Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.

comparing Digital Realty Trust×Intel×GE Vernova× maximum of 3 — remove one to swap
Digital Realty Trust DLR ai moat: latest change 2026-02-13 Intel INTC ai moat: latest change 2026-01-23 GE Vernova GEV ai moat: latest change 2026-01-29
Moat rating narrow

The FY2025 10-K's own competitive record cuts both ways. Item 1 says a "high-quality, highly interconnected global portfolio such as ours could not be easily replicated today on a cost-competitive basis," yet Item 1A concedes that competitors have "significantly greater financial, marketing and other resources and more ready access to capital" and that as rivals keep developing space, "rental rates may be reduced or we may face delays in leasing." A durable advantage that its own filing says new supply can price against is bounded, not unassailable.

source: sec.gov

eroding

The FY2025 10-K (filed 2026-01-23) repeats the concession, now broadened: 'we have lost market share in recent years, including in both client and data center markets, in the market for x86-based semiconductor products, and more generally in the markets for semiconductor compute products, as competitors have introduced highly competitive data center and client platform products.' It adds that the data-center business 'has been further negatively impacted in the past few years by the significant shift of customer spend toward GPUs optimized for AI workloads' — a historically wide moat still actively eroding.

source: sec.gov

wide

FY2025 10-K (filed 2026-01-29): the installed base generates approximately 25% of the world's electricity; the Power segment carries ~$94.4B of remaining performance obligations with ~1,800 of ~7,000 installed gas turbines under long-term service agreements averaging ~10 years of remaining contract life; and the filing states demand is 'exceeding available capacity' for its products — a contracted, decade-scale service annuity on proprietary installed equipment.

source: sec.gov

Moat type network effects

Item 1 attributes the hard-to-replicate part of the portfolio to connectivity rather than to real estate: "the network density, interconnection infrastructure and connectivity-centric customers in certain of our data centers have led to the organic formation of densely connected data communities that are difficult for competitors to replicate." That community sits on over 232,000 cross connects in over 55 metros, so each network and cloud that lands makes the same building worth more to the next tenant.

source: sec.gov

intangibles ip

The durable assets remain the x86 architecture and process-technology IP: the FY2025 10-K claims 'We are a global leader in the design and manufacturing of CPUs and other semiconductor products' and stakes the recovery on process IP — 'Intel 18A introduces two industry firsts in high-volume semiconductor manufacturing: gate-all-around transistors (RibbonFET) and backside power delivery (PowerVia).'

source: sec.gov

switching costs

10-K: ~1,800 gas turbines under long-term service agreements with ~10-year average remaining life, plus services agreements on ~24,000 of ~59,000 installed onshore wind turbines — service revenue is contractually tied to GE Vernova's own installed fleet; the filing adds it derives 'a sustained competitive advantage both from our IP portfolio as well as technical know-how embedded in our products and manufacturing techniques developed over decades'.

source: sec.gov

Leadership co leader

Item 1 claims the title of "the largest global provider of cloud- and carrier-neutral data center, colocation and interconnection solutions," but the Competition section names Equinix and NTT as operators of properties "similar to ours in some of the same metropolitan areas," plus Global Switch and regional operators abroad — a shared top tier on the company's own telling, not a solitary one.

source: sec.gov

fast follower

The FY2025 10-K still opens 'We are a global leader in the design and manufacturing of CPUs', yet concedes lost share 'in both client and data center markets' and a spend shift 'toward GPUs optimized for AI workloads' where Intel participates via 'Xeon, AI PCs, Arc GPUs and our open software stack' plus 'inference-optimized GPUs on a targeted annual cadence' — following the AI compute market rather than setting its pace.

source: sec.gov

co leader

10-K opens with 'GE Vernova is a global leader in the electric power industry' and its installed base generates ~25% of world electricity, but the filing names peer-scale competitors in every segment — Siemens Energy in both Power and Electrification, Mitsubishi Power, Vestas, Hitachi Energy, Schneider Electric, ABB — so co-leader across the portfolio rather than clear leader.

source: sec.gov

Pricing power strong

FY2025 renewals signed re-priced upward in every bucket — +27.0% on greater-than-1 MW space ($146 to $186 per square foot), +4.6% on 0-1 MW ($268 to $280) and +43.0% on other ($49 to $71) — and MD&A expects average aggregate rental rates on 2026 renewals to be positive against the rates currently paid for the same space "on a GAAP basis and on a cash basis." On costs, the filing says utilities expense "is our largest expense category" and that "the vast majority of the expense is passed directly through to our customers," which it credits with significantly mitigating exposure to power-cost increases rather than removing it. The cap: Item 1A warns competitor development could still force rates down.

source: sec.gov

weak

The FY2025 10-K states the mechanism itself: higher-priced products 'have lower margins as they are produced at external foundries rather than in our manufacturing facilities. To the extent demand shifts from our higher-margin to lower-margin products in any of our market segments, our gross margin percentage has decreased and may decrease again' — plus $878 million of 2025 inventory reserves on the early Intel 18A ramp.

source: sec.gov

strong

10-K: 'increasing demand exceeding available capacity', Electrification customer lead-times 'increased as a result of demand outstripping supply', and both Power and Electrification state they adjust pricing 'in line with market demand, inflation, and industry dynamics'; trade press (Power Engineering, 2026-04-23) reported new gas-turbine order pricing in H1 2026 tracking 10-20 points higher on a dollar-per-kilowatt basis than Q4 2025 orders.

source: sec.gov

Summary

Digital Realty rents space, power and connectivity rather than compute: at 2025 year-end its portfolio held 310 data centers and roughly 57.6 million rentable square feet across more than 55 metros in over 30 countries, about 84.7% leased, serving more than 5,000 customers. Two different businesses sit inside that footprint. The greater-than-1 MW wholesale side is a capital-and-power race — 769 MW of projects underway with 64% pre-leased, and land that "could accommodate over 3,500 megawatts of additional data center capacity" — where the 10-K names Equinix, NTT, Global Switch and "various private operators" as rivals and warns that added supply can push rents down. The colocation and interconnection side is the defended half: over 232,000 cross connects and the "densely connected data communities" Item 1 says competitors cannot easily replicate, reinforced by contracts the filing describes as generally running 5-10+ years on large deployments and by improvements "installed at our customers' expense." FY2025 leasing supports that read — renewals signed re-priced +27.0% on greater-than-1 MW space and +4.6% on 0-1 MW — while customer concentration is the offsetting exposure, with the largest customer at roughly 11.7% of annualized recurring revenue.

Still the incumbent x86 CPU designer-manufacturer — FY2025 revenue was $52.9 billion, roughly flat — but the filing concedes lost share in client and data center and an AI-driven customer shift toward GPUs; the counter-thesis is process IP, with Intel 18A shipping in Core Ultra Series 3 ('the first products to be manufactured using our new Intel 18A process technology') and Intel 14A 'designed from inception as an offering to external customers.'

GE Vernova's moat rests on its installed base: the FY2025 10-K states its equipment generates approximately 25% of the world's electricity, with ~7,000 installed gas turbines (~1,800 under long-term service agreements averaging ~10 years of remaining life) and ~$94.4B of Power-segment remaining performance obligations. The filing reports demand 'exceeding available capacity', lengthening Electrification lead-times 'as a result of demand outstripping supply', and pricing adjusted with demand — scarcity trade press later quantified as new gas-turbine order pricing tracking 10-20 points higher per kW in H1 2026 than Q4 2025, with only ~10 GW of production slots left across 2029-2030 (Power Engineering, 2026-04-23). The moat is not uniform: the 10-K risk section flags intensifying competition as manufacturers from China 'improve quality and reliability and pursue markets outside their home countries', and Offshore Wind is delivering its backlog under project-cost and execution pressure, compounded by the U.S. Interior Department's December 22, 2025 pause of leases for all large-scale U.S. offshore projects under construction, which directly impacted the Vineyard Wind timeline. Nuclear adds optionality: the 10-K cites an SMR deployment agreement it calls 'the first commercial contract of its kind in North America' via its joint ventures with Hitachi.

Chain position

Landlord to the AI stack — sells the space, power and interconnection that cloud, network and enterprise tenants run compute in (Oracle, IBM, Meta Platforms, AT&T, Comcast and Lumen are among the customers named in Item 1), with roughly 2.9 GW of total in-place IT capacity.

x86 compute incumbent and would-be US leading-edge foundry; its 18A/14A ramp is the main Western alternative to TSMC at the leading edge.

Power supplier to the AI buildout: the 10-K states gas power serves 'rising electricity demand from hyperscalers and data centers' and Electrification benefits from orders to electrify data centers 'playing a key role in the development of artificial intelligence (AI)'; trade press (Power Engineering, 2026-04-23) put roughly 20% of the ~100 GW of gas capacity under contract as explicitly tied to data-center load.

Products (share / barrier)
  • AI accelerators (Gaudi and inference-optimized GPUs) Niche · Moderate source: sec.gov
  • Intel Core / Core Ultra (client PC CPUs) Leader · Moderate source: sec.gov
  • Intel Foundry (leading-edge contract manufacturing) Niche · Deep source: sec.gov
  • Intel Xeon (data center CPUs) Leader · Moderate source: sec.gov
Long-horizon vote +0.17 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

-0.24 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

+0.35 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →