Skip to content

Compare moats

Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.

comparing NetApp×SK Hynix×Hut 8× maximum of 3 — remove one to swap
NetApp NTAP ai moat: latest change 2026-06-05 SK Hynix SKHY ai moat: latest change 2026-01-28 Hut 8 HUT ai moat: latest change 2026-02-25
Moat rating narrow

The FY2026 10-K shows a real, durable lock but not an unassailable one. On the durable side: "Our cloud storage services are based on the same ONTAP data management software that underpins our on-premises ONTAP storage infrastructure offerings", and the same filing's income statement shows the company holding a gross margin near 71% across all three reported years - $4,433M on $6,268M in FY2024, $4,613M on $6,572M in FY2025 and $4,899M on $6,925M in FY2026 - while revenue grew from $6,268M to $6,925M and income from operations widened from 19% to 24% of net revenues. Holding that margin through the memory-cost shock the same filing discloses is the commercial evidence the lock is worth something. On the limiting side, the filing says competition "is intense", that in public cloud "customers may choose native cloud services that are consumed as operating expenses", and that "New competitors or alliances among existing competitors could emerge and quickly gain significant market share" - and IDC's 1Q26 external-storage tracker (Blocks & Files, 2026-06-16, cited on the AFF/ASA product row below) ranks NetApp second behind Dell, not first.

source: sec.gov

narrow

SK hynix held ~62% of the AI-critical HBM market in Q2 2025 (Counterpoint, via TweakTown) and was first to mass-produce HBM4, but memory remains a cyclical three-player business where Samsung and Micron are closing the HBM gap — a real but contestable edge.

source: news.skhynix.com

narrow

The FY2025 10-K says 'we believe we have established a defensible competitive advantage through our power-first, innovation-driven strategy', resting on a power-native team, an application-agnostic framework for digital infrastructure design, end-to-end greenfield development capabilities, and the use of ASIC compute builds to rapidly and cost-effectively secure and monetize power. What separates this from no moat is scarce power: the filing says demand for energy capacity continues to outpace supply and that 'grid interconnection bottlenecks have further constrained access to power and digital infrastructure development', and Hut 8 reports 330 MW of utility capacity under construction at River Bend, commercialized in December 2025 through a 15-year triple-net lease supporting 245 MW of IT capacity, plus 1,230 MW of utility capacity under development. The same filing says 'The industries in which we operate are highly competitive and continuously evolving.', warns that these factors 'might not provide the competitive advantage we anticipate, or if they do, such competitive advantage might not endure', cites the River Bend lease (valued at $7.0 billion over the base term) as an example of expecting a significant portion of revenue from a limited number of customers, and says the company has not maintained consistent profitability. That supports narrow at most, not wide.

source: sec.gov

Moat type switching costs

The FY2026 10-K makes the source of the advantage explicit and it is the cost of leaving the data-management layer, not a network or a patent estate. The same ONTAP software runs the on-premises arrays and the cloud services ("Our cloud storage services are based on the same ONTAP data management software that underpins our on-premises ONTAP storage infrastructure offerings"), and the AFF family "allows customers to connect to clouds for more data services, data tiering, caching, and disaster recovery". A customer's volume layout, snapshot and replication workflow and operating tools therefore carry from the array into Azure, AWS and Google rather than being abandoned at the cloud boundary — the filing describes NetApp as "the only provider of enterprise-grade storage services natively embedded in the world's largest public cloud providers", so the usual moment of escape is instead the moment the relationship renews.

source: sec.gov

intangibles ip

The advantage is process-and-packaging technology leadership: SK hynix achieved industry-first HBM4 mass production in September 2025 and has positioned itself as NVIDIA's key HBM partner, per its record FY2025 results.

source: news.skhynix.com

cost scale

The 10-K says 'we believe success depends on the ability to secure scarce assets like power, data center equipment, and customers', and places part of its claimed edge in 'our ability to use ASIC compute infrastructure development to rapidly and cost-effectively secure and monetize power'. Its examples: Vega was energized less than a year after acquisition for an all-in cost of about $455,000 per megawatt, which the filing calls 'a fraction of traditional data center costs', and Salt Creek was completed for about $250,000 per MW; Vega also has immediate access to some of the lowest locational wholesale power prices in North America. These are low-redundancy ASIC compute builds, which the 10-K says carry relatively low capital intensity by design. The 'fraction of traditional data center costs' comparison is against a different facility tier, and the filing gives no peer cost comparison and no cost figure for its AI campuses.

source: sec.gov

Leadership co leader

IDC's 1Q26 external enterprise storage systems tracker, as reported by Blocks & Files on 2026-06-16 (cited in full on the AFF/ASA product row below), ranks NetApp second worldwide behind Dell and ahead of Everpure, Huawei and HPE, attributing the placing to "its growing all-flash business and cloud-integrated data management". Second of five ranked vendors, in a market whose leader is someone else, is a shared front rank rather than an owned one - and the distinct claim NetApp makes in the FY2026 10-K is positional rather than volumetric: being "the only provider of enterprise-grade storage services natively embedded in the world's largest public cloud providers".

source: sec.gov

clear leader

Clear leader in HBM (#1 at ~62% share, Q2 2025) and became the world's top overall memory supplier in Q2 2025; caveat: it sits #2 to Samsung in commodity DRAM by volume and Micron/Samsung are narrowing the HBM gap heading into HBM4.

source: news.skhynix.com

fast follower

The 10-K says 'For example, we signed our first large scale single tenant AI data center lease and commenced construction of the site at our River Bend campus.', offered under the statement that to remain competitive with peers it may need to modify aspects of its business model. River Bend was commercialized in December 2025 through a 15-year triple-net lease supporting 245 MW of IT capacity; Fluidstack is expected to serve as tenant and Google is expected to provide a financial backstop, and initial delivery is targeted for Q2 2027. On speed, the filing says 'Through early engagement with Entergy Louisiana, we assumed key interconnection and development functions typically managed by the utility, such as the development of transmission and distribution infrastructure, materially accelerating originally quoted power delivery timelines.', and that Vega was energized 'less than a year after acquiring it'. It also warns that Hut 8 competes against companies 'that may be more established or have greater financial and other resources and/or expertise'. That describes a newer entrant moving quickly, not an established leader.

source: sec.gov

Pricing power moderate

It holds price rather than raising it. On the figures filed with the FY2026 10-K, gross margin was 70.7% of revenue in FY2024 ($4,433M on $6,268M), 70.2% in FY2025 ($4,613M on $6,572M) and 70.7% in FY2026 ($4,899M on $6,925M) - flat across three years in which revenue grew from $6,268M to $6,925M - and it held that level while absorbing a component-cost shock. It is no stronger than that because the filing's own risk factor lists "competitive pricing, customer price sensitivity" and "pricing and discounting pressures" among the drivers of gross margin, and discloses that the company "experienced inflationary pressure and supply chain constraints beginning in the second half of fiscal 2026, resulting in increased costs for memory and other components, which have affected our gross margins" - a cost shock it is absorbing rather than fully passing on.

source: sec.gov

strong

FY2025 operating margin hit a record 49% (operating profit +101% YoY) as HBM revenue more than doubled — unusually strong pricing power for a memory maker, per SK hynix's FY25 release.

source: news.skhynix.com

weak

The 10-K says ASIC compute, run through American Bitcoin, can only be profitable if hardware and electricity costs are below the price of the Bitcoin mined, which makes it a price-taking business. It also says Traditional Cloud and AI Cloud compete with cloud services providers for customers, and that the company has not maintained consistent profitability. River Bend's contracted triple-net lease economics are not in service yet; initial delivery is targeted for Q2 2027.

source: sec.gov

Summary

NetApp sells storage hardware but the asset is ONTAP, the data-management software that has run its arrays for over three decades and now also runs inside the three largest public clouds as a first-party service. The FY2026 10-K organises the company into two segments, Hybrid Cloud (AFF and ASA all-flash arrays, AFX for AI workloads, FAS hybrid-flash, E/EF-Series, StorageGRID object storage) and Public Cloud (Azure NetApp Files, Amazon FSx for NetApp ONTAP, Google Cloud NetApp Volumes, Cloud Volumes ONTAP), and states that both rest on the same ONTAP software. That is the whole argument: an enterprise that has standardised its snapshots, replication and multiprotocol access on ONTAP carries those habits with it when it moves workloads to a hyperscaler, and NetApp is paid on both sides of the move. The evidence that the lock has commercial value is the margin's steadiness: across the three years the FY2026 10-K reports, gross margin sat at 70.7%, 70.2% and 70.7% of revenue ($4,433M on $6,268M, $4,613M on $6,572M, $4,899M on $6,925M) while revenue grew, and the filing's own percentage-of-revenue table shows no mix shift doing that work - product and services held near 46% and 54% of revenue throughout. The limits are equally in the filing. NetApp is second, not first: IDC's 1Q26 tracker puts it behind Dell in external enterprise storage, and the 10-K's competition section concedes that cloud providers are simultaneously partners and rivals, that consumption models "may reduce overall demand for our traditional on-premises offerings sold through a capital expenditure (capex) model", and that alternative architectures "may reduce or eliminate demand for some of our offerings". Component exposure is real too: the filing discloses "inflationary pressure and supply chain constraints beginning in the second half of fiscal 2026, resulting in increased costs for memory and other components, which have affected our gross margins", and names NAND among the components whose supply can tighten. This is a durable second place built on software stickiness, not a structural monopoly.

SK hynix's durable advantage rests on an HBM process-and-packaging lead: it held roughly 62% of the HBM market in Q2 2025 (Counterpoint) as NVIDIA's key HBM partner, and delivered industry-first HBM4 mass production. That lead drove record FY2025 results with a 49% operating margin, though rivals are qualifying competing HBM parts.

Per its FY2025 10-K, Hut 8 is a power-first infrastructure developer. It originates powered land and interconnections, uses ASIC compute builds, which the filing says combine relatively low capital intensity with rapid deployment, as a transitional load to monetize sites sooner, and aims to transition suitable power assets to higher-return uses; its River Bend campus was commercialized through a 15-year AI data center lease. The filing claims a defensible advantage but warns it might not provide the advantage anticipated, or might not endure. It says Hut 8 competes for powered land with digital infrastructure developers and large-scale Bitcoin miners, and its first AI campus is still under construction. Its majority-owned Bitcoin miner, American Bitcoin, can only be profitable when mining costs are below the price of the Bitcoin mined, and the filing says it believes American Bitcoin must keep acquiring miners to keep up with a growing global network hashrate.

Chain position

NetApp sits between the memory supply and the enterprise data centre. Upstream, the FY2026 10-K says "Third-party component costs make up a significant portion of our product costs" and singles out NAND as hard to manage "if supplies of certain components, including NAND, become limited relative to demand". Downstream, the hyperscalers are channel, partner and rival at once: the filing states "We both partner with and compete against cloud service providers through our cloud-based software and services offerings", while Azure NetApp Files, Amazon FSx for NetApp ONTAP and Google Cloud NetApp Volumes are delivered as those clouds' own natively embedded services. Distribution is a mix of direct sales and "an ecosystem of partners, including the leading cloud providers".

Primary supplier of HBM (high-bandwidth memory) stacked onto NVIDIA's AI accelerators; HBM represented roughly 77% of Q2 2025 revenue.

Power-first developer building AI data center capacity, beginning with River Bend under a 15-year lease (Fluidstack is the expected tenant and Google is expected to provide a financial backstop; initial delivery is targeted for Q2 2027), and runs Bitcoin mining through majority-owned American Bitcoin.

Products (share / barrier)
Long-horizon vote +0.13 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

+0.24 at weight 0.20 · swarm bullish

Editorial prior, not backtested.

see exactly how it voted →

-0.01 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →