Skip to content

Compare moats

Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.

comparing GitLab×Cipher Mining×GlobalFoundries× maximum of 3 — remove one to swap
GitLab GTLB ai moat: latest change 2026-08-05 Cipher Mining CIFR ai moat: latest change 2026-02-24 GlobalFoundries GFS ai moat: latest change 2026-02-27
Moat rating narrow

The FY2026 10-K (year ended 2026-01-31) shows real expansion inside the installed base: 118% Dollar-Based Net Retention, Base Customers up to 10,682 from 9,893, customers above $100,000 of ARR up to 1,456 from 1,229, and $1.0 million ARR customers "to 155 from 123, an increase of 26%". But the filing concedes "limited barriers to entry" and names "Microsoft Corporation, which owns GitHub" as principal competitor. Retention decelerates (130% FY2024, 123% FY2025, 118% FY2026), and since DBNR is reported "on a threshold basis of 130%," the FY2024 figure is a cap and the slide is steeper than it looks. Narrow, not wide: expansion must be re-won against a bundled hyperscaler.

source: sec.gov

none

Cipher (renamed Cipher Digital Inc. on 20 February 2026) holds signed, credit-supported leases but has not yet shown that they amount to a durable advantage. Its 2025 Form 10-K (filed 2026-02-24) says "Through the end of 2025, our revenue has been derived from mining bitcoin". Its Q2 2026 business update (2026-08-04, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/q226_earningsxprxdraftxvf.htm) reported "Q2 2026 Revenue of $25 million", and its first HPC rent began only in August 2026 at Black Pearl. The 10-K's own risk factors describe a contested market. They say "There has been an increasing number of businesses constructing HPC data centers, which has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive", that "our data centers are single-tenant properties", and that lessees "will have the right to terminate the lease if there are significant delays in the completion of construction". At Barber Lake, where the 10-K targeted Phase I delivery "by September 30, 2026", a September 2026 amendment, made "In connection with change orders and the continued evolution of tenant requirements", moved data-hall deliveries to the fourth quarter of 2026 through the first quarter of 2027. Under it, Cipher "will bear the first $359.3 million of costs in excess of the initial budgeted amount" (2026-09-25). There is real counter-evidence: a 15-year Amazon lease, a Google-backstopped Fluidstack lease whose contracted life a "leading AI lab" extended to 20 years, and a third lease with an investment-grade hyperscale tenant. Until that capacity is delivered and paying rent, though, a moat is not shown, so the band is none.

source: sec.gov

narrow

The FY2025 20-F gives a measured lock-in: approximately 63% of 2025 wafer shipment volume was single-sourced business - products GF says "can only be manufactured with our technology or cannot be manufactured elsewhere without significant customer redesigns" - and long-term agreements carried an aggregate remaining revenue commitment of approximately $11 billion at 31 December 2025, as "binding, multi-year, reciprocal minimum purchase and supply commitments". That advantage is bounded by admissions in the same filing: "some of our competitors may offer more advanced or differentiated technologies than we do and some have greater access to capital and substantially greater production capacity, research and development... including access to government subsidies"; China's mature-node "foundry capacity is expected to grow faster than expected demand at those nodes"; and GF "renegotiated a number of LTAs with certain of our customers, including in 2025, as a result of which some of our LTAs now have longer commitment periods... and some of our LTAs have lower pricing or volume commitments than originally negotiated". Gross margin of 24.9% in 2025 ($1,690m on $6,791m of net revenue) on essentially flat revenue is the economics of a position that is defended rather than uncontested.

source: sec.gov

Moat type switching costs

Stickiness comes from platform embedding, not IP. The 10-K rests differentiation on "our single platform with a unified data model," on "Consolidation of multiple tools into a single platform," and on deployment inside the customer's own perimeter for regulated buyers. Replacement means re-integrating a toolchain and re-certifying compliance. IP is the wrong label: only "16 issued patents and 25 pending patent applications," plus open-source licenses granting "broad permissions to use, copy, modify, and redistribute." The no-lock-in claim is the filing's own characterisation, footnoted to a Forrester study "commissioned by GitLab."

source: sec.gov

none

No moat source is demonstrated yet. Switching costs are the most likely candidate, since the leases are long (15 years at Black Pearl; Barber Lake now a 20-year contracted life) and each site has a single tenant. But the 10-K says tenant guarantees "will only be effective after rent commencement under such leases and are subject to certain limitations", and by August 2026 rent had begun at only one site. The advantages the 10-K claims are the company's own. It speaks of "industry-leading expertise in originating and securing industrial-scale, greenfield data center sites" and of securing West Texas land "on more favorable terms than in more established data center markets". The same document says "there is significant competition for power capacity and energized facilities". Intellectual property is modest: "four granted United States patents and one issued patent in Taiwan". With 66 full-time employees, Cipher has no scale advantage over the competitors it names: CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers.

source: sec.gov

switching costs

The filing rules out scale as the source: GF concedes competitors with "substantially greater production capacity, research and development" and its four fabs held roughly 2.8 million wafers per annum of installed capacity at end-2025 against a $6.8bn revenue base. The mechanism it names instead is the cost of moving a qualified design - "[g]iven the time and costs associated with moving a single-sourced product to a competitor, clients are more likely to continue awarding us single-source contracts for such products" - and it is quantified at approximately 63% of 2025 wafer shipment volume. It is contractually reinforced by the ~$11bn of remaining LTA revenue commitment, which GF says continues to matter "for certain longer term, more durable end markets, such as automotive", where 21% of 2025 net revenue ($1,410m) now sits.

source: sec.gov

Leadership fast follower

The 10-K positions GitLab against a leader rather than as one: "Our principal competitor is Microsoft Corporation, which owns GitHub." Competition reads from the challenger side, differentiating "from GitHub through flexible deployment options that work within enterprise security and compliance requirements, LLM neutrality with self-hosted gateway support" and an open core model. On AI it follows: Duo Agent Platform went "Generally available in January 2026," the last month of the fiscal year. What keeps it a follower rather than behind is cadence, "a new version of our software every month for 172 months in a row," plus a regulated-deployment franchise a SaaS-first rival does not cover.

source: sec.gov

fast follower

No independent share or rank was found. The 10-K names CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers as competitors, along with miners that have "signed leases with hyperscalers and HPC tenants": Hut 8, IREN, TeraWulf, Core Scientific and Applied Digital. Cipher has signed hyperscale-grade tenants (Amazon; Fluidstack with a Google backstop; a third investment-grade hyperscaler) but delivered its first HPC capacity only in August 2026 (Q2 2026 update). That makes it a fast follower. Its self-description as "a leading developer, owner, and operator of industrial-scale data centers" is the company's own claim and is not counted.

source: sec.gov

fast follower

The 20-F places GF inside a group of "five major foundries (including four scaled pure-play foundries) that accounted for the vast majority of worldwide foundry revenue in 2025", naming TSMC first among key competitors along with UMC and SMIC, and separately conceding competitors with "more advanced or differentiated technologies than we do" and "substantially greater production capacity, research and development, marketing and other resources". GF does not compete for the leading edge at all; its stated pillars are differentiated RF, FDX, silicon photonics, power and feature-rich CMOS plus geographic diversity. That is an established, scaled participant operating inside a pace set elsewhere, not one setting it, and not one shut out of the top tier.

source: sec.gov

Pricing power moderate

FY2026 gross margin was 87% against 89%, with cost of revenue up $35.6 million "primarily due to an increase of $18.4 million in third party hosting costs for SaaS and cloud usage," and management expects SaaS and Duo mix to bring costs that "may adversely impact our gross margins." Strain is explicit: GitLab "may be required to reduce our prices," competitors "may offer their products and services at a lower price or for free," and it "implemented user limits on our free SaaS product." Power retained: Premium lists at $29 per user/month billed annually, and seats bundle $12 and $24 of GitLab Credits. But "A majority of our subscriptions are on a one-year period."

source: sec.gov

weak

The 10-K says competition "has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive". It adds that if customers cut usage "we may be compelled to lower our prices or risk losing a significant customer". At Barber Lake, Cipher agreed to absorb "the first $359.3 million of costs in excess of the initial budgeted amount", with the tenant reimbursing "50% of any such costs above that amount" (2026-09-25, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000043/barberlakeleaseamendmentpr.htm). Its one input-cost edge is specific to mining: Odessa's power costs about 2.8 c/kWh under the Luminant contract, available "until at least July 2027". A landlord that concedes cost overruns to its tenants has weak pricing power.

source: sec.gov

moderate

Gross margin was 24.9% in 2025 ($1,690m on $6,791m) versus 24.5% in 2024 ($1,651m on $6,750m) - held, not expanded, even though average shipment utilization across the global fabs rose from 77% to 86%, so most of the volume gain was absorbed rather than dropping through. The filing states outright that "the market prices for technology and services tend to fall over time, except in times of extreme supply shortage", and discloses LTAs renegotiated in 2025 to "lower pricing or volume commitments than originally negotiated". Against that, GF says wafer price "varies significantly across technology platforms" and that devices with "richer feature sets, higher performance, better yields and greater system-level integration... generally command higher wafer prices". Price-setting inside designed-in single-sourced sockets, price-taking at the competitive margin.

source: sec.gov

Summary

GitLab sells a single-platform DevSecOps toolchain defended by workflow lock-in rather than intellectual property: a unified data model plus deployment flexibility, including single-tenant "Dedicated for Government with FedRAMP compliance," makes it hard to remove where data residency is contractual. The installed base expands: 118% Dollar-Based Net Retention, 10,682 Base Customers, 1,456 above $100,000 of ARR, 155 above $1.0 million (up 26%), over 70% of ARR from public sector and enterprise. The filing supplies the counterweight: "limited barriers to entry," Microsoft/GitHub as principal competitor, 16 issued patents. Retention (130 to 123 to 118, the 130 a cap), gross margin (89% to 87%) and a January 2026 AI launch point to compression at the commodity end. No source measures market share, so every share band is "unknown".

Cipher built bitcoin mining data centres in Texas and is now developing single-tenant AI and HPC campuses for lease to hyperscalers. Its 10-K reports a portfolio of "4.2 gigawatts ("GW") of capacity across 10 sites". It lists a 15-year Amazon Web Services lease for about 300 MW of turnkey capacity at Black Pearl and a Fluidstack lease at Barber Lake (300 MW gross) under which Google "has agreed to backstop certain obligations of Fluidstack". It describes bitcoin mining at Odessa on a Luminant power contract at about 2.8 c/kWh. In 2026 it signed a third campus lease "with an investment-grade Hyperscale tenant" (Q1 2026 update, 2026-05-05), delivered first Black Pearl capacity in August "two months ahead of the original schedule" with rent commenced, and fully funded its Stingray development with a bond (Q2 2026 update). On 2026-09-25 it said Barber Lake's contracted life was extended from 10 to 20 years, taking contracted revenue at the site "from $3.8 billion to over $9 billion". The 10-K says Odessa was "the first bitcoin mining data center awarded the Management and Operations, or M&O, Stamp of Approval award from the Uptime Institute", which is independent recognition of how the company operates. Against this, the latest quarter's revenue was still bitcoin mining and fell to $25 million. The 10-K describes growing "competition and pricing pressure", single-tenant concentration, and termination rights for construction delays. The Barber Lake schedule was reset, and Cipher absorbs the first $359.3 million of cost overruns. Cipher's contracted pipeline is substantial, but a competitive advantage is not yet demonstrated, so it is rated as having no moat. That could change to narrow once its leased campuses are delivered and paying rent.

GlobalFoundries is a pure-play specialty foundry that deliberately does not contest the leading edge. Its FY2025 20-F frames the business around six differentiated technology lines - feature-rich CMOS, ultra-low-power CMOS (FinFET and FDX), silicon photonics, RF, power, and, new in 2025, processor IP via the MIPS acquisition - manufactured at four fabs in Malta NY, Burlington VT, Dresden and Singapore, which GF describes as making it "the only scaled foundry with a global manufacturing footprint spanning the United States, Europe, and Asia operating for more than a decade". The defence that shows up in the numbers is design lock-in rather than cost: approximately 63% of 2025 wafer shipment volume was single-sourced, and ~$11bn of long-term agreement revenue commitment remained at year-end. What limits it is visible in the same document - competitors with more capital, more capacity and, in some cases, more advanced technology; mature-node capacity in China expected to outgrow demand at 28nm and larger; TSMC, Samsung, Intel, Texas Instruments and UMC all building in the United States, Europe or Singapore, which erodes the geographic-diversity argument GF calls "one of our key advantages". Pricing reflects that balance: 2025 gross margin of 24.9% against 24.5% in 2024 even as shipment utilization rose from 77% to 86%, with some LTAs renegotiated to lower pricing. AI exposure is real but indirect - Communications, Infrastructure & Data Center was 11% of 2025 net revenue, and GF's AI content is optical interconnect, RF, sensing, power and edge processor IP rather than accelerator logic.

Chain position

GitLab sits at the software-tooling layer, not compute or models. It consumes third-party LLM capacity — marketing "LLM neutrality and support for self-hosted AI gateways, including air-gapped environments" — so it captures no model-layer economics and bears inference as COGS, visible in the $18.4 million rise in hosting costs. Its distinctive position is the regulated perimeter.

Cipher develops single-tenant, powered data-centre campuses for hyperscale and AI tenants: Amazon at Black Pearl, Fluidstack (backstopped by Google) at Barber Lake, and an unnamed investment-grade hyperscaler at a third campus. Meanwhile it winds down bitcoin mining.

Pure-play specialty foundry. Inputs are silicon and specialised SOI wafers bought under multiple long-term agreements with principal suppliers, "the largest of which is Soitec", plus externally sourced EDA tools and third-party IP. Output is finished semiconductor wafers, approximately 89% of 2025 net revenue, sold to fabless designers and IDMs and delivered through the GlobalSolutions ecosystem of IP providers, EDA vendors, OSAT partners and design-service firms; the remaining ~11% is photomasks, sourcing and post-fab services, and IP licence and royalty income. Manufacturing sits at four sites - Malta NY, Burlington VT, Dresden and Singapore - with roughly 239,000 square metres of clean room and about 2.8 million wafers per annum installed capacity at end-2025. Position in the AI chain is one step removed from accelerators: Communications, Infrastructure & Data Center was 11% of 2025 net revenue ($745m), with content in optical interconnect, RF front-ends, timing and power, alongside edge-AI processor IP from the MIPS acquisition.

Products (share / barrier)
  • Enterprise Agile Planning add-on Unknown · Low source: sec.gov
  • GitLab Dedicated (including Dedicated for Government) Unknown · Deep source: sec.gov
  • GitLab DevSecOps Platform (Free, Premium, and Ultimate tiers) Unknown · Moderate source: sec.gov
  • GitLab Duo Agent Platform (with GitLab Credits) Unknown · Low source: about.gitlab.com
  • Self-Managed GitLab (on-premises and hybrid cloud deployment) Unknown · Deep source: sec.gov
  • Bitcoin mining (Odessa) Unknown · Low source: sec.gov
  • HPC data center leasing (Black Pearl, Barber Lake, Stingray) Challenger · Moderate source: sec.gov
Long-horizon vote +0.06 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

-0.06 at weight 0.20 · swarm bearish

Editorial prior, not backtested.

see exactly how it voted →

+0.06 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →