Skip to content

Compare moats

Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.

comparing TE Connectivity×NVIDIA×Applied Digital× maximum of 3 — remove one to swap
TE Connectivity TEL ai moat: latest change 2025-11-10 NVIDIA NVDA ai moat: latest change 2026-02-25 Applied Digital APLD ai moat: latest change 2026-07-29
Moat rating narrow

The FY2025 10-K's own Competition section undercuts any claim of insulation: 'The industries in which we operate are highly competitive, and we compete with thousands of companies that range from large multinational corporations to local manufacturers', competition is 'generally based on breadth of product offering, product innovation, price, quality, delivery, and service', and TE has 'experienced, and expect[s] to continue to experience, downward pressure on prices'. The same filing explicitly disclaims IP as the basis of its position: 'we do not believe that our competitive position or our operations are dependent upon or would be materially impacted by any single patent or group of related patents.' What TE does hold is durable rather than absolute — it calls itself 'one of the leading providers of advanced automobile connectivity solutions', its Industrial segment 'a leading supplier', and it converted that position into rising profitability across the same filing's three income statements (gross margin 31.5% of net sales in FY2023, 34.4% in FY2024, 35.2% in FY2025). A position that earns expanding margins into admitted price pressure is an advantage; one held against thousands of competitors and no decisive patent is not a wide one.

source: sec.gov

wide

Wide: the CUDA software platform and its developer installed base create high switching costs across the AI-training stack, defended by $76.7B cumulative R&D and reinforced by ~71% FY2026 gross margins and Data Center revenue (~90% of total) up 68% YoY — durable, hard-to-replicate advantages per the FY2026 10-K.

source: sec.gov

none

The FY2026 10-K (filed 2026-07-29) shows contracted revenue, not a demonstrated competitive edge. About 1,410 MW is leased under 15-year take-or-pay, non-cancellable base terms worth about $36.2 billion, but only about 100 MW of the roughly 1.5 GW that is contracted and either operating or under construction was operating and earning revenue at May 31, 2026, and Item 1A says "lessees may have the right to terminate applicable leases if there are significant delays in construction." Item 1A also concedes "We do not have the resources to compete with larger providers of similar products or services at this time," and the Competition section names 13 power-advantaged developers the company competes with. Signed leases give revenue visibility, but the filing does not show a durable advantage.

source: sec.gov

Moat type switching costs

The FY2025 10-K locates the advantage at the customer, not in patents. It describes 'close working relationships with many of our customers' whose 'relationships with them typically date back many years', and co-development as the mechanism: 'By working with our customers in developing new products and technologies, we believe we can identify and act on trends and leverage knowledge about next-generation technology across our products.' Roughly 75% of fiscal 2025 net sales were direct to manufacturers rather than through distribution, and the Transportation segment's products 'must withstand harsh conditions' — parts engineered in with the customer and built to survive the application, so the position sits inside the customer's design rather than in a purchase order. The filing rules the alternative out in its own words on intellectual property, so intangibles_ip is not the source; the 'thousands of companies' in Competition rules out efficient_scale.

source: sec.gov

intangibles ip

The durable edge rests on proprietary IP and software: the full-stack CUDA development platform running on all NVIDIA GPUs plus hundreds of proprietary domain libraries/SDKs/APIs, and $76.7B cumulative R&D yielding "inventions that are essential to modern computing" (NVIDIA invented the GPU in 1999). This is reinforced by developer-ecosystem network effects and CUDA switching costs, per the FY2026 10-K Business section.

source: sec.gov

none

The 10-K claims three advantages: power-advantaged sites (it believes securing power and interconnection ahead of demand is 'the principal constraint on new HPC capacity and a core differentiator for us from many of our competitors'), a standardized 'franchise-style' design, and hyperscaler master service and master telecom service agreements 'that are difficult to obtain.' The filing does not show any of them to be durable. Its Competition section says competition 'centers on securing and developing sites with access to large-scale, reliable, and cost-competitive power and interconnection' and names 13 power-advantaged developers going after the same leases, and Item 1A concedes it lacks the resources to compete with larger providers. Signed leases are take-or-pay and non-cancellable, so a tenant leaving for convenience owes 'the full remaining contractual value,' but that is contractual lock-in on each lease rather than a moat source, so no moat type is assigned.

source: sec.gov

Leadership co leader

The FY2025 10-K claims leadership in qualified form and then names the peers who contest it. Transportation Solutions 'is a leader in connectivity and sensor technologies' and TE is 'one of the leading providers of advanced automobile connectivity solutions' — one of, not the — while the segment's 'major competitors include Yazaki, Aptiv, Sumitomo, Sensata, Honeywell, Molex, and Amphenol'. Industrial Solutions 'is a leading supplier of products that connect and distribute power, data, and signals' and 'competes primarily against Amphenol, Hubbell, Carlisle Companies, Integer Holdings, Molex, Omron, JST, and Korea Electric Terminal (KET)'. Amphenol and Molex appear on both lists, so TE shares the top of the interconnect market rather than owning it.

source: sec.gov

clear leader

FY2026 Data Center revenue was $193.7B (~90% of the $215.9B total), up 68% YoY on the Blackwell ramp, and NVIDIA describes itself as "a data center scale AI infrastructure company reshaping all industries." The 10-K frames named rivals as parties who "provide or intend to provide" GPUs/accelerators — incumbent-leader positioning.

source: sec.gov

behind

The 10-K makes no leadership claim and gives no ranking or share figure. Item 1A concedes "We do not have the resources to compete with larger providers of similar products or services at this time" and that some rivals have "substantially greater liquidity and financial resources than we do." Its Competition section places APLD against established operators (Digital Realty, Equinix), hyperscalers that build their own capacity, independent developers and 13 named power-advantaged developers (IREN, Cipher Digital, TeraWulf, Hut 8, Riot, CleanSpark, HIVE, Core Scientific, Bitdeer, Galaxy Digital, Fermi, Keel Infrastructure, MARA).

source: sec.gov

Pricing power moderate

The FY2025 10-K states both halves plainly: TE has 'experienced, and expect[s] to continue to experience, downward pressure on prices. However, as a result of increased costs and tariffs, certain of our businesses implemented price increases in recent years.' Pass-through, not price-setting. The realised result is margin expansion rather than erosion — gross margin of 31.5% of net sales in FY2023, 34.4% in FY2024 and 35.2% in FY2025 per the same filing's income statements, and 36.5% ($5,319M on $14,573M) for the nine months to 26 June 2026 versus 35.3% a year earlier, with Q3 FY2026 GAAP operating margin of 19%, per the 22 July 2026 results release (https://www.sec.gov/Archives/edgar/data/1385157/000110465926085589/tel-20260722xex99d1.htm). Strong would require pricing that leads rather than follows cost; weak is contradicted by three years of expanding gross margin.

source: sec.gov

strong

FY2026 gross margin was 71.1% (75.0% in FY2025); per the 10-K MD&A the ~3.9pt decline reflects the Hopper HGX→Blackwell full-system mix shift and a one-time $4.5B H20 excess-inventory/purchase-obligation charge, not competitive price erosion. A low-70s% hardware gross margin evidences strong pricing power.

source: sec.gov

weak

Item 1A says "Due to the limited number of hyperscalers, we expect that a limited number of customers will continue to account for a high percentage of our revenue for the foreseeable future," and that if customers' equipment usage declines or they discontinue use of its facilities, APLD "may be compelled to lower our lease prices in some instances or risk losing a significant customer." One customer was 59% of FY2026 revenue from continuing operations. Take-or-pay, non-cancellable terms protect contracted revenue over the base term, and Note 19 reports a $39.1M HPC Hosting segment profit on $385.3M of segment revenue in FY2026, but those terms are agreed with a small group of concentrated buyers.

source: sec.gov

Summary

TE Connectivity sells the connectors, terminals, sensors and cable-protection parts that, in its own framing, 'enable the distribution of power, signal, and data' — a component vendor, never a system or compute vendor. The FY2025 10-K puts the two reportable segments, Transportation Solutions (54% of net sales) and Industrial Solutions (46%), against a combined served market it estimates at roughly $200 billion, which tells you immediately that no single share number governs this business: the filing discloses no market share, says 'no single customer accounted for a significant amount of our net sales in fiscal 2025, 2024, or 2023', and states that because TE is 'not organized by product or service, it is not practicable to disclose net sales by product or service'. The defensible part is entrenchment. Parts get designed in with the customer and then qualified to survive automotive, aerospace, subsea and grid conditions; TE sells about 75% of net sales direct into ~130 countries; relationships 'typically date back many years'. That is a switching-cost moat, and the filing is unusually candid that it is not a patent moat — no single patent or group of patents is material to its competitive position. The limit is equally plain in the filing: highly competitive industries, thousands of competitors, and persistent downward price pressure, with Amphenol and Molex named as competitors in BOTH segments and Yazaki, Aptiv and Sumitomo heading the Transportation segment's competitor list. The evidence that the moat is nonetheless working is margin plus mix. Gross margin ran 31.5% / 34.4% / 35.2% of net sales across FY2023-FY2025, and in the nine months to 26 June 2026 gross margin was $5,319M on $14,573M of net sales (36.5%) against $4,419M on $12,513M (35.3%) a year earlier, while Q3 FY2026 GAAP operating margin was 19% and orders hit a record $5.7 billion, up 27% year over year. Growth has also rotated: digital data networks grew 34.2% in Q3 FY2026 (34.0% organic) and 48.8% over nine months, with the CEO naming 'increased momentum in AI in both the data center and across the broader energy infrastructure' — while sensors, an end market for which the 10-K makes no leadership claim at all, shrank 2.8% organically in the quarter. Narrow, not wide: a real toll on other people's platforms, collected under admitted price pressure.

NVIDIA pairs market-leading accelerated-computing hardware (the Blackwell data-center platform) with a proprietary full-stack software moat — CUDA plus hundreds of domain libraries — funded by $76.7B of cumulative R&D, and its "large and growing number of developers and installed base... strengthens our ecosystem and increases the value of our platform for our customers" (FY2026 10-K). Competition is intensifying from AMD, Intel and Huawei, and from hyperscalers (Alphabet, Amazon, Microsoft) designing internal AI silicon, but rivals must overcome NVIDIA's entrenched CUDA software ecosystem to displace it.

Applied Digital designs, builds and operates purpose-built, liquid-cooled HPC data centers, which it calls 'AI factories', and leases the capacity to CoreWeave and investment-grade hyperscalers. At May 31, 2026 its 10-K lists five campuses (Polaris Forge 1-3 and Delta Forge 1-2) with about 1,410 MW contracted under roughly 15-year take-or-pay, non-cancellable leases worth about $36.2 billion over the base terms. The filing claims three sources of advantage: it controls power-advantaged sites, it uses a standardized 'franchise-style' design built to deliver about 150 MW in about 14 to 18 months, and it holds hyperscaler master agreements that are 'difficult to obtain.' The same document shows how early the company is. About 100 MW was operating and earning revenue. One customer was 59% of FY2026 revenue from continuing operations. It competes with Digital Realty, Equinix, hyperscalers that build their own capacity and 13 named power-advantaged developers, and it concedes that it lacks the resources to compete with larger providers. Signed leases give long-dated revenue visibility, but the filing does not show a durable competitive advantage.

Chain position

TE is an upstream component supplier to the AI build-out, not a participant in compute. It sells 'connectivity and sensor solutions [that] enable the distribution of power, signal, and data to advance next-generation transportation, energy networks, automated factories, data centers enabling artificial intelligence', about 75% of it direct to manufacturers across roughly 130 countries. AI exposure runs through one end market: digital data networks was 28% of Industrial Solutions, and Industrial Solutions was 46% of fiscal 2025 net sales — so the datacenter line is a minority of a company still 54% transportation. That minority is where the growth now is: digital data networks net sales rose 34.2% in Q3 FY2026 and 48.8% over the nine months, and energy rose 34.4% in the quarter, the CEO tying both to AI momentum 'in both the data center and across the broader energy infrastructure' (https://www.sec.gov/Archives/edgar/data/1385157/000110465926085589/tel-20260722xex99d1.htm).

Upstream compute-platform supplier: NVIDIA sells full-stack data-center systems (GPU + Arm CPU + DPU + NVLink/InfiniBand networking + CUDA software) to cloud providers and enterprises, and relies on third-party foundry/assembly-test-packaging partners (e.g., SPIL, Amkor, Wistron, Fabrinet). Per the FY2026 10-K, several of its largest customers (hyperscalers such as Amazon, Alphabet, Microsoft) are simultaneously customers and emerging competitors developing internal accelerated-computing silicon.

Developer and landlord of power-advantaged, liquid-cooled AI data-center capacity, leased long-term to CoreWeave and investment-grade hyperscalers.

Products (share / barrier)
  • CUDA accelerated-computing software platform (CUDA-X, NVIDIA AI Enterprise) Leader · Deep source: sec.gov
  • Data Center AI accelerators (GPU — Blackwell/Hopper) Leader · Deep source: sec.gov
  • Data-center networking / interconnect (NVLink, InfiniBand, Spectrum Ethernet, DPUs) Top 3 · Moderate source: sec.gov
  • Blockchain data center hosting (Jamestown / Ellendale) Niche · Low source: sec.gov
  • HPC data center leasing (Polaris Forge / Delta Forge AI factories) Challenger · Moderate source: sec.gov
Long-horizon vote +0.13 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

+0.42 at weight 0.20 · swarm bullish

Editorial prior, not backtested.

see exactly how it voted →

-0.20 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →