Compare moats
Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.
| GitLab | Applied Digital | IREN | |
|---|---|---|---|
| Moat rating | narrow The FY2026 10-K (year ended 2026-01-31) shows real expansion inside the installed base: 118% Dollar-Based Net Retention, Base Customers up to 10,682 from 9,893, customers above $100,000 of ARR up to 1,456 from 1,229, and $1.0 million ARR customers "to 155 from 123, an increase of 26%". But the filing concedes "limited barriers to entry" and names "Microsoft Corporation, which owns GitHub" as principal competitor. Retention decelerates (130% FY2024, 123% FY2025, 118% FY2026), and since DBNR is reported "on a threshold basis of 130%," the FY2024 figure is a cap and the slide is steeper than it looks. Narrow, not wide: expansion must be re-won against a bundled hyperscaler. | none The FY2026 10-K (filed 2026-07-29) shows contracted revenue, not a demonstrated competitive edge. About 1,410 MW is leased under 15-year take-or-pay, non-cancellable base terms worth about $36.2 billion, but only about 100 MW of the roughly 1.5 GW that is contracted and either operating or under construction was operating and earning revenue at May 31, 2026, and Item 1A says "lessees may have the right to terminate applicable leases if there are significant delays in construction." Item 1A also concedes "We do not have the resources to compete with larger providers of similar products or services at this time," and the Competition section names 13 power-advantaged developers the company competes with. Signed leases give revenue visibility, but the filing does not show a durable advantage. | none The FY2026 10-K (filed 2026-08-27) shows IREN holds an input the industry competes on: it names 'access to secured and energized power' first among what it believes are the principal competitive factors in its industry, and reports 'executed grid connection agreements, letters of agreement or equivalents representing approximately 5GW of total power capacity' in the United States, Canada, Spain and Australia as of June 30, 2026. It does not claim an advantage over rivals in that input. It says 'Certain competitors may have access to more competitively priced power, a greater access to power and a better capacity to timely secure grid connections,' and 'Many of our competitors have greater financial, technical or commercial resources, longer cloud operating histories or larger customer bases, compared to us.' Operating AI Cloud Services capacity was approximately 40MW at June 30, 2026, and the stored XBRL fundamentals from this 10-K show an FY2026 operating loss of about $1,046.7M on revenue of about $707.0M, so no durable advantage is yet demonstrated. |
| Moat type | switching costs Stickiness comes from platform embedding, not IP. The 10-K rests differentiation on "our single platform with a unified data model," on "Consolidation of multiple tools into a single platform," and on deployment inside the customer's own perimeter for regulated buyers. Replacement means re-integrating a toolchain and re-certifying compliance. IP is the wrong label: only "16 issued patents and 25 pending patent applications," plus open-source licenses granting "broad permissions to use, copy, modify, and redistribute." The no-lock-in claim is the filing's own characterisation, footnoted to a Forrester study "commissioned by GitLab." | none The 10-K claims three advantages: power-advantaged sites (it believes securing power and interconnection ahead of demand is 'the principal constraint on new HPC capacity and a core differentiator for us from many of our competitors'), a standardized 'franchise-style' design, and hyperscaler master service and master telecom service agreements 'that are difficult to obtain.' The filing does not show any of them to be durable. Its Competition section says competition 'centers on securing and developing sites with access to large-scale, reliable, and cost-competitive power and interconnection' and names 13 power-advantaged developers going after the same leases, and Item 1A concedes it lacks the resources to compete with larger providers. Signed leases are take-or-pay and non-cancellable, so a tenant leaving for convenience owes 'the full remaining contractual value,' but that is contractual lock-in on each lease rather than a moat source, so no moat type is assigned. | none The FY2026 10-K's asserted advantage is control from owning its data centers, 'including the associated land, grid connections and substations', which it believes allows it 'to benefit from more sustainable cash flows and operational flexibility relative to operators that rely upon third-party colocation services or short-term land leases'. Its only scale language is a belief that its 'procurement scale, deployment experience and direct control over the data center layer' lets it bring new compute into service 'rapidly and at scale', a deployment-speed claim, and it 'generally target[s]' regions with 'low-cost and attractive renewable energy sources', a siting target rather than a demonstrated cost position. It does not claim a cost or scale lead: it says 'Many of our competitors are larger, have longer operating histories and significantly greater resources than we do' and that certain competitors 'may have access to more competitively priced power, a greater access to power and a better capacity to timely secure grid connections.' There is no network effect or lock-in either, since existing contracts have 'terms ranging from month to month up to five years'. No enumerated moat source is grounded. |
| Leadership | fast follower The 10-K positions GitLab against a leader rather than as one: "Our principal competitor is Microsoft Corporation, which owns GitHub." Competition reads from the challenger side, differentiating "from GitHub through flexible deployment options that work within enterprise security and compliance requirements, LLM neutrality with self-hosted gateway support" and an open core model. On AI it follows: Duo Agent Platform went "Generally available in January 2026," the last month of the fiscal year. What keeps it a follower rather than behind is cadence, "a new version of our software every month for 172 months in a row," plus a regulated-deployment franchise a SaaS-first rival does not cover. | behind The 10-K makes no leadership claim and gives no ranking or share figure. Item 1A concedes "We do not have the resources to compete with larger providers of similar products or services at this time" and that some rivals have "substantially greater liquidity and financial resources than we do." Its Competition section places APLD against established operators (Digital Realty, Equinix), hyperscalers that build their own capacity, independent developers and 13 named power-advantaged developers (IREN, Cipher Digital, TeraWulf, Hut 8, Riot, CleanSpark, HIVE, Core Scientific, Bitdeer, Galaxy Digital, Fermi, Keel Infrastructure, MARA). | behind The 10-K lists IREN's competitors as hyperscalers (Amazon Web Services, Google Cloud, Microsoft Azure, Oracle Cloud) and specialized AI Cloud Services providers (CoreWeave, Nebius, Crusoe, Lambda, Nscale, SpaceX and others). It says IREN began providing AI Cloud Services in 2024 and cites its 'shorter operating history in AI Cloud Services relative to some competitors', and states 'Some of our competitors have longer operating histories, larger customer bases, more comprehensive IP portfolios and patent protections, more design wins, and greater financial, sales, marketing and distribution resources than we do.' Operating AI Cloud Services capacity was approximately 40MW at June 30, 2026. The filing describes a smaller, later entrant that trails some competitors on operating history, customer base and resources, with its progress so far resting on two anchor contracts (a ~$9.7B five-year Microsoft agreement and a ~$3.4B five-year NVIDIA contract) rather than any claimed category position. |
| Pricing power | moderate FY2026 gross margin was 87% against 89%, with cost of revenue up $35.6 million "primarily due to an increase of $18.4 million in third party hosting costs for SaaS and cloud usage," and management expects SaaS and Duo mix to bring costs that "may adversely impact our gross margins." Strain is explicit: GitLab "may be required to reduce our prices," competitors "may offer their products and services at a lower price or for free," and it "implemented user limits on our free SaaS product." Power retained: Premium lists at $29 per user/month billed annually, and seats bundle $12 and $24 of GitLab Credits. But "A majority of our subscriptions are on a one-year period." | weak Item 1A says "Due to the limited number of hyperscalers, we expect that a limited number of customers will continue to account for a high percentage of our revenue for the foreseeable future," and that if customers' equipment usage declines or they discontinue use of its facilities, APLD "may be compelled to lower our lease prices in some instances or risk losing a significant customer." One customer was 59% of FY2026 revenue from continuing operations. Take-or-pay, non-cancellable terms protect contracted revenue over the base term, and Note 19 reports a $39.1M HPC Hosting segment profit on $385.3M of segment revenue in FY2026, but those terms are agreed with a small group of concentrated buyers. | weak The 10-K's risk factors state 'Our competitors' products, services and technologies may be cheaper or provide better functionality or features than ours, which has resulted and may in the future result in lower-than-expected selling prices or demand for our products.' They also say long-term contract pricing 'is generally fixed or agreed at the time of contracting', so if market pricing for comparable capacity rises during a contract's term 'we will not benefit from those increases with respect to capacity already committed under our existing long-term contracts', and that if customers suffer a downturn or discontinue its services it 'may be compelled to offer more flexible terms, lower our prices or risk losing a significant customer.' The stored XBRL fundamentals from this 10-K show FY2026 revenue of about $707.0M against an operating loss of about $1,046.7M, so there is no margin record yet that evidences pricing power. |
| Summary | GitLab sells a single-platform DevSecOps toolchain defended by workflow lock-in rather than intellectual property: a unified data model plus deployment flexibility, including single-tenant "Dedicated for Government with FedRAMP compliance," makes it hard to remove where data residency is contractual. The installed base expands: 118% Dollar-Based Net Retention, 10,682 Base Customers, 1,456 above $100,000 of ARR, 155 above $1.0 million (up 26%), over 70% of ARR from public sector and enterprise. The filing supplies the counterweight: "limited barriers to entry," Microsoft/GitHub as principal competitor, 16 issued patents. Retention (130 to 123 to 118, the 130 a cap), gross margin (89% to 87%) and a January 2026 AI launch point to compression at the commodity end. No source measures market share, so every share band is "unknown". | Applied Digital designs, builds and operates purpose-built, liquid-cooled HPC data centers, which it calls 'AI factories', and leases the capacity to CoreWeave and investment-grade hyperscalers. At May 31, 2026 its 10-K lists five campuses (Polaris Forge 1-3 and Delta Forge 1-2) with about 1,410 MW contracted under roughly 15-year take-or-pay, non-cancellable leases worth about $36.2 billion over the base terms. The filing claims three sources of advantage: it controls power-advantaged sites, it uses a standardized 'franchise-style' design built to deliver about 150 MW in about 14 to 18 months, and it holds hyperscaler master agreements that are 'difficult to obtain.' The same document shows how early the company is. About 100 MW was operating and earning revenue. One customer was 59% of FY2026 revenue from continuing operations. It competes with Digital Realty, Equinix, hyperscalers that build their own capacity and 13 named power-advantaged developers, and it concedes that it lacks the resources to compete with larger providers. Signed leases give long-dated revenue visibility, but the filing does not show a durable competitive advantage. | Per its FY2026 10-K, IREN is a vertically integrated AI Cloud Services platform that owns the data center, compute and software layers, underpinned by executed grid connection agreements, letters of agreement or equivalents representing ~5GW and a further multi-GW development pipeline. Its commercial record is concentrated: a five-year Microsoft agreement (~$9.7B total contract value, Horizon 1 delivered and accepted in August 2026, Horizons 2-4 targeted for delivery in phases in calendar Q4 2026) and a five-year ~$3.4B NVIDIA cloud contract together make up a substantial majority of contracted revenue. It holds NVIDIA Preferred Partner and Exemplar Cloud status (HGX B300 and GB300 NVL72) and a strategic partnership intended to support the deployment over time of up to 5GW of NVIDIA DSX-aligned infrastructure, which the filing cites among arrangements that are non-binding or subject to conditions, with no assurance as to the extent of deployments. Against that, the filing names hyperscaler and specialized competitors (AWS, Google Cloud, Azure, Oracle, CoreWeave, Nebius, Crusoe, Lambda, Nscale, SpaceX), many of which it says have greater resources, customers that can use or develop their own solutions, and possible delays to Texas energization from changes to ERCOT's Batch Zero procedures, so the power position is not a demonstrated advantage over rivals and its value depends on execution. |
| Chain position | GitLab sits at the software-tooling layer, not compute or models. It consumes third-party LLM capacity — marketing "LLM neutrality and support for self-hosted AI gateways, including air-gapped environments" — so it captures no model-layer economics and bears inference as COGS, visible in the $18.4 million rise in hosting costs. Its distinctive position is the regulated perimeter. | Developer and landlord of power-advantaged, liquid-cooled AI data-center capacity, leased long-term to CoreWeave and investment-grade hyperscalers. | Downstream AI-cloud operator: owns grid-connected data centers and deploys NVIDIA/AMD GPU systems it rents to hyperscalers, frontier labs, AI developers and enterprises (anchor customers Microsoft and NVIDIA). |
| Products (share / barrier) |
|
|
|
| Long-horizon vote | +0.06 at weight 0.20 · swarm neutral Editorial prior, not backtested. | -0.20 at weight 0.20 · swarm neutral Editorial prior, not backtested. | -0.20 at weight 0.20 · swarm bearish Editorial prior, not backtested. |