Compare moats
Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.
| IBM | JPMorgan Chase | GE Vernova | |
|---|---|---|---|
| Moat rating | narrow IBM's FY2025 10-K describes "a highly competitive environment" with "hundreds of competitors" and says IBM is "regularly exposed to new competitors" as it executes its hybrid-cloud/AI strategy, while differentiating through "incumbency with enterprises" and "client relationships and trust" — a real but narrow moat, not a wide one. | wide The 2025 Form 10-K opens with a balance sheet and a licensing perimeter that a new entrant cannot assemble: $4.4 trillion in assets and $362.4 billion in stockholders' equity at December 31, 2025, a principal bank subsidiary (JPMorgan Chase Bank, N.A.) with branches in 48 states and Washington, D.C., 318,512 employees across 66 countries, and consolidated supervision as a bank and financial holding company by the Federal Reserve, layered with the OCC, FDIC, SEC, FINRA, CFTC, U.K. PRA/FCA and the ECB over its principal subsidiaries. Item 1 also notes the Bank Holding Company Act restricts holding companies to banking and closely-related activities, so the charter itself is scarce. Rated wide rather than higher because Item 1's own Competition paragraph calls the environments 'highly competitive' and names e-commerce, digital-asset and financial-technology entrants that 'disintermediate traditional banking products'. | wide FY2025 10-K (filed 2026-01-29): the installed base generates approximately 25% of the world's electricity; the Power segment carries ~$94.4B of remaining performance obligations with ~1,800 of ~7,000 installed gas turbines under long-term service agreements averaging ~10 years of remaining contract life; and the filing states demand is 'exceeding available capacity' for its products — a contracted, decade-scale service annuity on proprietary installed equipment. |
| Moat type | switching costs The 10-K roots IBM's differentiation in "incumbency with enterprises" and "client relationships and trust" — installed-base lock-in across its hybrid-cloud platform (Red Hat) and enterprise software and infrastructure raises switching costs. | cost scale The filing's durable advantage is scale rather than a proprietary technology or a stated network effect: $4.4 trillion of assets and $362.4 billion of equity, 318,512 employees, a 48-state branch footprint and a GSIB capital and liquidity regime administered under the Basel III framework. Item 1A repeatedly frames technology as a required expenditure - 'New technologies have required and could require JPMorganChase to increase expenditures to modify its products' and possible 'significant investments in technology' for quantum-resistant encryption - which is a fixed cost the firm spreads over a base few competitors match. The filing asserts no network effect and no switching-cost lock-in. | switching costs 10-K: ~1,800 gas turbines under long-term service agreements with ~10-year average remaining life, plus services agreements on ~24,000 of ~59,000 installed onshore wind turbines — service revenue is contractually tied to GE Vernova's own installed fleet; the filing adds it derives 'a sustained competitive advantage both from our IP portfolio as well as technical know-how embedded in our products and manufacturing techniques developed over decades'. |
| Leadership | fast follower An enterprise incumbent that differentiates via "incumbency with enterprises" but is "regularly exposed to new competitors" in its hybrid-cloud/AI push (FY2025 10-K) — a follower in the current AI cycle rather than its leader. | co leader Item 1 claims the firm is 'a leader' in five distinct businesses at once, and 'a leading financial services firm based in the United States' - but it claims to be 'a leader', never the leader, and names no rank or peer comparison anywhere in Item 1 or Item 1A. Scale disclosed in the filing (assets, equity, 318,512 employees, 66 countries, CCB 144,196 / CIB 94,563 / AWM 29,722 headcount) puts it in the front rank; the document itself supports a co-leader reading and not a sole-leader one. | co leader 10-K opens with 'GE Vernova is a global leader in the electric power industry' and its installed base generates ~25% of world electricity, but the filing names peer-scale competitors in every segment — Siemens Energy in both Power and Electrification, Mitsubishi Power, Vestas, Hitachi Energy, Schneider Electric, ABB — so co-leader across the portfolio rather than clear leader. |
| Pricing power | moderate Gross margin is high and rising (54.9% FY2021 to 58.2% FY2025) on a software-mix shift, but "price" is a principal method of competition per the 10-K and consulting/infrastructure remain price-competitive. | moderate Item 1 states the businesses 'generally compete on the basis of the quality and variety of the Firm's products and services, transaction execution, innovation, reputation and price' - price is one of several axes, not absent. Item 1A is explicit that 'Actions by competitors could put pressure on the pricing for JPMorganChase's products and services or could cause it to lose market share, particularly with respect to investment products and traditional banking products,' and separately that higher rates can cause 'the loss of deposits, including where customers transition to higher-yielding products.' The filing states no margin trend supporting stronger pricing power. | strong 10-K: 'increasing demand exceeding available capacity', Electrification customer lead-times 'increased as a result of demand outstripping supply', and both Power and Electrification state they adjust pricing 'in line with market demand, inflation, and industry dynamics'; trade press (Power Engineering, 2026-04-23) reported new gas-turbine order pricing in H1 2026 tracking 10-20 points higher on a dollar-per-kilowatt basis than Q4 2025 orders. |
| Summary | IBM's moat rests on deep enterprise incumbency — sticky installed-base relationships across hybrid cloud (Red Hat), enterprise software, and mission-critical infrastructure, plus brand and a large patent base. But its own FY2025 10-K frames "a highly competitive environment" with "hundreds of competitors" and says IBM is "regularly exposed to new competitors" as it pursues hybrid cloud and AI, so the moat is durable but narrow and contested in the AI/cloud growth arena. | Item 1 describes JPMorganChase as 'a leader in investment banking, financial services for consumers and small businesses, commercial banking, financial transaction processing and asset management' operating off a $4.4 trillion balance sheet with $362.4 billion of equity as of December 31, 2025. The protection is the combination of that scale with a regulatory perimeter - Federal Reserve consolidated supervision, a national bank charter under the OCC, and separately licensed broker-dealer and credit-institution subsidiaries in the U.K. and Germany - that bounds who may offer the same product set. The filing is candid that the perimeter is leaking at the edges: it names non-depository and internet-only entrants offering lending, payments processing, cryptocurrency and stablecoins, tokenized securities and algorithmic investment advice, and warns of 'disruption to payments processing... from the use of new technologies that may not require intermediation'. | GE Vernova's moat rests on its installed base: the FY2025 10-K states its equipment generates approximately 25% of the world's electricity, with ~7,000 installed gas turbines (~1,800 under long-term service agreements averaging ~10 years of remaining life) and ~$94.4B of Power-segment remaining performance obligations. The filing reports demand 'exceeding available capacity', lengthening Electrification lead-times 'as a result of demand outstripping supply', and pricing adjusted with demand — scarcity trade press later quantified as new gas-turbine order pricing tracking 10-20 points higher per kW in H1 2026 than Q4 2025, with only ~10 GW of production slots left across 2029-2030 (Power Engineering, 2026-04-23). The moat is not uniform: the 10-K risk section flags intensifying competition as manufacturers from China 'improve quality and reliability and pursue markets outside their home countries', and Offshore Wind is delivering its backlog under project-cost and execution pressure, compounded by the U.S. Interior Department's December 22, 2025 pause of leases for all large-scale U.S. offshore projects under construction, which directly impacted the Vineyard Wind timeline. Nuclear adds optionality: the 10-K cites an SMR deployment agreement it calls 'the first commercial contract of its kind in North America' via its joint ventures with Hitachi. |
| Chain position | A hybrid-cloud platform, enterprise-AI (watsonx), and consulting provider to large enterprises — a software/cloud layer of the AI stack. | An AI adopter and a possible AI casualty, not an AI supplier: the filing books no AI revenue line and mentions no data-center or model exposure, and instead carries a dedicated risk factor on 'the development of advanced technologies such as AI' warning of 'competitive disadvantage if competitors are able to deploy AI more quickly or effectively' and of 'replacement or disintermediation of direct customer relationships if AI agents autonomously manage or intermediate financial decisions' - so its AI exposure as filed is defensive and operational rather than a supply-chain position. | Power supplier to the AI buildout: the 10-K states gas power serves 'rising electricity demand from hyperscalers and data centers' and Electrification benefits from orders to electrify data centers 'playing a key role in the development of artificial intelligence (AI)'; trade press (Power Engineering, 2026-04-23) put roughly 20% of the ~100 GW of gas capacity under contract as explicitly tied to data-center load. |
| Products (share / barrier) |
|
|
|
| Long-horizon vote | +0.06 at weight 0.20 · swarm bearish Editorial prior, not backtested. | +0.30 at weight 0.20 · swarm bullish Editorial prior, not backtested. | +0.35 at weight 0.20 · swarm bullish Editorial prior, not backtested. |