Compare moats
Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.
| IREN | Bloom Energy | ASML | |
|---|---|---|---|
| Moat rating | none The FY2026 10-K (filed 2026-08-27) shows IREN holds an input the industry competes on: it names 'access to secured and energized power' first among what it believes are the principal competitive factors in its industry, and reports 'executed grid connection agreements, letters of agreement or equivalents representing approximately 5GW of total power capacity' in the United States, Canada, Spain and Australia as of June 30, 2026. It does not claim an advantage over rivals in that input. It says 'Certain competitors may have access to more competitively priced power, a greater access to power and a better capacity to timely secure grid connections,' and 'Many of our competitors have greater financial, technical or commercial resources, longer cloud operating histories or larger customer bases, compared to us.' Operating AI Cloud Services capacity was approximately 40MW at June 30, 2026, and the stored XBRL fundamentals from this 10-K show an FY2026 operating loss of about $1,046.7M on revenue of about $707.0M, so no durable advantage is yet demonstrated. | narrow FY2025 10-K (Item 1, filed 2026-02-09): a proprietary solid-oxide platform protected by 380 active U.S. utility patents plus 183 pending, with speed-to-power the company says can deliver onsite power 'within approximately 90 days' — real but contested advantages: the same 10-K's Item 1A calls distributed generation and hydrogen 'still emerging markets' whose acceptance is uncertain, and revenue concentration was 43%/13%/12% across three customers in FY2025 (sec.gov/Archives/edgar/data/1664703/000162828026006516/be-20251231.htm). | wide ASML's FY2025 20-F states it "is currently the world's only manufacturer of EUV lithography systems" — an effective monopoly on the extreme-ultraviolet tools required to pattern leading-edge logic and memory chips. |
| Moat type | none The FY2026 10-K's asserted advantage is control from owning its data centers, 'including the associated land, grid connections and substations', which it believes allows it 'to benefit from more sustainable cash flows and operational flexibility relative to operators that rely upon third-party colocation services or short-term land leases'. Its only scale language is a belief that its 'procurement scale, deployment experience and direct control over the data center layer' lets it bring new compute into service 'rapidly and at scale', a deployment-speed claim, and it 'generally target[s]' regions with 'low-cost and attractive renewable energy sources', a siting target rather than a demonstrated cost position. It does not claim a cost or scale lead: it says 'Many of our competitors are larger, have longer operating histories and significantly greater resources than we do' and that certain competitors 'may have access to more competitively priced power, a greater access to power and a better capacity to timely secure grid connections.' There is no network effect or lock-in either, since existing contracts have 'terms ranging from month to month up to five years'. No enumerated moat source is grounded. | intangibles ip The FY2025 10-K states 'Intellectual property is an essential differentiator for our business' and details 380 active U.S. utility patents, 252 active international patents, trade secrets around cell printing, and a purpose-built copy-exact Newark manufacturing facility — the moat rests on proprietary solid-oxide technology and manufacturing know-how, not network effects or locked-in customers (Item 1, Intellectual Property / Manufacturing Facilities). | intangibles ip The durable advantage rests on decades of proprietary technology and IP — the 20-F describes ASML's April 2025 1,000-watt EUV light source as "built on 25 years of engineering advancements" — reinforced by an exclusive arrangement with Carl Zeiss SMT as its "sole supplier" of the critical optics no rival can source. |
| Leadership | behind The 10-K lists IREN's competitors as hyperscalers (Amazon Web Services, Google Cloud, Microsoft Azure, Oracle Cloud) and specialized AI Cloud Services providers (CoreWeave, Nebius, Crusoe, Lambda, Nscale, SpaceX and others). It says IREN began providing AI Cloud Services in 2024 and cites its 'shorter operating history in AI Cloud Services relative to some competitors', and states 'Some of our competitors have longer operating histories, larger customer bases, more comprehensive IP portfolios and patent protections, more design wins, and greater financial, sales, marketing and distribution resources than we do.' Operating AI Cloud Services capacity was approximately 40MW at June 30, 2026. The filing describes a smaller, later entrant that trails some competitors on operating history, customer base and resources, with its progress so far resting on two anchor contracts (a ~$9.7B five-year Microsoft agreement and a ~$3.4B five-year NVIDIA contract) rather than any claimed category position. | clear leader Scoped to fuel-cell-based onsite power for datacenters: Energy Changemakers (2026-07-04) positions Bloom as the market leader in fuel-cell deployment for AI datacenters — Brookfield framework expanded $5B→$25B, Oracle up to 2.8 GW, Equinix 100+ MW across 19 US datacenters, AEP gigawatt-scale — with FuelCell Energy the named challenger at smaller aggregate scale (~450/380/360 MW deals). In onsite power broadly (vs. turbines and engines) Bloom is one option among several (energychangemakers.com/fuel-cells-gain-ground-in-data-centers/). | clear leader Effectively 100% of the EUV market as the world's only EUV system maker; in the older DUV segment it "compete[s] primarily with Canon and Nikon" yet remains the leading supplier. |
| Pricing power | weak The 10-K's risk factors state 'Our competitors' products, services and technologies may be cheaper or provide better functionality or features than ours, which has resulted and may in the future result in lower-than-expected selling prices or demand for our products.' They also say long-term contract pricing 'is generally fixed or agreed at the time of contracting', so if market pricing for comparable capacity rises during a contract's term 'we will not benefit from those increases with respect to capacity already committed under our existing long-term contracts', and that if customers suffer a downturn or discontinue its services it 'may be compelled to offer more flexible terms, lower our prices or risk losing a significant customer.' The stored XBRL fundamentals from this 10-K show FY2026 revenue of about $707.0M against an operating loss of about $1,046.7M, so there is no margin record yet that evidences pricing power. | moderate Q2 2026 release: GAAP gross margin 33.4%, up 668 bps YoY, with 34.3% non-GAAP and raised FY26 guidance of ~34% non-GAAP gross margin — margin expansion during a supply-constrained turbine market suggests real but cyclical pricing leverage; the FY2025 10-K frames the core competition as grid electricity and combustion OEMs on cost, which caps pricing through the cycle (sec.gov/Archives/edgar/data/1664703/000162828026050150/ex991_q226financialresults.htm). | strong FY2025 gross margin of 52.8%, up 1.5 percentage points year over year, with management guiding toward 56-60% by 2030 — consistent with monopoly pricing power on EUV tools. |
| Summary | Per its FY2026 10-K, IREN is a vertically integrated AI Cloud Services platform that owns the data center, compute and software layers, underpinned by executed grid connection agreements, letters of agreement or equivalents representing ~5GW and a further multi-GW development pipeline. Its commercial record is concentrated: a five-year Microsoft agreement (~$9.7B total contract value, Horizon 1 delivered and accepted in August 2026, Horizons 2-4 targeted for delivery in phases in calendar Q4 2026) and a five-year ~$3.4B NVIDIA cloud contract together make up a substantial majority of contracted revenue. It holds NVIDIA Preferred Partner and Exemplar Cloud status (HGX B300 and GB300 NVL72) and a strategic partnership intended to support the deployment over time of up to 5GW of NVIDIA DSX-aligned infrastructure, which the filing cites among arrangements that are non-binding or subject to conditions, with no assurance as to the extent of deployments. Against that, the filing names hyperscaler and specialized competitors (AWS, Google Cloud, Azure, Oracle, CoreWeave, Nebius, Crusoe, Lambda, Nscale, SpaceX), many of which it says have greater resources, customers that can use or develop their own solutions, and possible delays to Texas energization from changes to ERCOT's Batch Zero procedures, so the power position is not a demonstrated advantage over rivals and its value depends on execution. | Bloom's edge is a single solid-oxide platform — 'cell printing, stack assemblies, and column configurations' — that serves both the Energy Server and the Bloom Electrolyzer, protected by 380 active U.S. patents and decades of materials know-how (FY2025 10-K, Item 1). Against its practical competition — grid power, gas reciprocating engines, small gas turbines, and other fuel-cell chemistries (PEM/MCFC/PAFC) — the 10-K claims higher efficiency, no combustion, 99.9% fleet availability on post-2020 non-redundant installs, and deployment in weeks-to-months while turbine OEMs are supply-constrained. That time-to-power window is currently being monetized in AI datacenters: the Q2 2026 release (2026-07-28) reported record revenue of $1,065.4M (+165.5% YoY) and management said all major U.S. hyperscalers have 'validated and approved' Bloom, calling it 'a standard for AI onsite power.' The moat is rated narrow, not wide: the 10-K's own risk factors stress that distributed generation is an emerging market with uncertain acceptance, three customers were 43%/13%/12% of FY2025 revenue, and industry coverage (Energy Changemakers, 2026-07-04) shows FuelCell Energy signing deals of comparable scale — the advantage is a technology-and-execution lead that rivals and turbine capacity additions can compress, not a structural lock. | ASML is the sole producer of EUV lithography systems, the only tools able to pattern the most advanced logic and memory nodes, with a roadmap "intended to drive affordable scaling to 2030 and beyond" and a High-NA EUV (TWINSCAN EXE) platform on which customers "had run more than 400,000 wafers" by end-2025. That dominance is protected by 25 years of accumulated engineering IP and an exclusive lock on Carl Zeiss SMT optics that competitors cannot replicate. |
| Chain position | Downstream AI-cloud operator: owns grid-connected data centers and deploys NVIDIA/AMD GPU systems it rents to hyperscalers, frontier labs, AI developers and enterprises (anchor customers Microsoft and NVIDIA). | Onsite prime-power supplier to AI infrastructure: per the FY2025 10-K, AEP is procuring up to 1 GW of Bloom fuel cells for AI datacenter loads, Brookfield established a financing framework (up to $5.0B over five years at signing, per the 10-K) housed in an AI Infrastructure Fund, and SK ecoplant (a ~2.5% Class A holder) distributes and co-assembles in Korea; the Q2 2026 release adds that all major U.S. hyperscalers plus over a dozen neoclouds, AI labs, and colocation operators have approved Bloom's systems. | Upstream chokepoint of the AI chip supply chain: every leading-edge logic/DRAM wafer for AI accelerators is patterned on ASML EUV tools, making it the single indispensable equipment supplier to TSMC, Samsung and Intel. |
| Products (share / barrier) |
|
|
|
| Long-horizon vote | -0.20 at weight 0.20 · swarm bearish Editorial prior, not backtested. | +0.20 at weight 0.20 · swarm bullish Editorial prior, not backtested. | +0.42 at weight 0.20 · swarm bullish Editorial prior, not backtested. |