Skip to content

Compare moats

Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.

comparing X-energy×Applied Digital×ASE Technology Holding× maximum of 3 — remove one to swap
X-energy XE ai moat: latest change 2026-08-13 Applied Digital APLD ai moat: latest change 2026-07-29 ASE Technology Holding ASX ai moat: latest change 2026-04-01
Moat rating narrow

Real but unbuilt. The Q2 2026 10-Q shows the moat resting on regulatory standing rather than delivered product: the NRC completed the Environmental Assessment for the Dow Long Mott construction permit application on 18 May 2026 with a Finding of No Significant Impact, yet no Xe-100 has been constructed or operated and two counterparties supplied nearly all income, with the U.S. Government at 90.3% and Dow at 4.4% of total revenue and grant income for the three months ended 30 June 2026.

source: sec.gov

none

The FY2026 10-K (filed 2026-07-29) shows contracted revenue, not a demonstrated competitive edge. About 1,410 MW is leased under 15-year take-or-pay, non-cancellable base terms worth about $36.2 billion, but only about 100 MW of the roughly 1.5 GW that is contracted and either operating or under construction was operating and earning revenue at May 31, 2026, and Item 1A says "lessees may have the right to terminate applicable leases if there are significant delays in construction." Item 1A also concedes "We do not have the resources to compete with larger providers of similar products or services at this time," and the Competition section names 13 power-advantaged developers the company competes with. Signed leases give revenue visibility, but the filing does not show a durable advantage.

source: sec.gov

narrow

The FY2025 20-F argues ASEH out-competes IDM in-house lines because serving "a large base of customers across a wide range of products" lets it "reduce costs and shorten production cycles through high-capacity utilization and process expertise" and gives its equipment "a longer useful life" — a real but bounded edge, since the same filing calls the global packaging and testing market "highly competitive", notes "most of our customers obtain services from more than one source", flags foundry encroachment ("TSMC has offered advanced packaging technologies such as integrated fan-out"), and warns that "some of our competitors may have superior financial, marketing, manufacturing, research and development and technological resources than we do", offering P.R.C. government support of its domestic semiconductor companies as the example.

source: sec.gov

Moat type intangibles ip

The IPO prospectus describes an 'intellectual property-driven business model': revenue is to come from technology fees for licensing the proprietary Xe-100 design plus proprietary TRISO-X fuel, and the company states it will not construct, own or operate the power plants. The durable assets are therefore patents and NRC licences, not plant, installed base or scale.

source: sec.gov

none

The 10-K claims three advantages: power-advantaged sites (it believes securing power and interconnection ahead of demand is 'the principal constraint on new HPC capacity and a core differentiator for us from many of our competitors'), a standardized 'franchise-style' design, and hyperscaler master service and master telecom service agreements 'that are difficult to obtain.' The filing does not show any of them to be durable. Its Competition section says competition 'centers on securing and developing sites with access to large-scale, reliable, and cost-competitive power and interconnection' and names 13 power-advantaged developers going after the same leases, and Item 1A concedes it lacks the resources to compete with larger providers. Signed leases are take-or-pay and non-cancellable, so a tenant leaving for convenience owes 'the full remaining contractual value,' but that is contractual lock-in on each lease rather than a moat source, so no moat type is assigned.

source: sec.gov

cost scale

The advantage the 20-F actually claims is unit economics from volume, not lock-in: specialization and "economies of scale by providing services to a large base of customers", high capacity utilization spreading "relatively high fixed costs", and equipment that lasts longer because of the breadth of the order book. Capital intensity reinforces it — the filing says "semiconductor businesses are capital intensive and require significant investment in expensive equipment manufactured by a limited number of vendors", with the equipment market itself "characterized by intense demand, limited supply, and long delivery cycles".

source: sec.gov

Leadership co leader

The prospectus records X-energy as one of two awardees under the DOE Advanced Reactor Demonstration Program, and it holds the Oak Ridge HALEU fuel-fabrication licence; but it is not the NRC design-approval leader — the NRC issued a standard design approval to NuScale for the US460 small modular reactor, published at 90 FR / Federal Register document 2025-10123 on 4 June 2025, while the Xe-100 is being licensed indirectly through a customer's Part 50 construction permit and holds no design certification or approval of its own.

source: sec.gov

behind

The 10-K makes no leadership claim and gives no ranking or share figure. Item 1A concedes "We do not have the resources to compete with larger providers of similar products or services at this time" and that some rivals have "substantially greater liquidity and financial resources than we do." Its Competition section places APLD against established operators (Digital Realty, Equinix), hyperscalers that build their own capacity, independent developers and 13 named power-advantaged developers (IREN, Cipher Digital, TeraWulf, Hut 8, Riot, CleanSpark, HIVE, Core Scientific, Bitdeer, Galaxy Digital, Fermi, Keel Infrastructure, MARA).

source: sec.gov

co leader

The 20-F calls ASEH "a leading provider of semiconductor manufacturing services in assembly and testing" and "a market leader in SiP technologies from design to assembly with high-volume manufacturing", and says it has "established ourselves as a leader through the successful introduction of leading-edge advanced packaging solutions, which have played a pivotal role in bringing advanced ASIC and HBM products to the marketplace" — but the hedged "we believe we are among the leaders in such packaging processes and technologies", alongside named consolidating rivals (Jiangsu Changjiang Electronics Technology/STATS ChipPAC, Amkor/J-Devices, Tianshui Huatian Technology/Unisem) and TSMC's InFO, describes shared rather than sole leadership.

