Skip to content

Compare moats

Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.

comparing Schneider Electric×GitLab×Oracle× maximum of 3 — remove one to swap
Schneider Electric SBGSY ai moat: latest change 2026-03-27 GitLab GTLB ai moat: latest change 2026-08-05 Oracle ORCL ai moat: latest change 2026-06-22
Moat rating wide

In its 2025 Universal Registration Document the Group states a #1 market position in electrical distribution in each of its four end markets, plus #1 in grid and #1 in industrial data and safety, reached through a channel it sizes at more than 1.4 million contractors and electricians alongside panel builders, integrators and distributors; FY2025 closed with a record-high backlog of EUR 25,362 million and, per the CFO section, a fifth consecutive year of profitability expansion, with adjusted EBITA margin at 18.7% (+50bps organic).

source: download.schneider-electric.com

narrow

The FY2026 10-K (year ended 2026-01-31) shows real expansion inside the installed base: 118% Dollar-Based Net Retention, Base Customers up to 10,682 from 9,893, customers above $100,000 of ARR up to 1,456 from 1,229, and $1.0 million ARR customers "to 155 from 123, an increase of 26%". But the filing concedes "limited barriers to entry" and names "Microsoft Corporation, which owns GitHub" as principal competitor. Retention decelerates (130% FY2024, 123% FY2025, 118% FY2026), and since DBNR is reported "on a threshold basis of 130%," the FY2024 figure is a cap and the slide is steeper than it looks. Narrow, not wide: expansion must be re-won against a bundled hyperscaler.

source: sec.gov

wide

Oracle's FY2026 10-K (fiscal year ended May 31, 2026) describes an installed base in which "substantially all customers opt to purchase software support contracts when they purchase an Oracle software license"; that entrenchment shows up externally as the #1 DB-Engines database ranking (August 2026, first of 435 systems) and $638B of contracted Remaining Performance Obligations at Q4 FY2026 (press release, June 10, 2026) — a durable, multi-decade lock on mission-critical enterprise data layers.

source: sec.gov

Moat type switching costs

The URD's own durability table assigns a Reference Service Life of 20 years to low-voltage equipment and 15 years to medium-voltage products, and the Group monetizes that installed stock repeatedly: it attributes Field Services growth to an increasing installed base, notably from Data Center, and reports recurring revenue at 79% of its agnostic-software revenues (AVEVA, ETAP, RIB), up 2 points year on year, with AVEVA ARR up +12% as of December 31, 2025.

source: download.schneider-electric.com

switching costs

Stickiness comes from platform embedding, not IP. The 10-K rests differentiation on "our single platform with a unified data model," on "Consolidation of multiple tools into a single platform," and on deployment inside the customer's own perimeter for regulated buyers. Replacement means re-integrating a toolchain and re-certifying compliance. IP is the wrong label: only "16 issued patents and 25 pending patent applications," plus open-source licenses granting "broad permissions to use, copy, modify, and redistribute." The no-lock-in claim is the filing's own characterisation, footnoted to a Forrester study "commissioned by GitLab."

source: sec.gov

switching costs

The core moat is the cost of moving mission-critical databases and back-office suites: the FY2026 10-K notes substantially all license customers attach support contracts and that Oracle's Multicloud Database offerings run Oracle AI Database inside other hyperscalers' clouds — monetizing the installed base even when the customer's infrastructure leaves; the KLAS 2026 EHR report shows the same dynamic in health IT, where roughly a third of Oracle Health customers want to leave but feel unable to do so.

source: sec.gov

Leadership clear leader

The URD's end-market pages report #1 positions in electrical distribution across all four end markets, #1 in grid, #1 in industrial data and safety, and the most complete data-center portfolio including liquid cooling. These are the Group's own stated positions rather than a third-party ranking, and the same document names ABB, Legrand, Siemens, Eaton, Emerson, Honeywell, Johnson Controls, Rockwell Automation, Fuji Electric, Mitsubishi Electric and Yokogawa as the peer panel it is benchmarked against for TSR, a panel its compensation policy characterizes as business competitors.

source: download.schneider-electric.com

fast follower

The 10-K positions GitLab against a leader rather than as one: "Our principal competitor is Microsoft Corporation, which owns GitHub." Competition reads from the challenger side, differentiating "from GitHub through flexible deployment options that work within enterprise security and compliance requirements, LLM neutrality with self-hosted gateway support" and an open core model. On AI it follows: Duo Agent Platform went "Generally available in January 2026," the last month of the fiscal year. What keeps it a follower rather than behind is cadence, "a new version of our software every month for 172 months in a row," plus a regulated-deployment franchise a SaaS-first rival does not cover.

source: sec.gov

co leader

Split by line: clear leader in database (DB-Engines August 2026 ranks Oracle #1 and Oracle-owned MySQL #2 of 435 systems); one of the largest enterprise-application vendors ($15.9B FY2026 SaaS revenue, competing with SAP, Salesforce, Workday and Microsoft per the FY2026 10-K); but in cloud infrastructure a ~4%-share fast-growing challenger behind Amazon (28%), Microsoft (20%) and Google (15%) per Synergy Q2 2026 data (The Register, 2026-08-01), and #2 in US acute-care EHR behind Epic (KLAS 2026).

source: sec.gov

Pricing power moderate

Price is real but has not been covering input costs. FY2025 gross margin fell to 42.1%, down 40bps organic, with the URD stating that accelerating Q4 product pricing was insufficient to fully offset mix and raw-material cost inflation inclusive of tariffs; in the July 30, 2026 half-year release, gross pricing on products of +EUR 280 million was outweighed by a raw-material impact of -EUR 330 million and net tariffs of -EUR 104 million for a net price impact of -EUR 154 million, and the Group says it expects to be net-price positive only in H2 2026.

source: download.schneider-electric.com

moderate

FY2026 gross margin was 87% against 89%, with cost of revenue up $35.6 million "primarily due to an increase of $18.4 million in third party hosting costs for SaaS and cloud usage," and management expects SaaS and Duo mix to bring costs that "may adversely impact our gross margins." Strain is explicit: GitLab "may be required to reduce our prices," competitors "may offer their products and services at a lower price or for free," and it "implemented user limits on our free SaaS product." Power retained: Premium lists at $29 per user/month billed annually, and seats bundle $12 and $24 of GitLab Credits. But "A majority of our subscriptions are on a one-year period."

source: sec.gov

moderate

Strong in the installed base — the FY2026 10-K states substantially all license customers purchase support contracts, a recurring stream customers rarely drop — but the same 10-K lists "total cost of ownership" first among key competitive factors and describes intense competition across every segment; AI-infrastructure deals are won against hyperscalers and neoclouds, and Q4 FY2026 SaaS grew a moderate 10% versus 93% for IaaS (press release, June 10, 2026).

source: sec.gov

Summary

Schneider sells electrification, automation and digitalization into four end markets — Data Center & Networks (30% of 2025 orders), Buildings (29%), Industry (27%) and Infrastructure (14%) — and its 2025 URD claims a #1 position in electrical distribution in every one of them, sold through an ecosystem of panel builders, integrators, distributors and more than 1.4 million contractors and electricians. Energy Management is the larger and higher-margin half: EUR 33,130 million of FY2025 revenue, 83% of the Group, up +10.3% organic at a 21.8% adjusted EBITA margin, against EUR 7,022 million and 14.2% at Industrial Automation. In the July 30, 2026 half-year release the Data Center end-market continues to lead growth: Systems, 35% of Q2 revenues, grew +28% organic with prefabricated solutions, cooling technologies and 3-phase UPS all seeing significant growth.

GitLab sells a single-platform DevSecOps toolchain defended by workflow lock-in rather than intellectual property: a unified data model plus deployment flexibility, including single-tenant "Dedicated for Government with FedRAMP compliance," makes it hard to remove where data residency is contractual. The installed base expands: 118% Dollar-Based Net Retention, 10,682 Base Customers, 1,456 above $100,000 of ARR, 155 above $1.0 million (up 26%), over 70% of ARR from public sector and enterprise. The filing supplies the counterweight: "limited barriers to entry," Microsoft/GitHub as principal competitor, 16 issued patents. Retention (130 to 123 to 118, the 130 a cap), gross margin (89% to 87%) and a January 2026 AI launch point to compression at the commodity end. No source measures market share, so every share band is "unknown".

Oracle pairs the deepest switching-cost franchise in enterprise software — the #1-ranked database (DB-Engines, August 2026) plus Fusion/NetSuite back-office suites, with support attach near-universal per the FY2026 10-K — with a late but explosive push into AI cloud infrastructure: Q4 FY2026 IaaS revenue grew 93% to $5.8B and RPO reached $638B (up 363% YoY), mostly large-scale AI contracts (press release, June 10, 2026). The two reinforce each other via multicloud — Oracle Multicloud AI Database grew 404% in Q4 running inside rival clouds. The offsets: in cloud infrastructure Oracle is still a ~4%-share challenger behind AWS/Microsoft/Google (Synergy Q2 2026 data via The Register), the AI buildout drove FY2026 free cash flow to negative $23.7B, and the Cerner-based Oracle Health business has lost US hospital share for three straight years (KLAS 2026).

Chain position

Supplies the power and cooling layer beneath AI compute: Data Center & Networks was 30% of 2025 orders, a market the URD places on a market CAGR above 10% from 2025 to 2030.

GitLab sits at the software-tooling layer, not compute or models. It consumes third-party LLM capacity — marketing "LLM neutrality and support for self-hosted AI gateways, including air-gapped environments" — so it captures no model-layer economics and bears inference as COGS, visible in the $18.4 million rise in hosting costs. Its distinctive position is the regulated perimeter.

Supply-chain role in AI: OCI sells GPU compute for AI training and inference — the Q4 FY2026 press release attributes most of the $85B sequential RPO increase to large-scale AI contracts (some with customer-prepaid or customer-supplied GPUs totaling $75B) and guides FY2027 total revenue to $90B — making Oracle a primary capacity supplier to AI model builders.

Products (share / barrier)
  • Enterprise Agile Planning add-on Unknown · Low source: sec.gov
  • GitLab Dedicated (including Dedicated for Government) Unknown · Deep source: sec.gov
  • GitLab DevSecOps Platform (Free, Premium, and Ultimate tiers) Unknown · Moderate source: sec.gov
  • GitLab Duo Agent Platform (with GitLab Credits) Unknown · Low source: about.gitlab.com
  • Self-Managed GitLab (on-premises and hybrid cloud deployment) Unknown · Deep source: sec.gov
Long-horizon vote +0.38 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

+0.06 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

+0.30 at weight 0.20 · swarm bullish

Editorial prior, not backtested.

see exactly how it voted →