Skip to content

Compare moats

Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.

comparing Cipher Mining×NVIDIA×Vistra× maximum of 3 — remove one to swap
Cipher Mining CIFR ai moat: latest change 2026-02-24 NVIDIA NVDA ai moat: latest change 2026-02-25 Vistra VST ai moat: latest change 2026-08-06
Moat rating none

Cipher (renamed Cipher Digital Inc. on 20 February 2026) holds signed, credit-supported leases but has not yet shown that they amount to a durable advantage. Its 2025 Form 10-K (filed 2026-02-24) says "Through the end of 2025, our revenue has been derived from mining bitcoin". Its Q2 2026 business update (2026-08-04, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/q226_earningsxprxdraftxvf.htm) reported "Q2 2026 Revenue of $25 million", and its first HPC rent began only in August 2026 at Black Pearl. The 10-K's own risk factors describe a contested market. They say "There has been an increasing number of businesses constructing HPC data centers, which has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive", that "our data centers are single-tenant properties", and that lessees "will have the right to terminate the lease if there are significant delays in the completion of construction". At Barber Lake, where the 10-K targeted Phase I delivery "by September 30, 2026", a September 2026 amendment, made "In connection with change orders and the continued evolution of tenant requirements", moved data-hall deliveries to the fourth quarter of 2026 through the first quarter of 2027. Under it, Cipher "will bear the first $359.3 million of costs in excess of the initial budgeted amount" (2026-09-25). There is real counter-evidence: a 15-year Amazon lease, a Google-backstopped Fluidstack lease whose contracted life a "leading AI lab" extended to 20 years, and a third lease with an investment-grade hyperscale tenant. Until that capacity is delivered and paying rent, though, a moat is not shown, so the band is none.

source: sec.gov

wide

Wide: the CUDA software platform and its developer installed base create high switching costs across the AI-training stack, defended by $76.7B cumulative R&D and reinforced by ~71% FY2026 gross margins and Data Center revenue (~90% of total) up 68% YoY — durable, hard-to-replicate advantages per the FY2026 10-K.

source: sec.gov

narrow

The 10-K states that "the majority of our facilities operate as “merchant” facilities without long-term power sales agreements" and that Vistra is "not guaranteed any rate of return on our capital investments". Against that, the scarcity is real: six NRC-licensed nuclear units totalling 6,448 MW, licences running 2036-2053, inside a 43,641 MW fleet, plus 20-year PPAs with AWS (1,200 MW) and Meta (2,609 MW). The 2025 gas additions - Lotus (2,600 MW, closed October 2025) and pending Cogentrix (5,500 MW) - extend the merchant gas side, not the nuclear scarcity. Only the 433 MW of uprates extends the moat asset.

source: sec.gov

Moat type none

No moat source is demonstrated yet. Switching costs are the most likely candidate, since the leases are long (15 years at Black Pearl; Barber Lake now a 20-year contracted life) and each site has a single tenant. But the 10-K says tenant guarantees "will only be effective after rent commencement under such leases and are subject to certain limitations", and by August 2026 rent had begun at only one site. The advantages the 10-K claims are the company's own. It speaks of "industry-leading expertise in originating and securing industrial-scale, greenfield data center sites" and of securing West Texas land "on more favorable terms than in more established data center markets". The same document says "there is significant competition for power capacity and energized facilities". Intellectual property is modest: "four granted United States patents and one issued patent in Taiwan". With 66 full-time employees, Cipher has no scale advantage over the competitors it names: CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers.

source: sec.gov

intangibles ip

The durable edge rests on proprietary IP and software: the full-stack CUDA development platform running on all NVIDIA GPUs plus hundreds of proprietary domain libraries/SDKs/APIs, and $76.7B cumulative R&D yielding "inventions that are essential to modern computing" (NVIDIA invented the GPU in 1999). This is reinforced by developer-ecosystem network effects and CUDA switching costs, per the FY2026 10-K Business section.

source: sec.gov

intangibles ip

The intangibles are non-replicable regulatory assets rather than patents: six nuclear licences (Comanche Peak 2050/2053, Perry 2046, Davis-Besse 2037, Beaver Valley 2036/2047), fuel "contracted to support all our refueling needs through 2030", section 45U credits "recognizing the value of existing carbon-free nuclear power", and TXU Energy, sold "for over 20 years" and "registered and protected by trademark law". Read 45U as a floor, not moat strength: the 2025 credit was $220m against $545m in 2024, and it "provides increasing levels of support as unit revenues decline". Efficient scale does not apply.

source: sec.gov

Leadership fast follower

No independent share or rank was found. The 10-K names CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers as competitors, along with miners that have "signed leases with hyperscalers and HPC tenants": Hut 8, IREN, TeraWulf, Core Scientific and Applied Digital. Cipher has signed hyperscale-grade tenants (Amazon; Fluidstack with a Google backstop; a third investment-grade hyperscaler) but delivered its first HPC capacity only in August 2026 (Q2 2026 update). That makes it a fast follower. Its self-description as "a leading developer, owner, and operator of industrial-scale data centers" is the company's own claim and is not counted.

source: sec.gov

clear leader

FY2026 Data Center revenue was $193.7B (~90% of the $215.9B total), up 68% YoY on the Blackwell ramp, and NVIDIA describes itself as "a data center scale AI infrastructure company reshaping all industries." The 10-K frames named rivals as parties who "provide or intend to provide" GPUs/accelerators — incumbent-leader positioning.

source: sec.gov

co leader

Vistra describes itself as "one of the largest producers of power in deregulated markets in the U.S." with over 230 TWh generated, "one of the largest competitive power generators in the U.S. as measured by MWh of generation capacity", "one of the largest electricity generators in the U.S.", and "one of the largest competitive residential retail electricity providers". That hedged phrasing appears four times and is the strongest claim the filing makes. The 10-K names no competitor and assigns no rank, so co-leader is the ceiling the disclosure supports.

source: sec.gov

Pricing power weak

The 10-K says competition "has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive". It adds that if customers cut usage "we may be compelled to lower our prices or risk losing a significant customer". At Barber Lake, Cipher agreed to absorb "the first $359.3 million of costs in excess of the initial budgeted amount", with the tenant reimbursing "50% of any such costs above that amount" (2026-09-25, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000043/barberlakeleaseamendmentpr.htm). Its one input-cost edge is specific to mining: Odessa's power costs about 2.8 c/kWh under the Luminant contract, available "until at least July 2027". A landlord that concedes cost overruns to its tenants has weak pricing power.

source: sec.gov

strong

FY2026 gross margin was 71.1% (75.0% in FY2025); per the 10-K MD&A the ~3.9pt decline reflects the Hopper HGX→Blackwell full-system mix shift and a one-time $4.5B H20 excess-inventory/purchase-obligation charge, not competitive price erosion. A low-70s% hardware gross margin evidences strong pricing power.

source: sec.gov

weak

Vistra is a merchant price taker. Price formation rests on "the highest variable cost unit that clears the market", prices are "unpredictable and may fluctuate substantially", hedging markets have "limited liquidity after two to three years", and competing retailers "may offer different products, lower electricity prices and other incentives". ERCOT's $2,000/MWh figure is the low system-wide offer cap, applied conditionally when the peaker net margin exceeds three times CONE or under the PUCT Emergency Pricing Program, not a standing cap. PJM has "announced that it would propose" extending its capacity cap to 2028-29 and 2029-30, subject to FERC approval.

source: sec.gov

Summary

Cipher built bitcoin mining data centres in Texas and is now developing single-tenant AI and HPC campuses for lease to hyperscalers. Its 10-K reports a portfolio of "4.2 gigawatts ("GW") of capacity across 10 sites". It lists a 15-year Amazon Web Services lease for about 300 MW of turnkey capacity at Black Pearl and a Fluidstack lease at Barber Lake (300 MW gross) under which Google "has agreed to backstop certain obligations of Fluidstack". It describes bitcoin mining at Odessa on a Luminant power contract at about 2.8 c/kWh. In 2026 it signed a third campus lease "with an investment-grade Hyperscale tenant" (Q1 2026 update, 2026-05-05), delivered first Black Pearl capacity in August "two months ahead of the original schedule" with rent commenced, and fully funded its Stingray development with a bond (Q2 2026 update). On 2026-09-25 it said Barber Lake's contracted life was extended from 10 to 20 years, taking contracted revenue at the site "from $3.8 billion to over $9 billion". The 10-K says Odessa was "the first bitcoin mining data center awarded the Management and Operations, or M&O, Stamp of Approval award from the Uptime Institute", which is independent recognition of how the company operates. Against this, the latest quarter's revenue was still bitcoin mining and fell to $25 million. The 10-K describes growing "competition and pricing pressure", single-tenant concentration, and termination rights for construction delays. The Barber Lake schedule was reset, and Cipher absorbs the first $359.3 million of cost overruns. Cipher's contracted pipeline is substantial, but a competitive advantage is not yet demonstrated, so it is rated as having no moat. That could change to narrow once its leased campuses are delivered and paying rent.

NVIDIA pairs market-leading accelerated-computing hardware (the Blackwell data-center platform) with a proprietary full-stack software moat — CUDA plus hundreds of domain libraries — funded by $76.7B of cumulative R&D, and its "large and growing number of developers and installed base... strengthens our ecosystem and increases the value of our platform for our customers" (FY2026 10-K). Competition is intensifying from AMD, Intel and Huawei, and from hyperscalers (Alphabet, Amazon, Microsoft) designing internal AI silicon, but rivals must overcome NVIDIA's entrenched CUDA software ecosystem to displace it.

Vistra's moat is one scarce asset wrapped in a commodity business. Six NRC-licensed nuclear units - 6,448 MW, licences running 2036-2053 - sit inside a 43,641 MW fleet that the 10-K says operates in the majority as "merchant" facilities with no long-term power sales agreements and no guaranteed rate of return. That block cannot be rebuilt by a rival, and is now partly de-risked by 20-year PPAs with AWS (1,200 MW from Comanche Peak) and Meta (2,609 MW from the PJM plants) plus section 45U credits. Everything else - 26,989 MW of gas, 8,743 MW of coal, the 5m-customer retail book - competes on price in markets Vistra does not set, against entrants the filing says keep building "despite relatively low power prices". The 2025 growth was gas M&A (Lotus, pending Cogentrix), which widens the commodity-exposed side. Narrow, for a specific reason: the moat is 15% of the fleet.

Chain position

Cipher develops single-tenant, powered data-centre campuses for hyperscale and AI tenants: Amazon at Black Pearl, Fluidstack (backstopped by Google) at Barber Lake, and an unnamed investment-grade hyperscaler at a third campus. Meanwhile it winds down bitcoin mining.

Upstream compute-platform supplier: NVIDIA sells full-stack data-center systems (GPU + Arm CPU + DPU + NVLink/InfiniBand networking + CUDA software) to cloud providers and enterprises, and relies on third-party foundry/assembly-test-packaging partners (e.g., SPIL, Amkor, Wistron, Fabrinet). Per the FY2026 10-K, several of its largest customers (hyperscalers such as Amazon, Alphabet, Microsoft) are simultaneously customers and emerging competitors developing internal accelerated-computing silicon.

Merchant IPP: sells energy, capacity and ancillary services into ISO/RTO spot and short-term wholesale markets (ERCOT, PJM, ISO-NE, NYISO, CAISO, MISO) and resells to ~5m retail customers. Emerging role as long-term nuclear offtake supplier to hyperscalers (AWS, Meta). Not a price setter at any link.

Products (share / barrier)
  • Bitcoin mining (Odessa) Unknown · Low source: sec.gov
  • HPC data center leasing (Black Pearl, Barber Lake, Stingray) Challenger · Moderate source: sec.gov
  • CUDA accelerated-computing software platform (CUDA-X, NVIDIA AI Enterprise) Leader · Deep source: sec.gov
  • Data Center AI accelerators (GPU — Blackwell/Hopper) Leader · Deep source: sec.gov
  • Data-center networking / interconnect (NVLink, InfiniBand, Spectrum Ethernet, DPUs) Top 3 · Moderate source: sec.gov
  • Coal and lignite generation fleet Unknown · Low source: sec.gov
  • Long-term large-load / data-centre power offtake (AWS and Meta PPAs) Unknown · Deep source: sec.gov
  • Natural gas generation fleet (CCGT and peaking) Unknown · Low source: sec.gov
  • Nuclear generation fleet (Comanche Peak, Perry, Davis-Besse, Beaver Valley) Unknown · Deep source: sec.gov
  • Retail electricity and natural gas (TXU Energy, Ambit, Dynegy Energy Services, Homefield, Energy Harbor, U.S. Gas & Electric) Unknown · Low source: sec.gov
  • Vistra Zero - solar and battery energy storage Unknown · Low source: sec.gov
Long-horizon vote -0.06 at weight 0.20 · swarm bearish

Editorial prior, not backtested.

see exactly how it voted →

+0.42 at weight 0.20 · swarm bullish

Editorial prior, not backtested.

see exactly how it voted →

+0.05 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →