Skip to content

Compare moats

Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.

comparing Cipher Mining×Pegatron× add + AMD AMD+ ASE Technology Holding ASX+ ASM International ASMIY+ ASML ASML+ ASMPT ASMVY+ ASUSTeK Computer ASUUY+ Adobe ADBE+ Advantest ATEYY+ Alibaba Group BABA+ Alphabet GOOGL+ Amazon AMZN+ Ambarella AMBA+ Amkor Technology AMKR+ Amphenol APH+ AppLovin APP+ Apple AAPL+ Applied Digital APLD+ Applied Materials AMAT+ Applied Optoelectronics AAOI+ Arista Networks ANET+ Arm Holdings ARM+ Astera Labs ALAB+ Axcelis Technologies ACLS+ Baidu BIDU+ Bloom Energy BE+ Broadcom AVGO+ C3.ai AI+ CXMT 688825.SS+ Cadence Design Systems CDNS+ Camtek CAMT+ Celestica CLS+ Cerebras Systems CBRS+ ChipMOS Technologies IMOS+ Ciena CIEN+ Cisco Systems CSCO+ Cloudflare NET+ Coca-Cola KO+ Coherent Corp COHR+ Comfort Systems USA FIX+ Constellation Energy CEG+ Core Scientific CORZ+ CoreWeave CRWV+ Corning GLW+ Credo Technology CRDO+ CrowdStrike CRWD+ Datadog DDOG+ Deere & Company DE+ Dell Technologies DELL+ Digital Realty Trust DLR+ DigitalOcean DOCN+ Disco Corporation DSCSY+ Duolingo DUOL+ EMCOR Group EME+ Eaton ETN+ Eli Lilly and Company LLY+ Equinix EQIX+ Everpure, Inc. P+ Everspin Technologies MRAM+ Extreme Networks EXTR+ Fabrinet FN+ Flex FLEX+ FormFactor FORM+ GE Vernova GEV+ Gigabyte Technology 2376.TW+ GitLab GTLB+ GlobalFoundries GFS+ Hewlett Packard Enterprise HPE+ Hon Hai Precision (Foxconn) HNHPF+ Hua Hong Semiconductor 1347.HK+ Hut 8 HUT+ IBM IBM+ IREN IREN+ Intel INTC+ Inventec 2356.TW+ Iron Mountain IRM+ JCET Group 600584.SS+ JPMorgan Chase JPM+ Jabil JBL+ Johnson Controls International JCI+ KLA Corporation KLAC+ Kioxia Holdings KXIAY+ Kulicke & Soffa KLIC+ Lam Research LRCX+ Lattice Semiconductor LSCC+ Lenovo Group LNVGY+ Lumentum Holdings LITE+ MACOM Technology Solutions MTSI+ Macronix International 2337.TW+ Marvell Technology MRVL+ MaxLinear MXL+ MediaTek 2454.TW+ Meta Platforms META+ MiTAC Holdings 3706.TW+ Micron MU+ Microsoft MSFT+ MiniMax 0100.HK+ Moderna MRNA+ Modine Manufacturing MOD+ MongoDB MDB+ Montage Technology 688008.SS+ NVIDIA NVDA+ Nanya Technology 2408.TW+ Nebius Group NBIS+ NetApp NTAP+ Netflix NFLX+ Netlist NLST+ Nokia NOK+ Nova Ltd NVMI+ Onto Innovation ONTO+ Oracle ORCL+ Palantir Technologies PLTR+ Palo Alto Networks PANW+ Penguin Solutions PENG+ Pfizer PFE+ Phison Electronics 8299.TWO+ Powell Industries, Inc. POWL+ Powerchip Semiconductor Manufacturing Corporation 6770.TW+ Powertech Technology 6239.TW+ Qualcomm QCOM+ Quanta Computer 2382.TW+ RELX plc RELX+ Rambus RMBS+ SAP SAP+ SK Hynix SKHY+ Salesforce CRM+ Samsung Electronics 005930.KS+ SanDisk SNDK+ Sanmina SANM+ Schneider Electric SBGSY+ Seagate Technology STX+ Semiconductor Manufacturing International Corporation 0981.HK+ Semtech SMTC+ ServiceNow NOW+ Silicon Motion Technology SIMO+ Snowflake SNOW+ SoundHound AI SOUN+ Space Exploration Technologies Corp. (SpaceX) SPCX+ Super Micro Computer SMCI+ Synopsys SNPS+ TE Connectivity TEL+ TSMC TSM+ Talen Energy TLN+ Tempus AI TEM+ Tencent Holdings TCEHY+ TeraWulf WULF+ Teradyne TER+ Tesla, Inc. TSLA+ The Walt Disney Company DIS+ Tokyo Electron 8035.T+ Tongfu Microelectronics 002156.SZ+ Tower Semiconductor TSEM+ Trane Technologies TT+ United Microelectronics Corporation UMC+ Vanguard International Semiconductor 5347.TWO+ Vertiv VRT+ Visa V+ Vistra VST+ Walmart WMT+ Western Digital WDC+ Winbond Electronics 2344.TW+ Wistron 3231.TW+ Wiwynn 6669.TW+ X-FAB Silicon Foundries XFAB.PA+ X-energy XE+ Zhipu AI 2513.HK+ nVent Electric NVT
Cipher Mining CIFR ai moat: latest change 2026-02-24 Pegatron 4938.TW ai moat: latest change 2026-05-08
Moat rating none

Cipher (renamed Cipher Digital Inc. on 20 February 2026) holds signed, credit-supported leases but has not yet shown that they amount to a durable advantage. Its 2025 Form 10-K (filed 2026-02-24) says "Through the end of 2025, our revenue has been derived from mining bitcoin". Its Q2 2026 business update (2026-08-04, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/q226_earningsxprxdraftxvf.htm) reported "Q2 2026 Revenue of $25 million", and its first HPC rent began only in August 2026 at Black Pearl. The 10-K's own risk factors describe a contested market. They say "There has been an increasing number of businesses constructing HPC data centers, which has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive", that "our data centers are single-tenant properties", and that lessees "will have the right to terminate the lease if there are significant delays in the completion of construction". At Barber Lake, where the 10-K targeted Phase I delivery "by September 30, 2026", a September 2026 amendment, made "In connection with change orders and the continued evolution of tenant requirements", moved data-hall deliveries to the fourth quarter of 2026 through the first quarter of 2027. Under it, Cipher "will bear the first $359.3 million of costs in excess of the initial budgeted amount" (2026-09-25). There is real counter-evidence: a 15-year Amazon lease, a Google-backstopped Fluidstack lease whose contracted life a "leading AI lab" extended to 20 years, and a third lease with an investment-grade hyperscale tenant. Until that capacity is delivered and paying rent, though, a moat is not shown, so the band is none.

source: sec.gov

none

The 2025 annual report (English version filed with TWSE on 2026-05-08) shows scale without a protected position. Consolidated revenue was NT$1,117.2 billion, down from NT$1,125.3 billion, at a gross margin of 3.80%, while DigiTimes put the top 20 EMS/ODM vendors' combined 2025 revenue up 23.4% in US dollars (cnyes, 2026-02-02). One coded customer ("A Company") took 57.34% of 2025 net sales (59.34% in 2024) and a second ("B Company") 9.14%, and the report lists "Intense Competition and Pricing Pressure" and "Customer Concentration and Product Cycle Risks" among its disadvantages. A DigiTimes analysis of the 2024 top 20 (2025-01-27) found Pegatron's net-profit rank six places below its revenue rank, and its net margin at 1.5% or less since 2018 with no clear sign of improvement. A large assembler whose own report and independent data describe no protected return: no moat is claimable.

source: doc.twse.com.tw

Moat type none

No moat source is demonstrated yet. Switching costs are the most likely candidate, since the leases are long (15 years at Black Pearl; Barber Lake now a 20-year contracted life) and each site has a single tenant. But the 10-K says tenant guarantees "will only be effective after rent commencement under such leases and are subject to certain limitations", and by August 2026 rent had begun at only one site. The advantages the 10-K claims are the company's own. It speaks of "industry-leading expertise in originating and securing industrial-scale, greenfield data center sites" and of securing West Texas land "on more favorable terms than in more established data center markets". The same document says "there is significant competition for power capacity and energized facilities". Intellectual property is modest: "four granted United States patents and one issued patent in Taiwan". With 66 full-time employees, Cipher has no scale advantage over the competitors it names: CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers.

source: sec.gov

none

The report's listed competitive advantages are operating capabilities that rivals also have: 4,997 R&D engineers, manufacturing sites in China, the USA, Mexico, the Czech Republic, Indonesia, Vietnam, Malaysia, India and Taiwan, a diversified product and customer base, global logistics, an experienced management team, and vertical integration across materials from metal stamping and plastic injection to light-metal technologies. R&D was 1.44% of 2025 revenue, and the supplier table notes that "partial major materials are purchased by major customers and resell to the Company for manufacturing and system assembly". Its seat in Apple's supply chain has proved contestable: DigiTimes (via Global SMT, 2025-07-24) says Chinese vendors, "most notably Luxshare, have gained ground through acquisitions and key contract wins, including major entries into Apple's supply chain via asset purchases from Merry Electronics, Lite-On, Wistron, and Pegatron". DigiTimes' analyst wrote (2025-01-27) that Pegatron, Wistron, Compal and Inventec all began as computer-system makers whose component businesses and degree of vertical integration can hardly match those of Chinese makers.

source: doc.twse.com.tw

Leadership fast follower

No independent share or rank was found. The 10-K names CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers as competitors, along with miners that have "signed leases with hyperscalers and HPC tenants": Hut 8, IREN, TeraWulf, Core Scientific and Applied Digital. Cipher has signed hyperscale-grade tenants (Amazon; Fluidstack with a Google backstop; a third investment-grade hyperscaler) but delivered its first HPC capacity only in August 2026 (Q2 2026 update). That makes it a fast follower. Its self-description as "a leading developer, owner, and operator of industrial-scale data centers" is the company's own claim and is not counted.

source: sec.gov

behind

DigiTimes' July 2025 ranking (via Global SMT, 2025-07-24) says "Pegatron had long held the second spot" until Quanta overtook it in 1H24, that "Luxshare displaced Pegatron to become the No. 3 EMS/ODM vendor in the second half of 2024", and ranks it fourth in 1H25 after Wistron's surge. DigiTimes' 2025 full-year ranking (cnyes, 2026-02-02) lists the top five in order as Foxconn, Wistron, Quanta, Luxshare and Pegatron. In notebooks, market research cited in the annual report puts Pegatron fifth of the five Taiwanese ODMs it lists, at 9.1 million units or 4.96% of worldwide volume. Its 2025 revenue fell 0.73% in NT dollars (annual report) while DigiTimes put Foxconn's up 22.4% and Quanta's up 55.6% in US dollars (cnyes), and 1H26 revenue fell again, by 3.9% to NT$518,553 million (2Q26 business review): losing ground to peers, so behind rather than at parity.

source: doc.twse.com.tw

Pricing power weak

The 10-K says competition "has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive". It adds that if customers cut usage "we may be compelled to lower our prices or risk losing a significant customer". At Barber Lake, Cipher agreed to absorb "the first $359.3 million of costs in excess of the initial budgeted amount", with the tenant reimbursing "50% of any such costs above that amount" (2026-09-25, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000043/barberlakeleaseamendmentpr.htm). Its one input-cost edge is specific to mining: Odessa's power costs about 2.8 c/kWh under the Luminant contract, available "until at least July 2027". A landlord that concedes cost overruns to its tenants has weak pricing power.

source: sec.gov

weak

The annual report gives a 2025 gross margin of 3.80%, with gross profit down 7.67% on net sales down 0.73%; the 2Q26 business review shows 1H26 gross margin of 4.4% against 3.4% a year earlier. Among its disadvantages the report says "increasing competition may place pressure on pricing and profitability". DigiTimes (2025-01-27) counted Pegatron among Taiwanese makers whose net margin had been 1.5% or less since 2018, with no clear sign of improvement.

source: doc.twse.com.tw

Summary

Cipher built bitcoin mining data centres in Texas and is now developing single-tenant AI and HPC campuses for lease to hyperscalers. Its 10-K reports a portfolio of "4.2 gigawatts ("GW") of capacity across 10 sites". It lists a 15-year Amazon Web Services lease for about 300 MW of turnkey capacity at Black Pearl and a Fluidstack lease at Barber Lake (300 MW gross) under which Google "has agreed to backstop certain obligations of Fluidstack". It describes bitcoin mining at Odessa on a Luminant power contract at about 2.8 c/kWh. In 2026 it signed a third campus lease "with an investment-grade Hyperscale tenant" (Q1 2026 update, 2026-05-05), delivered first Black Pearl capacity in August "two months ahead of the original schedule" with rent commenced, and fully funded its Stingray development with a bond (Q2 2026 update). On 2026-09-25 it said Barber Lake's contracted life was extended from 10 to 20 years, taking contracted revenue at the site "from $3.8 billion to over $9 billion". The 10-K says Odessa was "the first bitcoin mining data center awarded the Management and Operations, or M&O, Stamp of Approval award from the Uptime Institute", which is independent recognition of how the company operates. Against this, the latest quarter's revenue was still bitcoin mining and fell to $25 million. The 10-K describes growing "competition and pricing pressure", single-tenant concentration, and termination rights for construction delays. The Barber Lake schedule was reset, and Cipher absorbs the first $359.3 million of cost overruns. Cipher's contracted pipeline is substantial, but a competitive advantage is not yet demonstrated, so it is rated as having no moat. That could change to narrow once its leased campuses are delivered and paying rent.

Pegatron is a Taiwanese EMS/ODM whose 2025 annual report describes three segments: computing (notebooks, desktops, motherboards, servers), communication (cable modems, set-top boxes, smartphones, switches, routers, gateways, 5G O-RAN) and consumer electronics (tablets, game consoles, wearables, smart home devices, automotive electronics). Communication remained the largest segment in 2025, and one coded customer took 57.34% of net sales. Revenue was NT$1,117.2 billion at a 3.80% gross margin. Servers are the growth line: the report cites large-scale shipments of NVIDIA GB300 NVL72 and HGX B300 systems in 2025, and the 2Q26 business review (2026-08-12) says computing revenue rose 84% year on year, "driven mostly by greater shipment from Server business", taking computing to 23% of revenue while communication fell to 52% after a double-digit decline. Independent rankings show it losing ground: DigiTimes says Pegatron "had long held the second spot" among EMS/ODM vendors by revenue until Quanta passed it in 1H24, and its 2025 full-year ranking puts it fifth behind Foxconn, Wistron, Quanta and Luxshare, with 2026 AI server and rack orders expected to concentrate in Foxconn, Wistron and Quanta. Gross margin improved to 4.4% in 1H26 from 3.4% a year earlier, still thin. A large, diversified assembler without a protected position.

Chain position

Cipher develops single-tenant, powered data-centre campuses for hyperscale and AI tenants: Amazon at Black Pearl, Fluidstack (backstopped by Google) at Barber Lake, and an unnamed investment-grade hyperscaler at a third campus. Meanwhile it winds down bitcoin mining.

Contract designer-manufacturer for brand customers in computing, communication and consumer electronics; America took 41.18% and Europe 38.79% of 2025 sales, and some major materials are bought by major customers and resold to Pegatron for assembly (annual report).

Products (share / barrier)
  • Bitcoin mining (Odessa) Unknown · Low source: sec.gov
  • HPC data center leasing (Black Pearl, Barber Lake, Stingray) Challenger · Moderate source: sec.gov
Long-horizon vote -0.06 at weight 0.20 · swarm bearish

Editorial prior, not backtested.

see exactly how it voted →

-0.20 at weight 0.20 · swarm bearish

Editorial prior, not backtested.

see exactly how it voted →