Skip to content

Compare moats

Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.

comparing CXMT×MongoDB×Digital Realty Trust× maximum of 3 — remove one to swap
CXMT 688825.SS ai moat: latest change 2026-08-29 MongoDB MDB ai moat: latest change 2026-03-11 Digital Realty Trust DLR ai moat: latest change 2026-02-13
Moat rating none

CXMT's 2026 interim report (published 2026-08-29) names scale and IDM technology as core competencies, but also concedes gaps. It says that compared with the leading international manufacturers the Company 'still has a certain gap in overall scale, technology accumulation and customer resources' (与国际头部厂商相比,公司在整体规模、技术积累、客户资源等方面仍然存在一定差距). It describes its scale effect as 'gradually emerging' (逐步显现), and its gross-margin risk covers the case where the scale effect cannot materialise over the long term (公司规模效应长期无法显现). Its excess returns span a single shortage. The retained-earnings note shows an accumulated deficit of ¥36.65bn entering 2026, after ¥1.87bn of 2025 net profit attributable to the parent, and the first-half 2025 net loss attributable to shareholders was ¥2.33bn. Then first-half 2026 revenue rose 873.64%, which the report attributes to the global DRAM supply shortage, higher prices and sharply higher volumes, and the main-business gross margin reached 84.84%.

source: static.cninfo.com.cn

narrow

The FY2026 10-K frames a 'rapidly evolving and highly competitive' database market where the principal rivals — 'legacy database providers and large cloud providers' — hold explicit advantages: 'longer operating histories, more established relationships … significantly greater financial, technical, marketing or other resources … broader global distribution,' and can offer competing products 'at a low cost or no cost.' A developer-mindshare and switching-cost position is defensible but not wide against that field.

source: sec.gov

narrow

The FY2025 10-K's own competitive record cuts both ways. Item 1 says a "high-quality, highly interconnected global portfolio such as ours could not be easily replicated today on a cost-competitive basis," yet Item 1A concedes that competitors have "significantly greater financial, marketing and other resources and more ready access to capital" and that as rivals keep developing space, "rental rates may be reduced or we may face delays in leasing." A durable advantage that its own filing says new supply can price against is bounded, not unassailable.

source: sec.gov

Moat type none

On the report's own evidence, no candidate moat source qualifies. Cost scale: the report calls DRAM a highly standardised product (高度标准化的产品) in which the cost advantage of scale is a core competency. But CXMT ranks fourth globally by capacity, and the report, calculating on sales, puts Samsung, SK hynix and Micron at 33.96%, 34.48% and 23.41% of the 2025 global DRAM market, so the scale advantage lies with the leaders. IP: it reports 4,484 domestic patents (3,744 of them invention patents) and 3,400 overseas patents as of 2026-06-30. Yet it describes its core technology as reaching 'international advanced level' (国际先进水平) and flags possible IP disputes with competitors. Switching costs: ¥133.48bn of ¥150.31bn first-half 2026 revenue went through distributors, who under the report's revenue note decide their own resale prices.

source: static.cninfo.com.cn

switching costs

A database is the system an application is built on: the 10-K states 'a database directly impacts an application's performance, scalability, flexibility and reliability,' and Atlas is 'our managed multi-cloud database-as-a-service' running the customer's live workloads — re-platforming a database is a rewrite, not a swap.

source: sec.gov

network effects

Item 1 attributes the hard-to-replicate part of the portfolio to connectivity rather than to real estate: "the network density, interconnection infrastructure and connectivity-centric customers in certain of our data centers have led to the organic formation of densely connected data communities that are difficult for competitors to replicate." That community sits on over 232,000 cross connects in over 55 metros, so each network and cloud that lands makes the same building worth more to the next tenant.

source: sec.gov

Leadership fast follower

TrendForce (2026-09-24) reports that CXMT's global DRAM revenue share rose to 9.5% in 2Q26 from 7.6% in 1Q26, 'placing it fourth behind Samsung at 39.4%, SK hynix at 24.9%, and Micron at 23.3%'. It is catching up through generation-skipping R&D. The interim report had its fifth process platform in customer certification, and a voluntary disclosure on 2026-09-21 announced that platform's mass production, adding that its products are not yet in scale sales and yields need time to ramp. TrendForce's listing analysis (2026-07-28) still says CXMT 'still trails Samsung, SK hynix, and Micron in advanced processes, product performance, yields, and certification by high-end customers'.

source: static.cninfo.com.cn

co leader

The 10-K positions MongoDB as the leading document database by developer mindshare but names 'legacy database providers and large cloud providers' as better-resourced rivals across the broader database market — a category leader within a market it does not lead overall.

source: sec.gov

co leader

Item 1 claims the title of "the largest global provider of cloud- and carrier-neutral data center, colocation and interconnection solutions," but the Competition section names Equinix and NTT as operators of properties "similar to ours in some of the same metropolitan areas," plus Global Switch and regional operators abroad — a shared top tier on the company's own telling, not a solitary one.

source: sec.gov

Pricing power weak

CXMT is a price taker riding the cycle. The interim report attributes first-half revenue growth to the global DRAM supply shortage, rising prices and sharply higher volumes. It records industry prices between 2015 and 2025 as high as $7.89/GB and as low as $1.78/GB in first-half 2023, and it states that the continued steep price rise is not sustainable. Main-business revenue was ¥15.22bn against cost of ¥13.29bn in first-half 2025, and ¥150.04bn against ¥22.75bn in first-half 2026. Most sales go through distributors, who set their own resale prices.

source: static.cninfo.com.cn

moderate

Owning the IP and the roadmap ('the determination of which features are included in our free or paid offerings') gives real list-price control, but the same filing flags competitors offering database products 'at a low cost or no cost basis,' which caps it.

source: sec.gov

strong

FY2025 renewals signed re-priced upward in every bucket — +27.0% on greater-than-1 MW space ($146 to $186 per square foot), +4.6% on 0-1 MW ($268 to $280) and +43.0% on other ($49 to $71) — and MD&A expects average aggregate rental rates on 2026 renewals to be positive against the rates currently paid for the same space "on a GAAP basis and on a cash basis." On costs, the filing says utilities expense "is our largest expense category" and that "the vast majority of the expense is passed directly through to our customers," which it credits with significantly mitigating exposure to power-cost increases rather than removing it. The cap: Item 1A warns competitor development could still force rates down.

source: sec.gov

Summary

CXMT (ChangXin) is a Hefei-based IDM that designs and fabricates DDR5 and LPDDR4X/LPDDR5/5X/LPDDR6 memory and sells DRAM wafers, chips and modules. Its 2026 interim report says it reached its fourth process platform through a 'generation-skipping' (跳代研发) R&D strategy, and that it ranks first in China and fourth globally by shipments and sales. First-half 2026 revenue was ¥150.31bn (DDR series ¥69.47bn, LPDDR series ¥78.19bn), with a main-business gross margin of 84.84%. TrendForce puts its 2Q26 DRAM revenue share at 9.5%, up from 7.6% in 1Q26. The position is real but recent. The report concedes gaps to the three leaders in scale, technology and customers. The customers it names are Alibaba Cloud, ByteDance, Tencent, Lenovo, Xiaomi, Transsion, Honor, OPPO and vivo. On 2026-06-08 the US Defense Department added its subsidiary ChangXin Memory to the Section 1260H list. TrendForce notes that export controls leave CXMT relying on DUV multiple patterning rather than EUV, and that its prospectus 'has not disclosed a clear mass-production timetable' for HBM. The report itself warns that the continued steep rise in DRAM prices is not sustainable (价格的持续大幅上涨不具备可持续性) as international makers add capacity.

MongoDB monetizes developer mindshare that began as open source: the 10-K notes 'we own the intellectual property of our offerings since we are the creators of the software,' which lets it run a 'proprietary software subscription business model' and control the roadmap. The durable asset is the document-model install base and Atlas's managed multi-cloud workloads, positioned for AI as 'the underlying database … capable of processing queries against rich and complex data structures.' The counterweight, in the filing's own words, is that the large cloud providers it depends on for Atlas hosting are also its best-resourced competitors.

Digital Realty rents space, power and connectivity rather than compute: at 2025 year-end its portfolio held 310 data centers and roughly 57.6 million rentable square feet across more than 55 metros in over 30 countries, about 84.7% leased, serving more than 5,000 customers. Two different businesses sit inside that footprint. The greater-than-1 MW wholesale side is a capital-and-power race — 769 MW of projects underway with 64% pre-leased, and land that "could accommodate over 3,500 megawatts of additional data center capacity" — where the 10-K names Equinix, NTT, Global Switch and "various private operators" as rivals and warns that added supply can push rents down. The colocation and interconnection side is the defended half: over 232,000 cross connects and the "densely connected data communities" Item 1 says competitors cannot easily replicate, reinforced by contracts the filing describes as generally running 5-10+ years on large deployments and by improvements "installed at our customers' expense." FY2025 leasing supports that read — renewals signed re-priced +27.0% on greater-than-1 MW space and +4.6% on 0-1 MW — while customer concentration is the offsetting exposure, with the largest customer at roughly 11.7% of annualized recurring revenue.

Chain position

Upstream DRAM IDM selling wafers, chips and modules to server, smartphone, PC and automotive makers, mostly through distributors (¥133.48bn of ¥150.31bn first-half 2026 revenue).

Layer-10 application-layer data platform — the operational database under AI and general software workloads.

Landlord to the AI stack — sells the space, power and interconnection that cloud, network and enterprise tenants run compute in (Oracle, IBM, Meta Platforms, AT&T, Comcast and Lumen are among the customers named in Item 1), with roughly 2.9 GW of total in-place IT capacity.

Products (share / barrier)
Long-horizon vote -0.06 at weight 0.20 · swarm bullish

Editorial prior, not backtested.

see exactly how it voted →

+0.13 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

+0.17 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →