Skip to content

Compare moats

Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.

comparing IREN×Digital Realty Trust×Oracle× maximum of 3 — remove one to swap
IREN IREN ai moat: latest change 2026-08-27 Digital Realty Trust DLR ai moat: latest change 2026-02-13 Oracle ORCL ai moat: latest change 2026-06-22
Moat rating none

The FY2026 10-K (filed 2026-08-27) shows IREN holds an input the industry competes on: it names 'access to secured and energized power' first among what it believes are the principal competitive factors in its industry, and reports 'executed grid connection agreements, letters of agreement or equivalents representing approximately 5GW of total power capacity' in the United States, Canada, Spain and Australia as of June 30, 2026. It does not claim an advantage over rivals in that input. It says 'Certain competitors may have access to more competitively priced power, a greater access to power and a better capacity to timely secure grid connections,' and 'Many of our competitors have greater financial, technical or commercial resources, longer cloud operating histories or larger customer bases, compared to us.' Operating AI Cloud Services capacity was approximately 40MW at June 30, 2026, and the stored XBRL fundamentals from this 10-K show an FY2026 operating loss of about $1,046.7M on revenue of about $707.0M, so no durable advantage is yet demonstrated.

source: sec.gov

narrow

The FY2025 10-K's own competitive record cuts both ways. Item 1 says a "high-quality, highly interconnected global portfolio such as ours could not be easily replicated today on a cost-competitive basis," yet Item 1A concedes that competitors have "significantly greater financial, marketing and other resources and more ready access to capital" and that as rivals keep developing space, "rental rates may be reduced or we may face delays in leasing." A durable advantage that its own filing says new supply can price against is bounded, not unassailable.

source: sec.gov

wide

Oracle's FY2026 10-K (fiscal year ended May 31, 2026) describes an installed base in which "substantially all customers opt to purchase software support contracts when they purchase an Oracle software license"; that entrenchment shows up externally as the #1 DB-Engines database ranking (August 2026, first of 435 systems) and $638B of contracted Remaining Performance Obligations at Q4 FY2026 (press release, June 10, 2026) — a durable, multi-decade lock on mission-critical enterprise data layers.

source: sec.gov

Moat type none

The FY2026 10-K's asserted advantage is control from owning its data centers, 'including the associated land, grid connections and substations', which it believes allows it 'to benefit from more sustainable cash flows and operational flexibility relative to operators that rely upon third-party colocation services or short-term land leases'. Its only scale language is a belief that its 'procurement scale, deployment experience and direct control over the data center layer' lets it bring new compute into service 'rapidly and at scale', a deployment-speed claim, and it 'generally target[s]' regions with 'low-cost and attractive renewable energy sources', a siting target rather than a demonstrated cost position. It does not claim a cost or scale lead: it says 'Many of our competitors are larger, have longer operating histories and significantly greater resources than we do' and that certain competitors 'may have access to more competitively priced power, a greater access to power and a better capacity to timely secure grid connections.' There is no network effect or lock-in either, since existing contracts have 'terms ranging from month to month up to five years'. No enumerated moat source is grounded.

source: sec.gov

network effects

Item 1 attributes the hard-to-replicate part of the portfolio to connectivity rather than to real estate: "the network density, interconnection infrastructure and connectivity-centric customers in certain of our data centers have led to the organic formation of densely connected data communities that are difficult for competitors to replicate." That community sits on over 232,000 cross connects in over 55 metros, so each network and cloud that lands makes the same building worth more to the next tenant.

source: sec.gov

switching costs

The core moat is the cost of moving mission-critical databases and back-office suites: the FY2026 10-K notes substantially all license customers attach support contracts and that Oracle's Multicloud Database offerings run Oracle AI Database inside other hyperscalers' clouds — monetizing the installed base even when the customer's infrastructure leaves; the KLAS 2026 EHR report shows the same dynamic in health IT, where roughly a third of Oracle Health customers want to leave but feel unable to do so.

source: sec.gov

Leadership behind

The 10-K lists IREN's competitors as hyperscalers (Amazon Web Services, Google Cloud, Microsoft Azure, Oracle Cloud) and specialized AI Cloud Services providers (CoreWeave, Nebius, Crusoe, Lambda, Nscale, SpaceX and others). It says IREN began providing AI Cloud Services in 2024 and cites its 'shorter operating history in AI Cloud Services relative to some competitors', and states 'Some of our competitors have longer operating histories, larger customer bases, more comprehensive IP portfolios and patent protections, more design wins, and greater financial, sales, marketing and distribution resources than we do.' Operating AI Cloud Services capacity was approximately 40MW at June 30, 2026. The filing describes a smaller, later entrant that trails some competitors on operating history, customer base and resources, with its progress so far resting on two anchor contracts (a ~$9.7B five-year Microsoft agreement and a ~$3.4B five-year NVIDIA contract) rather than any claimed category position.

source: sec.gov

co leader

Item 1 claims the title of "the largest global provider of cloud- and carrier-neutral data center, colocation and interconnection solutions," but the Competition section names Equinix and NTT as operators of properties "similar to ours in some of the same metropolitan areas," plus Global Switch and regional operators abroad — a shared top tier on the company's own telling, not a solitary one.

source: sec.gov

co leader

Split by line: clear leader in database (DB-Engines August 2026 ranks Oracle #1 and Oracle-owned MySQL #2 of 435 systems); one of the largest enterprise-application vendors ($15.9B FY2026 SaaS revenue, competing with SAP, Salesforce, Workday and Microsoft per the FY2026 10-K); but in cloud infrastructure a ~4%-share fast-growing challenger behind Amazon (28%), Microsoft (20%) and Google (15%) per Synergy Q2 2026 data (The Register, 2026-08-01), and #2 in US acute-care EHR behind Epic (KLAS 2026).

source: sec.gov

Pricing power weak

The 10-K's risk factors state 'Our competitors' products, services and technologies may be cheaper or provide better functionality or features than ours, which has resulted and may in the future result in lower-than-expected selling prices or demand for our products.' They also say long-term contract pricing 'is generally fixed or agreed at the time of contracting', so if market pricing for comparable capacity rises during a contract's term 'we will not benefit from those increases with respect to capacity already committed under our existing long-term contracts', and that if customers suffer a downturn or discontinue its services it 'may be compelled to offer more flexible terms, lower our prices or risk losing a significant customer.' The stored XBRL fundamentals from this 10-K show FY2026 revenue of about $707.0M against an operating loss of about $1,046.7M, so there is no margin record yet that evidences pricing power.

source: sec.gov

strong

FY2025 renewals signed re-priced upward in every bucket — +27.0% on greater-than-1 MW space ($146 to $186 per square foot), +4.6% on 0-1 MW ($268 to $280) and +43.0% on other ($49 to $71) — and MD&A expects average aggregate rental rates on 2026 renewals to be positive against the rates currently paid for the same space "on a GAAP basis and on a cash basis." On costs, the filing says utilities expense "is our largest expense category" and that "the vast majority of the expense is passed directly through to our customers," which it credits with significantly mitigating exposure to power-cost increases rather than removing it. The cap: Item 1A warns competitor development could still force rates down.

source: sec.gov

moderate

Strong in the installed base — the FY2026 10-K states substantially all license customers purchase support contracts, a recurring stream customers rarely drop — but the same 10-K lists "total cost of ownership" first among key competitive factors and describes intense competition across every segment; AI-infrastructure deals are won against hyperscalers and neoclouds, and Q4 FY2026 SaaS grew a moderate 10% versus 93% for IaaS (press release, June 10, 2026).

source: sec.gov

Summary

Per its FY2026 10-K, IREN is a vertically integrated AI Cloud Services platform that owns the data center, compute and software layers, underpinned by executed grid connection agreements, letters of agreement or equivalents representing ~5GW and a further multi-GW development pipeline. Its commercial record is concentrated: a five-year Microsoft agreement (~$9.7B total contract value, Horizon 1 delivered and accepted in August 2026, Horizons 2-4 targeted for delivery in phases in calendar Q4 2026) and a five-year ~$3.4B NVIDIA cloud contract together make up a substantial majority of contracted revenue. It holds NVIDIA Preferred Partner and Exemplar Cloud status (HGX B300 and GB300 NVL72) and a strategic partnership intended to support the deployment over time of up to 5GW of NVIDIA DSX-aligned infrastructure, which the filing cites among arrangements that are non-binding or subject to conditions, with no assurance as to the extent of deployments. Against that, the filing names hyperscaler and specialized competitors (AWS, Google Cloud, Azure, Oracle, CoreWeave, Nebius, Crusoe, Lambda, Nscale, SpaceX), many of which it says have greater resources, customers that can use or develop their own solutions, and possible delays to Texas energization from changes to ERCOT's Batch Zero procedures, so the power position is not a demonstrated advantage over rivals and its value depends on execution.

Digital Realty rents space, power and connectivity rather than compute: at 2025 year-end its portfolio held 310 data centers and roughly 57.6 million rentable square feet across more than 55 metros in over 30 countries, about 84.7% leased, serving more than 5,000 customers. Two different businesses sit inside that footprint. The greater-than-1 MW wholesale side is a capital-and-power race — 769 MW of projects underway with 64% pre-leased, and land that "could accommodate over 3,500 megawatts of additional data center capacity" — where the 10-K names Equinix, NTT, Global Switch and "various private operators" as rivals and warns that added supply can push rents down. The colocation and interconnection side is the defended half: over 232,000 cross connects and the "densely connected data communities" Item 1 says competitors cannot easily replicate, reinforced by contracts the filing describes as generally running 5-10+ years on large deployments and by improvements "installed at our customers' expense." FY2025 leasing supports that read — renewals signed re-priced +27.0% on greater-than-1 MW space and +4.6% on 0-1 MW — while customer concentration is the offsetting exposure, with the largest customer at roughly 11.7% of annualized recurring revenue.

Oracle pairs the deepest switching-cost franchise in enterprise software — the #1-ranked database (DB-Engines, August 2026) plus Fusion/NetSuite back-office suites, with support attach near-universal per the FY2026 10-K — with a late but explosive push into AI cloud infrastructure: Q4 FY2026 IaaS revenue grew 93% to $5.8B and RPO reached $638B (up 363% YoY), mostly large-scale AI contracts (press release, June 10, 2026). The two reinforce each other via multicloud — Oracle Multicloud AI Database grew 404% in Q4 running inside rival clouds. The offsets: in cloud infrastructure Oracle is still a ~4%-share challenger behind AWS/Microsoft/Google (Synergy Q2 2026 data via The Register), the AI buildout drove FY2026 free cash flow to negative $23.7B, and the Cerner-based Oracle Health business has lost US hospital share for three straight years (KLAS 2026).

Chain position

Downstream AI-cloud operator: owns grid-connected data centers and deploys NVIDIA/AMD GPU systems it rents to hyperscalers, frontier labs, AI developers and enterprises (anchor customers Microsoft and NVIDIA).

Landlord to the AI stack — sells the space, power and interconnection that cloud, network and enterprise tenants run compute in (Oracle, IBM, Meta Platforms, AT&T, Comcast and Lumen are among the customers named in Item 1), with roughly 2.9 GW of total in-place IT capacity.

Supply-chain role in AI: OCI sells GPU compute for AI training and inference — the Q4 FY2026 press release attributes most of the $85B sequential RPO increase to large-scale AI contracts (some with customer-prepaid or customer-supplied GPUs totaling $75B) and guides FY2027 total revenue to $90B — making Oracle a primary capacity supplier to AI model builders.

Products (share / barrier)
  • AI Cloud Services (bare metal and managed GPU compute) Unknown · Moderate source: sec.gov
  • AI infrastructure software (Mirantis k0rdent AI) Unknown · Low source: sec.gov
  • Bitcoin mining (in wind-down) Unknown · Low source: sec.gov
  • Owned data centers and grid-connected power portfolio Unknown · Moderate source: sec.gov
Long-horizon vote -0.20 at weight 0.20 · swarm bearish

Editorial prior, not backtested.

see exactly how it voted →

+0.17 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

+0.30 at weight 0.20 · swarm bullish

Editorial prior, not backtested.

see exactly how it voted →