Compare moats
Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.
| Adobe | Cipher Mining | Hewlett Packard Enterprise | |
|---|---|---|---|
| Moat rating | narrow The FY2025 10-K's own Competition section says the markets for Adobe's solutions are characterized by 'limited barriers to entry, short product lifecycles, customer price sensitivity ... and the frequent entry of new solutions or competitors', and Item 1A adds that Adobe 'face[s] increasing competition from companies offering generative and agentic AI solutions, including but not limited to prompt-based and multi-modal creation and editing, document productivity and understanding' - the two categories that carry the Digital Media segment. That disclosed contestability caps the moat below wide, while the same filing's industry-standard app designations and 89% consolidated gross margin keep it well above none. | none Cipher (renamed Cipher Digital Inc. on 20 February 2026) holds signed, credit-supported leases but has not yet shown that they amount to a durable advantage. Its 2025 Form 10-K (filed 2026-02-24) says "Through the end of 2025, our revenue has been derived from mining bitcoin". Its Q2 2026 business update (2026-08-04, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/q226_earningsxprxdraftxvf.htm) reported "Q2 2026 Revenue of $25 million", and its first HPC rent began only in August 2026 at Black Pearl. The 10-K's own risk factors describe a contested market. They say "There has been an increasing number of businesses constructing HPC data centers, which has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive", that "our data centers are single-tenant properties", and that lessees "will have the right to terminate the lease if there are significant delays in the completion of construction". At Barber Lake, where the 10-K targeted Phase I delivery "by September 30, 2026", a September 2026 amendment, made "In connection with change orders and the continued evolution of tenant requirements", moved data-hall deliveries to the fourth quarter of 2026 through the first quarter of 2027. Under it, Cipher "will bear the first $359.3 million of costs in excess of the initial budgeted amount" (2026-09-25). There is real counter-evidence: a 15-year Amazon lease, a Google-backstopped Fluidstack lease whose contracted life a "leading AI lab" extended to 20 years, and a third lease with an investment-grade hyperscale tenant. Until that capacity is delivered and paying rent, though, a moat is not shown, so the band is none. | narrow The FY2025 10-K describes strong but bounded advantages. On the positive side it cites ~21,000 issued and pending patents as of October 31, 2025, Hewlett Packard Labs research in AI, networking and fabrics, novel accelerators and quantum computing, a claimed 'long-term sustained market leadership in supercomputing', a global manufacturing services footprint, and a large channel/partner ecosystem. Against that, the filing names a crowded set of large incumbents in every segment (Dell, Super Micro, Cisco, Lenovo in servers; Broadcom, Cisco, Dell, IBM, NetApp, Nutanix, Pure Storage plus AWS/Google Cloud/Azure in hybrid cloud; Cisco, Arista, Nokia, Huawei, Ciena, NVIDIA, Extreme, Palo Alto, Fortinet, Zscaler and others in networking), concedes competition from 'generically branded or white-box manufacturers' in certain regions, states 'we anticipate that we will have to continue to adjust prices on many of our products and services to stay competitive', and adds that 'no single patent is in itself essential to our company as a whole or to any of our business segments'. That is a durable franchise, not a wide one. |
| Moat type | switching costs The 10-K frames Adobe's differentiation as an integrated ecosystem the customer's work lives inside: Creative Cloud Pro subscribers get 'cloud storage to easily sync, access, collaborate and share their work, files and assets', the AI platform offers a choice of models 'without the friction of switching between workflows and platforms', and on the enterprise side 'Our competitive differentiation comes from the increased value we provide customers by integrating the Adobe Experience Platform with our comprehensive set of solutions'. 96% of FY2025 revenue is subscription, with $22.52B of remaining performance obligations, up 13% year over year. | none No moat source is demonstrated yet. Switching costs are the most likely candidate, since the leases are long (15 years at Black Pearl; Barber Lake now a 20-year contracted life) and each site has a single tenant. But the 10-K says tenant guarantees "will only be effective after rent commencement under such leases and are subject to certain limitations", and by August 2026 rent had begun at only one site. The advantages the 10-K claims are the company's own. It speaks of "industry-leading expertise in originating and securing industrial-scale, greenfield data center sites" and of securing West Texas land "on more favorable terms than in more established data center markets". The same document says "there is significant competition for power capacity and energized facilities". Intellectual property is modest: "four granted United States patents and one issued patent in Taiwan". With 66 full-time employees, Cipher has no scale advantage over the competitors it names: CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers. | intangibles ip The filing's own competitive-advantage language is repeated near-verbatim for both the Server and Networking segments: 'our broad end-to-end solutions portfolio, supported by our strong intellectual property portfolio and research and development capabilities, coupled with our global reach and partner ecosystem.' It grounds that in ~21,000 worldwide issued and pending patents, decades of large-scale infrastructure engineering (it names fanless direct liquid cooling as an example), and Hewlett Packard Labs. Switching costs are the natural alternative given GreenLake consumption contracts, but the filing explicitly disclaims lock-in as a strategy: 'the cloud experience should be open and seamless across all our customers' clouds, rather than requiring customers to be locked into a cloud stack.' Accumulated engineering IP and brand, not customer captivity, is the source the document actually asserts. |
| Leadership | clear leader In the segment that is 74% of FY2025 revenue ($17.65B of $23.77B) the 10-K asserts leadership outright: Illustrator 'our industry-standard vector graphics app', After Effects 'our industry-standard motion graphics and visual effects app', Acrobat 'a leading document productivity app', and 'category and brand leadership' in the Competition section. The claim does not extend to the whole company - the same section says the marketing solutions 'face broad competition from large, established enterprise software and cloud companies'. | fast follower No independent share or rank was found. The 10-K names CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers as competitors, along with miners that have "signed leases with hyperscalers and HPC tenants": Hut 8, IREN, TeraWulf, Core Scientific and Applied Digital. Cipher has signed hyperscale-grade tenants (Amazon; Fluidstack with a Google backstop; a third investment-grade hyperscaler) but delivered its first HPC capacity only in August 2026 (Q2 2026 update). That makes it a fast follower. Its self-description as "a leading developer, owner, and operator of industrial-scale data centers" is the company's own claim and is not counted. | co leader The filing claims specific leadership only in narrow places — 'long-term sustained market leadership in supercomputing' and 'AI-native networking leadership' after the Juniper Networks acquisition — while describing every market it serves as 'characterized by strong competition among major corporations with long-established positions and a large number of new and rapidly growing firms.' It names itself alongside, not above, Dell, Super Micro, Cisco and Lenovo in data-center infrastructure and alongside Cisco, Arista, Nokia, Huawei and NVIDIA in networking, and frames AI data-center networking as a market it 'aims to capture' rather than one it holds. One of a handful of scaled incumbents, not the clear leader. |
| Pricing power | strong Per the same 10-K's segment table, Digital Media earned a 95% gross profit margin in FY2025 (96% FY2024, 95% FY2023) and consolidated gross margin held at 88%/89%/89% across FY2023-FY2025 while revenue grew 11% to $23.77B. 96% of revenue is subscription and remaining performance obligations reached $22.52B, up 13%. Item 1A's warning of 'downward pressure on pricing and gross margins' has not shown up in realized margin. | weak The 10-K says competition "has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive". It adds that if customers cut usage "we may be compelled to lower our prices or risk losing a significant customer". At Barber Lake, Cipher agreed to absorb "the first $359.3 million of costs in excess of the initial budgeted amount", with the tenant reimbursing "50% of any such costs above that amount" (2026-09-25, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000043/barberlakeleaseamendmentpr.htm). Its one input-cost edge is specific to mining: Odessa's power costs about 2.8 c/kWh under the Luminant contract, available "until at least July 2027". A landlord that concedes cost overruns to its tenants has weak pricing power. | weak The 10-K is unusually explicit on this. It states 'We face aggressive price competition'; that competitors with a greater presence in lower-cost markets or better component allocation 'may be able to offer lower prices than we are able to offer'; that 'to maintain our competitive position, from time-to-time we take pricing actions to offer heavier than normal discounts or elect not to pass on cost increases to customers ... which has had and could have a negative impact on our financial results'; and that 'we anticipate that we will have to continue to adjust prices on many of our products and services to stay competitive.' Its AI-systems orders are called out as 'generally subject to intense competition and pricing pressure, which can have an impact on our margins', and a separate risk factor warns that failure to sustain gross margins would reduce profitability. The filing states no gross-margin trend figure in these sections; the qualitative direction it does state is defensive. |
| Summary | Adobe's durable advantage is the cost of leaving rather than any disclosed market share. Its FY2025 10-K calls Illustrator 'our industry-standard vector graphics app' and After Effects 'our industry-standard motion graphics and visual effects app', describes Acrobat as 'a leading document productivity app', and sells them as one subscription ecosystem where assets, workflows and collaboration are cloud-resident. The economics follow: Digital Media earned a 95% gross profit margin on $17.65B of FY2025 revenue, 74% of the company. The same filing is unusually candid about the limits, calling its markets characterized by 'limited barriers to entry' and warning that competition will 'continue to intensify' with named generative and agentic AI entrants in both creation and document productivity - so the moat reads narrow rather than wide, held today by realized pricing and switching costs rather than by structural protection. | Cipher built bitcoin mining data centres in Texas and is now developing single-tenant AI and HPC campuses for lease to hyperscalers. Its 10-K reports a portfolio of "4.2 gigawatts ("GW") of capacity across 10 sites". It lists a 15-year Amazon Web Services lease for about 300 MW of turnkey capacity at Black Pearl and a Fluidstack lease at Barber Lake (300 MW gross) under which Google "has agreed to backstop certain obligations of Fluidstack". It describes bitcoin mining at Odessa on a Luminant power contract at about 2.8 c/kWh. In 2026 it signed a third campus lease "with an investment-grade Hyperscale tenant" (Q1 2026 update, 2026-05-05), delivered first Black Pearl capacity in August "two months ahead of the original schedule" with rent commenced, and fully funded its Stingray development with a bond (Q2 2026 update). On 2026-09-25 it said Barber Lake's contracted life was extended from 10 to 20 years, taking contracted revenue at the site "from $3.8 billion to over $9 billion". The 10-K says Odessa was "the first bitcoin mining data center awarded the Management and Operations, or M&O, Stamp of Approval award from the Uptime Institute", which is independent recognition of how the company operates. Against this, the latest quarter's revenue was still bitcoin mining and fell to $25 million. The 10-K describes growing "competition and pricing pressure", single-tenant concentration, and termination rights for construction delays. The Barber Lake schedule was reset, and Cipher absorbs the first $359.3 million of cost overruns. Cipher's contracted pipeline is substantial, but a competitive advantage is not yet demonstrated, so it is rated as having no moat. That could change to narrow once its leased campuses are delivered and paying rent. | HPE's FY2025 10-K positions the company around three stated megatrends — networking, cloud and AI — delivered through five segments (Server, Hybrid Cloud, Networking, Financial Services, Corporate Investments and Other), with Server products and Networking products each exceeding 10% of consolidated net revenue in fiscal 2025. Its defensibility rests on an accumulated intellectual-property and engineering base (~21,000 issued and pending patents as of October 31, 2025), a claimed sustained leadership position in supercomputing via HPE Cray EX, a full networking stack acquired with Juniper Networks in July 2025 spanning campus, data-center switching, WAN routing and SASE, and a captive Financial Services arm that funds consumption-based deployments. The same filing bounds that moat: it warns of 'aggressive price competition', notes that AI systems have historically been bought 'primarily by a small number of larger customers and cloud service providers' and that such orders are 'generally subject to intense competition and pricing pressure, which can have an impact on our margins', and lists a long roster of well-capitalized competitors in every market it serves. |
| Chain position | An AI-application layer company that both builds its own commercially safe Firefly foundation models and licenses 'an extensive ecosystem of third-party models', distributing generative AI into creative, document and marketing workflows. | Cipher develops single-tenant, powered data-centre campuses for hyperscale and AI tenants: Amazon at Black Pearl, Fluidstack (backstopped by Google) at Barber Lake, and an unnamed investment-grade hyperscaler at a third campus. Meanwhile it winds down bitcoin mining. | Downstream AI-infrastructure integrator and networking supplier: HPE assembles and sells the AI servers and rack-scale systems (ProLiant, Cray EX/XD), turnkey AI-factory stacks (HPE Private Cloud AI) and the data-center/AI networking fabric that sit between silicon vendors and enterprise, sovereign and cloud-service-provider buyers. The AI exposure is central rather than incidental — the filing's strategy section, a dedicated AI risk factor and the AI-systems order-concentration disclosure all address it — but HPE is a buyer of accelerators and components, not a designer of them, and it names NVIDIA as a competitor in networking rather than only as a supplier. |
| Products (share / barrier) |
|
|
|
| Long-horizon vote | +0.24 at weight 0.20 · swarm neutral Editorial prior, not backtested. | -0.06 at weight 0.20 · swarm bearish Editorial prior, not backtested. | +0.05 at weight 0.20 · swarm neutral Editorial prior, not backtested. |