source: sec.gov

Pricing power weak

Nothing has been priced in a market yet. The prospectus states the Xe-100 technology fee is a benchmarking assumption to be 'negotiated on a case by case basis' with no assurance customers will accept the proposed structure, and that Amazon holds first-priority manufacturing queue slots across 2031-2039, a right of first refusal and most-favoured pricing; the 10-Q records a 2025 warrant issued to a related-party customer with a $162.7 million grant-date fair value accounted for as consideration payable to a customer, i.e. a reduction of the transaction price.

source: sec.gov

weak

Item 1A says "Due to the limited number of hyperscalers, we expect that a limited number of customers will continue to account for a high percentage of our revenue for the foreseeable future," and that if customers' equipment usage declines or they discontinue use of its facilities, APLD "may be compelled to lower our lease prices in some instances or risk losing a significant customer." One customer was 59% of FY2026 revenue from continuing operations. Take-or-pay, non-cancellable terms protect contracted revenue over the base term, and Note 19 reports a $39.1M HPC Hosting segment profit on $385.3M of segment revenue in FY2026, but those terms are agreed with a small group of concentrated buyers.

source: sec.gov

weak

The 20-F states the industry has "a general trend toward declining prices for products and services of a given technology over time" and that ASEH's own "average selling prices of our packaging and testing services have experienced sharp declines" under "intense price competition". FY2025 consolidated gross margin was 17.7% (up from 16.3%), and management attributes the gain to "higher packaging and testing revenue mix and higher factory utilization" rather than price; the EMS half earned a 9.2% gross margin on raw-material costs equal to 78.7% of EMS revenue, and the five largest customers supplied 46.5% of 2025 operating revenues.

source: sec.gov

Summary

X-energy's defensible assets today are regulatory and intellectual, not commercial. NRC Special Nuclear Material Licence SNM-7007, issued 13 February 2026 for a 40-year licence period, authorises HALEU fuel manufacture at Oak Ridge, and the company's own prospectus calls it the first-ever Category II nuclear fuel facility licensed in the United States; the Long Mott construction permit application for four Xe-100 reactors has reached its uncontested mandatory NRC hearing, scheduled for 22 September 2026. Neither has yet produced a reactor or a commercial fuel pebble: the prospectus expects TX-1 to be completed in the first half of 2028, and the 10-Q describes present revenue as derived from cost-share agreements such as the DOE ARDP. The HALEU feedstock the fuel depends on is a live dependency rather than a settled advantage — the prospectus states HALEU enrichment services are available only in limited quantities globally and that customers procure the feedstock, and the 10-Q discloses a definitive enrichment agreement with Centrus Energy announced 6 August 2026 under a phased approach with prepayments by X-energy to support Centrus's domestic capacity programme.

Applied Digital designs, builds and operates purpose-built, liquid-cooled HPC data centers, which it calls 'AI factories', and leases the capacity to CoreWeave and investment-grade hyperscalers. At May 31, 2026 its 10-K lists five campuses (Polaris Forge 1-3 and Delta Forge 1-2) with about 1,410 MW contracted under roughly 15-year take-or-pay, non-cancellable leases worth about $36.2 billion over the base terms. The filing claims three sources of advantage: it controls power-advantaged sites, it uses a standardized 'franchise-style' design built to deliver about 150 MW in about 14 to 18 months, and it holds hyperscaler master agreements that are 'difficult to obtain.' The same document shows how early the company is. About 100 MW was operating and earning revenue. One customer was 59% of FY2026 revenue from continuing operations. It competes with Digital Realty, Equinix, hyperscalers that build their own capacity and 13 named power-advantaged developers, and it concedes that it lacks the resources to compete with larger providers. Signed leases give long-dated revenue visibility, but the filing does not show a durable competitive advantage.

ASEH sells turnkey assembly and test at a scale most captive IDM lines cannot match: the 20-F says it is "involved in all stages of the semiconductor manufacturing process except circuit design and wafer fabrication", and leans on Taiwan, "currently the largest center for outsourced semiconductor manufacturing in the world", plus a "strategic alliance with TSMC", to sit next to the foundries its customers already use. The durable part is cost position from utilization, not customer capture — the filing concedes customers multi-source and that foundries are moving into advanced packaging from above.

Chain position

Upstream supplier of reactor technology and TRISO fuel to industrial-heat and data-centre power buyers; it licenses the design and fabricates the fuel rather than owning or operating the plants.

Developer and landlord of power-advantaged, liquid-cooled AI data-center capacity, leased long-term to CoreWeave and investment-grade hyperscalers.

Back-end contractor to the AI silicon chain: the 20-F ties its FOCoS, FOCoS-Bridge and 2.5D/3D lines to "ASICs and HBM for HPC, networking, server and AI/ML applications" and "AI accelerators for AI training", and warns that a slowdown in AI demand would leave "lower utilization rates for our specialized equipment".

Products (share / barrier)
  • Blockchain data center hosting (Jamestown / Ellendale) Niche · Low source: sec.gov
  • HPC data center leasing (Polaris Forge / Delta Forge AI factories) Challenger · Moderate source: sec.gov
  • Electronic manufacturing services (USI Group) Challenger · Low source: sec.gov
  • Leading-edge advanced packaging (FOCoS, FOCoS-Bridge, 2.5D/3D IC, co-packaged optics) Top 3 · Deep source: sec.gov
  • Semiconductor packaging services Top 3 · Moderate source: sec.gov
  • Semiconductor testing services Top 3 · Moderate source: sec.gov
  • System-in-Package (SiP) and module solutions Leader · Moderate source: sec.gov
Long-horizon vote +0.05 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

-0.20 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

+0.05 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →