Compare moats
Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.
| Cipher Mining | Semiconductor Manufacturing International Corporation | IREN | |
|---|---|---|---|
| Moat rating | none Cipher (renamed Cipher Digital Inc. on 20 February 2026) holds signed, credit-supported leases but has not yet shown that they amount to a durable advantage. Its 2025 Form 10-K (filed 2026-02-24) says "Through the end of 2025, our revenue has been derived from mining bitcoin". Its Q2 2026 business update (2026-08-04, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/q226_earningsxprxdraftxvf.htm) reported "Q2 2026 Revenue of $25 million", and its first HPC rent began only in August 2026 at Black Pearl. The 10-K's own risk factors describe a contested market. They say "There has been an increasing number of businesses constructing HPC data centers, which has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive", that "our data centers are single-tenant properties", and that lessees "will have the right to terminate the lease if there are significant delays in the completion of construction". At Barber Lake, where the 10-K targeted Phase I delivery "by September 30, 2026", a September 2026 amendment, made "In connection with change orders and the continued evolution of tenant requirements", moved data-hall deliveries to the fourth quarter of 2026 through the first quarter of 2027. Under it, Cipher "will bear the first $359.3 million of costs in excess of the initial budgeted amount" (2026-09-25). There is real counter-evidence: a 15-year Amazon lease, a Google-backstopped Fluidstack lease whose contracted life a "leading AI lab" extended to 20 years, and a third lease with an investment-grade hyperscale tenant. Until that capacity is delivered and paying rent, though, a moat is not shown, so the band is none. | narrow TrendForce's 2Q26 foundry ranking (2026-09-09) puts SMIC third worldwide. Its revenue rose 20% QoQ to more than $3 billion and its share 'edged up to 5.4%, narrowing the gap with Samsung' (5.9%), far behind TSMC at 72.5%. TrendForce (2026-04-29, citing Reuters) adds: 'Currently, SMIC remains the only domestic player capable of producing chips using 7nm.' Those advantages are real in its home market, which was 90.2% of 2Q26 revenue per the 2Q26 results. They are also bounded. The 2025 annual report concedes: 'Compared with global industry leaders, the Company remains a certain gap in technical capability, and the current market share is relatively limited.' It warns that numerous domestic and foreign entrants mean 'the production capacity may fall into a state of structural oversupply'. And it notes that 'The Company was added to the U.S. Entity List in 2020', which brings 'certain challenges to the Company's supply chain security and business stability'. | none The FY2026 10-K (filed 2026-08-27) shows IREN holds an input the industry competes on: it names 'access to secured and energized power' first among what it believes are the principal competitive factors in its industry, and reports 'executed grid connection agreements, letters of agreement or equivalents representing approximately 5GW of total power capacity' in the United States, Canada, Spain and Australia as of June 30, 2026. It does not claim an advantage over rivals in that input. It says 'Certain competitors may have access to more competitively priced power, a greater access to power and a better capacity to timely secure grid connections,' and 'Many of our competitors have greater financial, technical or commercial resources, longer cloud operating histories or larger customer bases, compared to us.' Operating AI Cloud Services capacity was approximately 40MW at June 30, 2026, and the stored XBRL fundamentals from this 10-K show an FY2026 operating loss of about $1,046.7M on revenue of about $707.0M, so no durable advantage is yet demonstrated. |
| Moat type | none No moat source is demonstrated yet. Switching costs are the most likely candidate, since the leases are long (15 years at Black Pearl; Barber Lake now a 20-year contracted life) and each site has a single tenant. But the 10-K says tenant guarantees "will only be effective after rent commencement under such leases and are subject to certain limitations", and by August 2026 rent had begun at only one site. The advantages the 10-K claims are the company's own. It speaks of "industry-leading expertise in originating and securing industrial-scale, greenfield data center sites" and of securing West Texas land "on more favorable terms than in more established data center markets". The same document says "there is significant competition for power capacity and energized facilities". Intellectual property is modest: "four granted United States patents and one issued patent in Taiwan". With 66 full-time employees, Cipher has no scale advantage over the competitors it names: CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers. | cost scale The cited advantage is manufacturing scale in a capital-heavy industry. The 2025 annual report says the wafer foundry industry 'has high barriers to entry due to technological hurdles, talent requirements, and continuous capital investment'. It adds that 'The foundries' capacity scale effect and collaboration capabilities in local industry chain have become one of the important factors for customers' assessment of supply chain stability and completeness.' It calls SMIC 'the front runner in Chinese Mainland, with leading manufacturing capability, manufacturing scale and comprehensive services'. Monthly capacity reached 1,058,750 standard logic 8-inch equivalent wafers by the end of 2025, and 1,096,500 in 2Q26 per the 2Q26 results, with 2Q26 capital expenditure of $1,835.7 million. Scale has not protected margins: the report shows gross margin of 21.0% in 2025, 18.0% in 2024 and 19.3% in 2023, against 38.0% in 2022. | none The FY2026 10-K's asserted advantage is control from owning its data centers, 'including the associated land, grid connections and substations', which it believes allows it 'to benefit from more sustainable cash flows and operational flexibility relative to operators that rely upon third-party colocation services or short-term land leases'. Its only scale language is a belief that its 'procurement scale, deployment experience and direct control over the data center layer' lets it bring new compute into service 'rapidly and at scale', a deployment-speed claim, and it 'generally target[s]' regions with 'low-cost and attractive renewable energy sources', a siting target rather than a demonstrated cost position. It does not claim a cost or scale lead: it says 'Many of our competitors are larger, have longer operating histories and significantly greater resources than we do' and that certain competitors 'may have access to more competitively priced power, a greater access to power and a better capacity to timely secure grid connections.' There is no network effect or lock-in either, since existing contracts have 'terms ranging from month to month up to five years'. No enumerated moat source is grounded. |
| Leadership | fast follower No independent share or rank was found. The 10-K names CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers as competitors, along with miners that have "signed leases with hyperscalers and HPC tenants": Hut 8, IREN, TeraWulf, Core Scientific and Applied Digital. Cipher has signed hyperscale-grade tenants (Amazon; Fluidstack with a Google backstop; a third investment-grade hyperscaler) but delivered its first HPC capacity only in August 2026 (Q2 2026 update). That makes it a fast follower. Its self-description as "a leading developer, owner, and operator of industrial-scale data centers" is the company's own claim and is not counted. | fast follower TrendForce's 2Q26 ranking (2026-09-09) places SMIC third at 5.4%, narrowing the gap with second-placed Samsung Foundry (5.9%) but far behind TSMC (72.5%). SMIC's own 2025 annual report ranks it 'the second globally' among pure-play foundries by 2025 sales. On technology it trails. TechInsights (2025-12-11) says SMIC's N+3 'shows meaningful density improvements' but 'remains significantly less scaled than leading commercial 5nm nodes offered by TSMC and Samsung'. The annual report concedes 'a certain gap in technical capability' compared with global industry leaders. | behind The 10-K lists IREN's competitors as hyperscalers (Amazon Web Services, Google Cloud, Microsoft Azure, Oracle Cloud) and specialized AI Cloud Services providers (CoreWeave, Nebius, Crusoe, Lambda, Nscale, SpaceX and others). It says IREN began providing AI Cloud Services in 2024 and cites its 'shorter operating history in AI Cloud Services relative to some competitors', and states 'Some of our competitors have longer operating histories, larger customer bases, more comprehensive IP portfolios and patent protections, more design wins, and greater financial, sales, marketing and distribution resources than we do.' Operating AI Cloud Services capacity was approximately 40MW at June 30, 2026. The filing describes a smaller, later entrant that trails some competitors on operating history, customer base and resources, with its progress so far resting on two anchor contracts (a ~$9.7B five-year Microsoft agreement and a ~$3.4B five-year NVIDIA contract) rather than any claimed category position. |
| Pricing power | weak The 10-K says competition "has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive". It adds that if customers cut usage "we may be compelled to lower our prices or risk losing a significant customer". At Barber Lake, Cipher agreed to absorb "the first $359.3 million of costs in excess of the initial budgeted amount", with the tenant reimbursing "50% of any such costs above that amount" (2026-09-25, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000043/barberlakeleaseamendmentpr.htm). Its one input-cost edge is specific to mining: Odessa's power costs about 2.8 c/kWh under the Luminant contract, available "until at least July 2027". A landlord that concedes cost overruns to its tenants has weak pricing power. | moderate Pricing is improving in a tight market but has been weak through the cycle. The 2025 annual report shows gross margin of 21.0% in 2025, 18.0% in 2024, 19.3% in 2023, 38.0% in 2022 and 30.8% in 2021. In 2Q26 gross margin rose to 25.3% from 20.1% in 1Q26 'due to the increase in average selling price and the product mix change', and the company guided 26% to 28% for 3Q26. TrendForce (2025-12-25) reports price increases 'mainly concentrated on its 8-inch BCD (Bipolar-CMOS-DMOS) process platform and averaging around 10%'. TrendForce (2026-05-22) says SMIC 'negotiated price increases with customers for product categories facing supply shortages'. The annual report warns that if it 'fails to timely deliver competitive process technologies and platforms, it may face customer loss and weakened pricing power'. | weak The 10-K's risk factors state 'Our competitors' products, services and technologies may be cheaper or provide better functionality or features than ours, which has resulted and may in the future result in lower-than-expected selling prices or demand for our products.' They also say long-term contract pricing 'is generally fixed or agreed at the time of contracting', so if market pricing for comparable capacity rises during a contract's term 'we will not benefit from those increases with respect to capacity already committed under our existing long-term contracts', and that if customers suffer a downturn or discontinue its services it 'may be compelled to offer more flexible terms, lower our prices or risk losing a significant customer.' The stored XBRL fundamentals from this 10-K show FY2026 revenue of about $707.0M against an operating loss of about $1,046.7M, so there is no margin record yet that evidences pricing power. |
| Summary | Cipher built bitcoin mining data centres in Texas and is now developing single-tenant AI and HPC campuses for lease to hyperscalers. Its 10-K reports a portfolio of "4.2 gigawatts ("GW") of capacity across 10 sites". It lists a 15-year Amazon Web Services lease for about 300 MW of turnkey capacity at Black Pearl and a Fluidstack lease at Barber Lake (300 MW gross) under which Google "has agreed to backstop certain obligations of Fluidstack". It describes bitcoin mining at Odessa on a Luminant power contract at about 2.8 c/kWh. In 2026 it signed a third campus lease "with an investment-grade Hyperscale tenant" (Q1 2026 update, 2026-05-05), delivered first Black Pearl capacity in August "two months ahead of the original schedule" with rent commenced, and fully funded its Stingray development with a bond (Q2 2026 update). On 2026-09-25 it said Barber Lake's contracted life was extended from 10 to 20 years, taking contracted revenue at the site "from $3.8 billion to over $9 billion". The 10-K says Odessa was "the first bitcoin mining data center awarded the Management and Operations, or M&O, Stamp of Approval award from the Uptime Institute", which is independent recognition of how the company operates. Against this, the latest quarter's revenue was still bitcoin mining and fell to $25 million. The 10-K describes growing "competition and pricing pressure", single-tenant concentration, and termination rights for construction delays. The Barber Lake schedule was reset, and Cipher absorbs the first $359.3 million of cost overruns. Cipher's contracted pipeline is substantial, but a competitive advantage is not yet demonstrated, so it is rated as having no moat. That could change to narrow once its leased campuses are delivered and paying rent. | SMIC is China's largest foundry, running 8-inch and 12-inch fabs in Shanghai, Beijing, Tianjin and Shenzhen. Its 2025 annual report lists mass production on logic, power/analog, high-voltage display driver, embedded and stand-alone non-volatile memory, mixed-signal/RF and CMOS image sensor platforms. 2025 revenue was US$9,326.8 million, up 16.2%. In 2Q26, revenue was $3,005.6 million, gross margin 25.3% and utilization 93.7%, with China at 90.2% of revenue. The tailwind is localization. The report says 'more wafer foundry demand shifting back to domestic', and TrendForce (2026-05-22) says customers in HV processes and CIS 'are increasingly turning to Chinese foundries for more stable pricing and capacity availability'. At the leading edge, TechInsights (2025-12-11) confirmed that Huawei's Kirin 9030 is made on SMIC's N+3, 'a scaled evolution of its 7nm-class technology', reached without EUV lithography. TrendForce (2026-04-29) reports SMIC is the only domestic player capable of 7nm, though Huawei is said to plan shifting part of its AI chip production to Hua Hong. The limits are export controls (Entity List since 2020), a technology gap to TSMC and Samsung that the company itself concedes, and the risk of structural oversupply in China's mature nodes. The verdict is a narrow moat built on domestic scale and being China's only 7nm-capable foundry. It is not a cost or technology lead over the global leaders. | Per its FY2026 10-K, IREN is a vertically integrated AI Cloud Services platform that owns the data center, compute and software layers, underpinned by executed grid connection agreements, letters of agreement or equivalents representing ~5GW and a further multi-GW development pipeline. Its commercial record is concentrated: a five-year Microsoft agreement (~$9.7B total contract value, Horizon 1 delivered and accepted in August 2026, Horizons 2-4 targeted for delivery in phases in calendar Q4 2026) and a five-year ~$3.4B NVIDIA cloud contract together make up a substantial majority of contracted revenue. It holds NVIDIA Preferred Partner and Exemplar Cloud status (HGX B300 and GB300 NVL72) and a strategic partnership intended to support the deployment over time of up to 5GW of NVIDIA DSX-aligned infrastructure, which the filing cites among arrangements that are non-binding or subject to conditions, with no assurance as to the extent of deployments. Against that, the filing names hyperscaler and specialized competitors (AWS, Google Cloud, Azure, Oracle, CoreWeave, Nebius, Crusoe, Lambda, Nscale, SpaceX), many of which it says have greater resources, customers that can use or develop their own solutions, and possible delays to Texas energization from changes to ERCOT's Batch Zero procedures, so the power position is not a demonstrated advantage over rivals and its value depends on execution. |
| Chain position | Cipher develops single-tenant, powered data-centre campuses for hyperscale and AI tenants: Amazon at Black Pearl, Fluidstack (backstopped by Google) at Barber Lake, and an unnamed investment-grade hyperscaler at a third campus. Meanwhile it winds down bitcoin mining. | Upstream logic and specialty wafer foundry, mainly for Chinese chip designers. In 2Q26, 90.2% of revenue came from China. By application, consumer electronics was 44.2% of wafer revenue, smartphone 16.9%, industrial and automotive 16.5%, computer and tablet 15.6%, and connectivity and IoT 6.8%. | Downstream AI-cloud operator: owns grid-connected data centers and deploys NVIDIA/AMD GPU systems it rents to hyperscalers, frontier labs, AI developers and enterprises (anchor customers Microsoft and NVIDIA). |
| Products (share / barrier) |
|
|
|
| Long-horizon vote | -0.06 at weight 0.20 · swarm bearish Editorial prior, not backtested. | +0.06 at weight 0.20 · swarm neutral Editorial prior, not backtested. | -0.20 at weight 0.20 · swarm bearish Editorial prior, not backtested. |