Compare moats
Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.
| Digital Realty Trust | Constellation Energy | Nebius Group | |
|---|---|---|---|
| Moat rating | narrow The FY2025 10-K's own competitive record cuts both ways. Item 1 says a "high-quality, highly interconnected global portfolio such as ours could not be easily replicated today on a cost-competitive basis," yet Item 1A concedes that competitors have "significantly greater financial, marketing and other resources and more ready access to capital" and that as rivals keep developing space, "rental rates may be reduced or we may face delays in leasing." A durable advantage that its own filing says new supply can price against is bounded, not unassailable. | wide The FY2025 10-K describes the nation's largest nuclear fleet — approximately 22 GW across 14 stations producing 68% of 2025 electric supply — running at a 94.7% capacity factor that 'has been approximately four percentage points better than the industry average annually since 2013', with NRC licences extending to 2054 and an IRA nuclear production tax credit floor from 2024. | narrow The FY2025 20-F positions Nebius as 'one of the few global, at scale, multi-tenant clouds purpose built for AI,' but the same filing names its central dependency plainly: 'We currently rely on Nvidia for the GPU chips we use' — a purpose-built neocloud renting a supply the hyperscalers it competes with also control, which is a real but narrow position. |
| Moat type | network effects Item 1 attributes the hard-to-replicate part of the portfolio to connectivity rather than to real estate: "the network density, interconnection infrastructure and connectivity-centric customers in certain of our data centers have led to the organic formation of densely connected data communities that are difficult for competitors to replicate." That community sits on over 232,000 cross connects in over 55 metros, so each network and cloud that lands makes the same building worth more to the next tenant. | cost scale The cited edge is operating cost at scale: average refuelling outages of 22 days in 2025 against industry averages of 33 and 38 days in 2024 and 2023, a capacity factor about four points above the industry every year since 2013, and 'significant economies of scale' in what the filing calls the largest US customer-facing energy platform. | cost scale The moat the filing describes is engineering: designs that 'optimize power and cooling efficiency, lower latency' plus 'a consistent track record of being one of the first-to-deploy the latest generation of NVIDIA GPU chips' — density and time-to-deploy at scale, not a switching lock. |
| Leadership | co leader Item 1 claims the title of "the largest global provider of cloud- and carrier-neutral data center, colocation and interconnection solutions," but the Competition section names Equinix and NTT as operators of properties "similar to ours in some of the same metropolitan areas," plus Global Switch and regional operators abroad — a shared top tier on the company's own telling, not a solitary one. | clear leader The 10-K states Constellation is 'the largest nuclear energy company in the U.S.', is 'the nation's largest energy supplier for C&I and residential power volumes' based on EEI data, and has 'over 32% of the C&I market share of direct customer business'. | fast follower The 20-F's own claim is 'one of the FEW global, at scale' AI clouds — a differentiated challenger to the hyperscalers it names as the competitive field, not a claimed leader of it; the first-to-deploy record is a follower's speed advantage, not category leadership. |
| Pricing power | strong FY2025 renewals signed re-priced upward in every bucket — +27.0% on greater-than-1 MW space ($146 to $186 per square foot), +4.6% on 0-1 MW ($268 to $280) and +43.0% on other ($49 to $71) — and MD&A expects average aggregate rental rates on 2026 renewals to be positive against the rates currently paid for the same space "on a GAAP basis and on a cash basis." On costs, the filing says utilities expense "is our largest expense category" and that "the vast majority of the expense is passed directly through to our customers," which it credits with significantly mitigating exposure to power-cost increases rather than removing it. The cap: Item 1A warns competitor development could still force rates down. | moderate The 10-K states 'While providing customers with a competitive price is a key focus' in retail, on roughly two-year average C&I contract terms with 77% power and 84% gas renewal rates in 2025, and the nuclear fleet's downside is set by the IRA nuclear PTC 'as unit revenues decline below levels established in the IRA'; SEC-reported operating income was 13.6% of revenue in 2025. | weak The filing frames a 'highly competitive' market with 'frequent introduction of new or improved solutions' and a GPU cost base set by a single supplier (NVIDIA) — a renter of compute competing on efficiency has little list-price control. |
| Summary | Digital Realty rents space, power and connectivity rather than compute: at 2025 year-end its portfolio held 310 data centers and roughly 57.6 million rentable square feet across more than 55 metros in over 30 countries, about 84.7% leased, serving more than 5,000 customers. Two different businesses sit inside that footprint. The greater-than-1 MW wholesale side is a capital-and-power race — 769 MW of projects underway with 64% pre-leased, and land that "could accommodate over 3,500 megawatts of additional data center capacity" — where the 10-K names Equinix, NTT, Global Switch and "various private operators" as rivals and warns that added supply can push rents down. The colocation and interconnection side is the defended half: over 232,000 cross connects and the "densely connected data communities" Item 1 says competitors cannot easily replicate, reinforced by contracts the filing describes as generally running 5-10+ years on large deployments and by improvements "installed at our customers' expense." FY2025 leasing supports that read — renewals signed re-priced +27.0% on greater-than-1 MW space and +4.6% on 0-1 MW — while customer concentration is the offsetting exposure, with the largest customer at roughly 11.7% of annualized recurring revenue. | Constellation pairs the largest US nuclear fleet with the largest competitive retail book, which lets it sell around-the-clock carbon-free power under long-term contracts such as the 20-year Microsoft PPA restarting Three Mile Island Unit 1 as the 835 MW Crane Clean Energy Center. | Nebius sells a 'unified full-stack AI cloud that spans the complete AI journey – from compute capacity to software and services,' with hardware and software built in-house — the neocloud pitch of hyperscaler reliability at purpose-built efficiency, and a first-to-deploy record on new NVIDIA silicon. Two things bound the moat, both from the filing: it 'currently rel[ies] on Nvidia for the GPU chips,' the same constraint every neocloud shares, and it is a Nasdaq 'Controlled Company' whose founding shareholder holds concentrated voting power. The three non-core segments (Toloka, Avride, TripleTen) are separate businesses, not the cloud moat. |
| Chain position | Landlord to the AI stack — sells the space, power and interconnection that cloud, network and enterprise tenants run compute in (Oracle, IBM, Meta Platforms, AT&T, Comcast and Lumen are among the customers named in Item 1), with roughly 2.9 GW of total in-place IT capacity. | Generator and retailer in one — the fleet is the physical supply behind the long-term carbon-free contracts it sells to large corporate buyers. | Layer-8 neocloud — a purpose-built AI compute provider reselling NVIDIA silicon at scale. |
| Products (share / barrier) |
|
|
|
| Long-horizon vote | +0.17 at weight 0.20 · swarm neutral Editorial prior, not backtested. | +0.38 at weight 0.20 · swarm neutral Editorial prior, not backtested. | -0.01 at weight 0.20 · swarm neutral Editorial prior, not backtested. |