026 10-K Business section.

source: sec.gov

none

The strongest candidate moat source in the 10-K is design-in and qualification, a switching-cost argument, and the filing limits it too far to count. The risk factors say 'Our products are often incorporated into customers' systems at the design stage', and many specialty products 'are specifically designed for our OEM customers' systems or products'. But qualification is 'both product-specific and platform-specific', so a design win covers one platform. The filing notes that customers 'sometimes require us to re-qualify our products' for new platforms, which 'can be time-consuming and cause reductions in our net sales', so each new platform reopens the socket. It also says 'customers are not obligated to purchase our products even if we achieve a design win', and warns that OEMs designing in 'standardized or commodity components' could reduce demand for its 'higher priced specialized or customized solutions'. Scale is ruled out because the filing says many competitors have lower cost structures. Patents are ruled out as a durable source. The company holds about 1,650 of them and calls intellectual property 'an important aspect of our business', but it says its patents 'do not cover all of our technologies' and that competitors 'may design around our patented technologies'. It also says some products are 'built around mature industry standards and have less patent protection', so 'we cannot prevent our competitors from reverse-engineering and duplicating those products'.

source: sec.gov

Leadership fast follower

No independent share or rank was found. The 10-K names CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers as competitors, along with miners that have "signed leases with hyperscalers and HPC tenants": Hut 8, IREN, TeraWulf, Core Scientific and Applied Digital. Cipher has signed hyperscale-grade tenants (Amazon; Fluidstack with a Google backstop; a third investment-grade hyperscaler) but delivered its first HPC capacity only in August 2026 (Q2 2026 update). That makes it a fast follower. Its self-description as "a leading developer, owner, and operator of industrial-scale data centers" is the company's own claim and is not counted.

source: sec.gov

clear leader

FY2026 Data Center revenue was $193.7B (~90% of the $215.9B total), up 68% YoY on the Blackwell ramp, and NVIDIA describes itself as "a data center scale AI infrastructure company reshaping all industries." The 10-K frames named rivals as parties who "provide or intend to provide" GPUs/accelerators — incumbent-leader positioning.

source: sec.gov

at parity

The 10-K claims no share figure or rank in any segment. It says 'Our businesses compete with numerous global and local companies'. Its HPC and AI business 'competes primarily with global manufacturers of HPC and AI products and services'. For fault-tolerant solutions it says 'we primarily compete with manufacturers of enterprise servers and industrial computers'. Its memory business competes 'against memory module providers and, to a lesser extent, large semiconductor manufacturers'. The risk factors warn that larger competitors 'may be able to respond better to new or emerging technologies, such as generative AI'. Against that, the company's stated edge is customization and service, where it says some large rivals 'tend to have limited customization and service capabilities'. Its leadership language is self-description without share figures: Cree LED 'has been a leader in LED lighting technology', Stratus Technologies is 'a global leader in simplified, protected and autonomous computing platforms and services', and the memory business is 'a primary supplier of longer-lifecycle solutions to OEM customers'. A specialist that claims no rank and faces many larger, lower-cost rivals, while neither leading nor clearly trailing in its niches, is parity.

source: sec.gov

Pricing power weak

The 10-K says competition "has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive". It adds that if customers cut usage "we may be compelled to lower our prices or risk losing a significant customer". At Barber Lake, Cipher agreed to absorb "the first $359.3 million of costs in excess of the initial budgeted amount", with the tenant reimbursing "50% of any such costs above that amount" (2026-09-25, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000043/barberlakeleaseamendmentpr.htm). Its one input-cost edge is specific to mining: Odessa's power costs about 2.8 c/kWh under the Luminant contract, available "until at least July 2027". A landlord that concedes cost overruns to its tenants has weak pricing power.

source: sec.gov

strong

FY2026 gross margin was 71.1% (75.0% in FY2025); per the 10-K MD&A the ~3.9pt decline reflects the Hopper HGX→Blackwell full-system mix shift and a one-time $4.5B H20 excess-inventory/purchase-obligation charge, not competitive price erosion. A low-70s% hardware gross margin evidences strong pricing power.

source: sec.gov

weak

The FY2025 10-K describes price as set by customers and the market. It says its large customers 'are able to exert, have exerted and we expect will continue to exert, pressure on us to make concessions on price and on terms and conditions'. It says 'The markets for our Integrated Memory products have historically been characterized by declines in average selling prices', and that 'Competitive pressure has led in the past and may continue to lead to intensified price competition resulting in lower net sales and lower profit margins'. Gross margin held in a narrow band: 28.8% in fiscal 2023, 29.1% in fiscal 2024 and 28.8% in fiscal 2025. The filing attributes each move to mix, for example higher-margin Advanced Computing service revenue in 2024, not to pricing. The 10-Q for the quarter ended May 29, 2026 (filed 2026-07-07, https://www.sec.gov/Archives/edgar/data/1616533/000161653326000043/peng-20260529.htm) reports gross margin of 27.8% versus 29.3% a year earlier (27.7% versus 28.9% for nine months), which it attributes to the Penguin Edge wind-down and sales mix. Third-quarter Integrated Memory sales rose 111.4% (75.6% for nine months) as 'accelerating AI-driven demand drove favorable pricing and increased volume', and the 10-Q says that business has 'gross margins which are lower than the Company average'.

source: sec.gov

Summary

Cipher built bitcoin mining data centres in Texas and is now developing single-tenant AI and HPC campuses for lease to hyperscalers. Its 10-K reports a portfolio of "4.2 gigawatts ("GW") of capacity across 10 sites". It lists a 15-year Amazon Web Services lease for about 300 MW of turnkey capacity at Black Pearl and a Fluidstack lease at Barber Lake (300 MW gross) under which Google "has agreed to backstop certain obligations of Fluidstack". It describes bitcoin mining at Odessa on a Luminant power contract at about 2.8 c/kWh. In 2026 it signed a third campus lease "with an investment-grade Hyperscale tenant" (Q1 2026 update, 2026-05-05), delivered first Black Pearl capacity in August "two months ahead of the original schedule" with rent commenced, and fully funded its Stingray development with a bond (Q2 2026 update). On 2026-09-25 it said Barber Lake's contracted life was extended from 10 to 20 years, taking contracted revenue at the site "from $3.8 billion to over $9 billion". The 10-K says Odessa was "the first bitcoin mining data center awarded the Management and Operations, or M&O, Stamp of Approval award from the Uptime Institute", which is independent recognition of how the company operates. Against this, the latest quarter's revenue was still bitcoin mining and fell to $25 million. The 10-K describes growing "competition and pricing pressure", single-tenant concentration, and termination rights for construction delays. The Barber Lake schedule was reset, and Cipher absorbs the first $359.3 million of cost overruns. Cipher's contracted pipeline is substantial, but a competitive advantage is not yet demonstrated, so it is rated as having no moat. That could change to narrow once its leased campuses are delivered and paying rent.

NVIDIA pairs market-leading accelerated-computing hardware (the Blackwell data-center platform) with a proprietary full-stack software moat — CUDA plus hundreds of domain libraries — funded by $76.7B of cumulative R&D, and its "large and growing number of developers and installed base... strengthens our ecosystem and increases the value of our platform for our customers" (FY2026 10-K). Competition is intensifying from AMD, Intel and Huawei, and from hyperscalers (Alphabet, Amazon, Microsoft) designing internal AI silicon, but rivals must overcome NVIDIA's entrenched CUDA software ecosystem to displace it.

Penguin Solutions (formerly SMART Global Holdings) has three reportable segments per the FY2025 10-K. Advanced Computing ($648.4 million of fiscal 2025 net sales) designs, builds, deploys and manages AI and HPC clusters under OriginAI with the ICE ClusterWare software, and sells Stratus fault-tolerant servers. Integrated Memory ($464.2 million) sells SMART Modular specialty DRAM, flash and CXL memory and supply-chain services. Optimized LED ($256.1 million) sells Cree LED chips and components. Its advantage is customization rather than size. The filing says its memory business collaborates with OEMs 'throughout their design process across multiple projects' and is 'a primary supplier of longer-lifecycle solutions to OEM customers' in industrial, government, networking and enterprise markets. Its products must pass product- and platform-specific qualification, and some large rivals focus on higher-volume, industry-standard products. The limits are just as clear. Many competitors are larger and have lower cost structures. Customers buy on purchase orders, the ten largest were 66% of fiscal 2025 sales, and they 'have exerted' pressure for price concessions. Integrated Memory has historically seen declining average selling prices. AI hardware revenue is project-driven: Advanced Computing sales fell 26.0% in fiscal 2024 on 'the unpredictable nature of large project engagements'. The 10-Q for the quarter ended May 29, 2026 (filed 2026-07-07, https://www.sec.gov/Archives/edgar/data/1616533/000161653326000043/peng-20260529.htm) says the AI infrastructure business is 'transitioning from a hyperscaler concentration toward a more diversified non-hyperscaler customer base across enterprise, neocloud, and sovereign AI', which 'may negatively impact our net sales during the transition'. The result is a set of design-in niches rather than a franchise, with an AI business that must keep re-winning large deployments.

Chain position

Cipher develops single-tenant, powered data-centre campuses for hyperscale and AI tenants: Amazon at Black Pearl, Fluidstack (backstopped by Google) at Barber Lake, and an unnamed investment-grade hyperscaler at a third campus. Meanwhile it winds down bitcoin mining.

Upstream compute-platform supplier: NVIDIA sells full-stack data-center systems (GPU + Arm CPU + DPU + NVLink/InfiniBand networking + CUDA software) to cloud providers and enterprises, and relies on third-party foundry/assembly-test-packaging partners (e.g., SPIL, Amkor, Wistron, Fabrinet). Per the FY2026 10-K, several of its largest customers (hyperscalers such as Amazon, Alphabet, Microsoft) are simultaneously customers and emerging competitors developing internal accelerated-computing silicon.

Downstream integrator. Per the 10-K it buys memory from Samsung, Micron, SK hynix and Kioxia and processors from Intel and AMD, and turns them into specialty memory modules and managed AI/HPC clusters for OEM, enterprise, government and cloud customers.

Products (share / barrier)
  • Bitcoin mining (Odessa) Unknown · Low source: sec.gov
  • HPC data center leasing (Black Pearl, Barber Lake, Stingray) Challenger · Moderate source: sec.gov
  • CUDA accelerated-computing software platform (CUDA-X, NVIDIA AI Enterprise) Leader · Deep source: sec.gov
  • Data Center AI accelerators (GPU — Blackwell/Hopper) Leader · Deep source: sec.gov
  • Data-center networking / interconnect (NVLink, InfiniBand, Spectrum Ethernet, DPUs) Top 3 · Moderate source: sec.gov
  • AI and HPC infrastructure (OriginAI, ICE ClusterWare) Unknown · Low source: sec.gov
  • Cree LED chips and components (XLamp, J Series, high-brightness SMD) Unknown · Low source: sec.gov
  • SMART Modular specialty memory and storage (DRAM modules, Zefr, CXL, flash/SSD) Niche · Moderate source: sec.gov
  • Stratus fault-tolerant computing (ztC Endurance, ftServer, ztC Edge, everRun) Niche · Low source: sec.gov
Long-horizon vote -0.06 at weight 0.20 · swarm bearish

Editorial prior, not backtested.

see exactly how it voted →

+0.42 at weight 0.20 · swarm bullish

Editorial prior, not backtested.

see exactly how it voted →

-0.06 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →