Skip to content

Compare moats

Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.

comparing KLA Corporation×Applied Digital×Equinix× maximum of 3 — remove one to swap
KLA Corporation KLAC ai moat: latest change 2026-08-06 Applied Digital APLD ai moat: latest change 2026-07-29 Equinix EQIX ai moat: latest change 2026-02-11
Moat rating wide

The fiscal 2026 10-K states 'The strength of our competitive positions in many of our existing markets is primarily due to our leading technology', and frames process control as 'an essential enabler' of the yield ramp in fabs the filing says now cost 'well above $10 billion'.

source: sec.gov

none

The FY2026 10-K (filed 2026-07-29) shows contracted revenue, not a demonstrated competitive edge. About 1,410 MW is leased under 15-year take-or-pay, non-cancellable base terms worth about $36.2 billion, but only about 100 MW of the roughly 1.5 GW that is contracted and either operating or under construction was operating and earning revenue at May 31, 2026, and Item 1A says "lessees may have the right to terminate applicable leases if there are significant delays in construction." Item 1A also concedes "We do not have the resources to compete with larger providers of similar products or services at this time," and the Competition section names 13 power-advantaged developers the company competes with. Signed leases give revenue visibility, but the filing does not show a durable advantage.

source: sec.gov

wide

The FY2025 10-K (filed 2026-02-11) grounds the advantage in an asset that took 27 years to assemble and that a competitor cannot buy: "Over our 27-year history, we have curated a diverse, industry-leading ecosystem of more than 500,000 interconnections", "over 10,500 customers, including 2,000+ network service providers and a leading market share of cloud-on ramps", across "280 data centers, in 77 markets in 36 countries", with "99.9999%+ operational uptime" delivered in 2025 and no single customer at 10% of revenue. Because the value of each IBX rises with who else is already inside it, incumbency compounds rather than decays. The counterweight is real and disclosed: Item 1A says "The global multi-tenant data center market is highly fragmented. It is estimated that we are one of more than 2,400 companies that provide these offerings around the world", and warns that competitors "may adopt aggressive pricing policies". That caps the pricing that the moat converts into, not its durability — the fragmentation sits in commodity space-and-power, while the interconnection density the filing describes has no comparable substitute. FY2025 revenue of $9.217B with operating margin recovering to 20.0% from 15.2% in FY2024 is consistent with the incumbency holding.

source: sec.gov

Moat type intangibles ip

The 10-K reports over 9,100 active patents and over 3,600 pending applications with terms running through 2045, alongside proprietary process-control software (Klarity, I-PAT, aiSIGHT) that turns inspection and metrology data into yield learning.

source: sec.gov

none

The 10-K claims three advantages: power-advantaged sites (it believes securing power and interconnection ahead of demand is 'the principal constraint on new HPC capacity and a core differentiator for us from many of our competitors'), a standardized 'franchise-style' design, and hyperscaler master service and master telecom service agreements 'that are difficult to obtain.' The filing does not show any of them to be durable. Its Competition section says competition 'centers on securing and developing sites with access to large-scale, reliable, and cost-competitive power and interconnection' and names 13 power-advantaged developers going after the same leases, and Item 1A concedes it lacks the resources to compete with larger providers. Signed leases are take-or-pay and non-cancellable, so a tenant leaving for convenience owes 'the full remaining contractual value,' but that is contractual lock-in on each lease rather than a moat source, so no moat type is assigned.

source: sec.gov

network effects

The 10-K names the mechanism itself, twice and unprompted: "As more customers choose Equinix for high connectivity and performance reliability at the metro edge, it benefits their suppliers and business partners to colocate in the same data centers and connect directly with each other. This adjacency creates a network effect that attracts new customers while continuously enhancing our value proposition to existing customers", and in the Competitive Landscape section, "This ecosystem creates a network effect that improves performance and lowers the cost for our customers". The evidence is the count of participants rather than any patent or unit-cost claim — 500,000+ interconnections, 2,000+ network service providers, a leading share of cloud on-ramps, an Internet Exchange the filing calls "the largest global peering solution". Switching costs are a genuine second layer (fixed-duration contracts billed on space and power, physical cross connects into resident counterparties), but they are what holds a customer already inside the ecosystem; the reason to enter in the first place is who is already there.

source: sec.gov

Leadership clear leader

The 10-K opens by describing KLA as a supplier of 'industry-leading equipment and services' and attributes its competitive positions 'in many of our existing markets' primarily to leading technology; named competitors are Applied Materials, ASML, Hitachi High-Tech, Lasertec and Onto Innovation.

source: sec.gov

behind

The 10-K makes no leadership claim and gives no ranking or share figure. Item 1A concedes "We do not have the resources to compete with larger providers of similar products or services at this time" and that some rivals have "substantially greater liquidity and financial resources than we do." Its Competition section places APLD against established operators (Digital Realty, Equinix), hyperscalers that build their own capacity, independent developers and 13 named power-advantaged developers (IREN, Cipher Digital, TeraWulf, Hut 8, Riot, CleanSpark, HIVE, Core Scientific, Bitdeer, Galaxy Digital, Fermi, Keel Infrastructure, MARA).

source: sec.gov

clear leader

Leadership is claimed on interconnection, not on square footage, and the filing's own evidence is about density: "our position is unmatched in the industry" is supported by 2,000+ resident network service providers, "a leading market share of cloud-on ramps", 500,000+ interconnections and an Internet Exchange described as "the largest global peering solution", across 36 countries. The band is read against neutral, ecosystem-dense colocation, where that footprint has no direct analogue. It is deliberately not read against total data centre capacity: the same 10-K puts Equinix among "more than 2,400 companies" in a "highly fragmented" MTDC market, and Item 1A concedes the company must compete for land and power against "new market entrants" drawn in by AI.

source: sec.gov

Pricing power strong

Services were approximately 23% of fiscal 2026 total revenues on an installed base that recurs, backlog nearly doubled to $12.57 billion, and SEC-reported net income was 35.6% of revenue in fiscal 2026 with operating income at 41.2% of revenue in fiscal 2025.

source: sec.gov

weak

Item 1A says "Due to the limited number of hyperscalers, we expect that a limited number of customers will continue to account for a high percentage of our revenue for the foreseeable future," and that if customers' equipment usage declines or they discontinue use of its facilities, APLD "may be compelled to lower our lease prices in some instances or risk losing a significant customer." One customer was 59% of FY2026 revenue from continuing operations. Take-or-pay, non-cancellable terms protect contracted revenue over the base term, and Note 19 reports a $39.1M HPC Hosting segment profit on $385.3M of segment revenue in FY2026, but those terms are agreed with a small group of concentrated buyers.

source: sec.gov

moderate

Contract structure supports price: fixed-duration agreements billed on space and power plus per-connection interconnection fees, an installed base too physically entangled to move cheaply, and 99.9999%+ uptime in 2025 as the thing being paid for. FY2025 revenue of $9.217B grew about 5% on FY2024's $8.748B while operating margin recovered to 20.0% from 15.2%, so pricing and cost were at least held. But the filing itself refuses the strong band: competitors "may adopt aggressive pricing policies, especially if they are not highly leveraged or have lower return thresholds than we do. As a result, we may suffer from pricing pressure that would adversely affect our ability to generate revenues", and some rivals bundle communications or cloud services against bare colocation. Power procurement is a further pass-through risk the filing flags. Price is defended, not dictated.

source: sec.gov

Summary

KLA sells the inspection, metrology and yield-management layer a fab must run to reach volume production: the 10-K says accelerating the yield ramp ahead of competitors is critical to chipmakers' profitability, and backlog nearly doubled from $7.86 billion to $12.57 billion in the year to June 30, 2026 'due to strong demand driven by the AI infrastructure buildout'.

Applied Digital designs, builds and operates purpose-built, liquid-cooled HPC data centers, which it calls 'AI factories', and leases the capacity to CoreWeave and investment-grade hyperscalers. At May 31, 2026 its 10-K lists five campuses (Polaris Forge 1-3 and Delta Forge 1-2) with about 1,410 MW contracted under roughly 15-year take-or-pay, non-cancellable leases worth about $36.2 billion over the base terms. The filing claims three sources of advantage: it controls power-advantaged sites, it uses a standardized 'franchise-style' design built to deliver about 150 MW in about 14 to 18 months, and it holds hyperscaler master agreements that are 'difficult to obtain.' The same document shows how early the company is. About 100 MW was operating and earning revenue. One customer was 59% of FY2026 revenue from continuing operations. It competes with Digital Realty, Equinix, hyperscalers that build their own capacity and 13 named power-advantaged developers, and it concedes that it lacks the resources to compete with larger providers. Signed leases give long-dated revenue visibility, but the filing does not show a durable competitive advantage.

Equinix is a network-neutral, multi-tenant colocation and interconnection REIT: it does not sell compute, it sells the metro-edge real estate where networks, clouds and enterprises physically meet. The FY2025 10-K describes the platform as "280 data centers, in 77 markets in 36 countries" serving "over 10,500 customers, including 2,000+ network service providers and a leading market share of cloud-on ramps", carrying "more than 500,000 interconnections" curated over 27 years, with 61% of 2025 revenue recognised outside the U.S. Revenue is structurally recurring — infrastructure offerings are "billed based on the space and power a customer consumes" under fixed-duration contracts generating MRR, interconnection is "billed based on the outbound connections from a customer" — and no customer reached 10% of 2025 revenue. AI enters the story as demand rather than as a product: the filing positions Equinix as the interconnect point for "model providers, data platforms, neoclouds and gateways", and pushes core hyperscale capacity into xScale, which is "developed and operated through our joint venture partnership arrangements". The bear case is in the company's own Item 1A. The MTDC market is "highly fragmented", Equinix being "one of more than 2,400 companies"; competitors "may adopt aggressive pricing policies"; the AI build-out invites "significant investments in the data center industry by both current competitors and new investors", after which "we could lose market share" and must "compete against certain of these competitors to secure the land and power needed for our expansion plans". Product extension has also failed before — the filing notes past offerings "have been or are being discontinued, including the Equinix Metal product". The honest reading: the interconnection ecosystem is close to unreplicable and the moat sits there; the capacity business around it is a capital race Equinix enters with scale but no immunity.

Chain position

Sits beside the process steps rather than in them — it measures and inspects what deposition, etch and lithography produce, and TSMC alone exceeded 10% of revenue in each of the last three fiscal years.

Developer and landlord of power-advantaged, liquid-cooled AI data-center capacity, leased long-term to CoreWeave and investment-grade hyperscalers.

Equinix is the neutral meeting point of the AI and cloud supply chain rather than a link in its manufacturing path: it houses other companies' compute and sells the adjacency between them. The 10-K places it between the network layer (2,000+ service providers), the cloud layer ("a leading market share of cloud-on ramps") and enterprise consumers who "assemble these capabilities into operational stacks", and describes an AI ecosystem "of model providers, data platforms, neoclouds and gateways" curated for enterprise AI demand. Core hyperscale training capacity sits beside that, not inside it, in xScale, built with JV partners so hyperscalers "add to their core hyperscale data center deployments and existing customer access points at Equinix". The revenue is therefore levered to AI's distribution and inference edge more than to training-cluster buildout.

Products (share / barrier)
  • Metrology (Archer overlay, SpectraFilm, SpectraShape, Therma-Probe) Top 3 · Deep source: sec.gov
  • PCB and Component Inspection (Orbotech direct imaging, ICOS) Unknown · Moderate source: sec.gov
  • Reticle and mask inspection (Teron, TeraScan, LMS IPRO) Top 3 · Deep source: sec.gov
  • Semiconductor process-control software (Klarity, I-PAT, aiSIGHT, 5D Analyzer) Unknown · Moderate source: sec.gov
  • Specialty Semiconductor Process (SPTS etch, deposition and plasma dicing) Niche · Moderate source: sec.gov
  • Wafer defect inspection and review (Surfscan, Puma, eSixx, eDR7xxx, Voyager) Leader · Deep source: sec.gov
  • Blockchain data center hosting (Jamestown / Ellendale) Niche · Low source: sec.gov
  • HPC data center leasing (Polaris Forge / Delta Forge AI factories) Challenger · Moderate source: sec.gov
Long-horizon vote +0.42 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

-0.20 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

+0.38 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →