Compare moats
Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.
| Applied Digital | Cipher Mining | GitLab | |
|---|---|---|---|
| Moat rating | none The FY2026 10-K (filed 2026-07-29) shows contracted revenue, not a demonstrated competitive edge. About 1,410 MW is leased under 15-year take-or-pay, non-cancellable base terms worth about $36.2 billion, but only about 100 MW of the roughly 1.5 GW that is contracted and either operating or under construction was operating and earning revenue at May 31, 2026, and Item 1A says "lessees may have the right to terminate applicable leases if there are significant delays in construction." Item 1A also concedes "We do not have the resources to compete with larger providers of similar products or services at this time," and the Competition section names 13 power-advantaged developers the company competes with. Signed leases give revenue visibility, but the filing does not show a durable advantage. | none Cipher (renamed Cipher Digital Inc. on 20 February 2026) holds signed, credit-supported leases but has not yet shown that they amount to a durable advantage. Its 2025 Form 10-K (filed 2026-02-24) says "Through the end of 2025, our revenue has been derived from mining bitcoin". Its Q2 2026 business update (2026-08-04, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/q226_earningsxprxdraftxvf.htm) reported "Q2 2026 Revenue of $25 million", and its first HPC rent began only in August 2026 at Black Pearl. The 10-K's own risk factors describe a contested market. They say "There has been an increasing number of businesses constructing HPC data centers, which has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive", that "our data centers are single-tenant properties", and that lessees "will have the right to terminate the lease if there are significant delays in the completion of construction". At Barber Lake, where the 10-K targeted Phase I delivery "by September 30, 2026", a September 2026 amendment, made "In connection with change orders and the continued evolution of tenant requirements", moved data-hall deliveries to the fourth quarter of 2026 through the first quarter of 2027. Under it, Cipher "will bear the first $359.3 million of costs in excess of the initial budgeted amount" (2026-09-25). There is real counter-evidence: a 15-year Amazon lease, a Google-backstopped Fluidstack lease whose contracted life a "leading AI lab" extended to 20 years, and a third lease with an investment-grade hyperscale tenant. Until that capacity is delivered and paying rent, though, a moat is not shown, so the band is none. | narrow The FY2026 10-K (year ended 2026-01-31) shows real expansion inside the installed base: 118% Dollar-Based Net Retention, Base Customers up to 10,682 from 9,893, customers above $100,000 of ARR up to 1,456 from 1,229, and $1.0 million ARR customers "to 155 from 123, an increase of 26%". But the filing concedes "limited barriers to entry" and names "Microsoft Corporation, which owns GitHub" as principal competitor. Retention decelerates (130% FY2024, 123% FY2025, 118% FY2026), and since DBNR is reported "on a threshold basis of 130%," the FY2024 figure is a cap and the slide is steeper than it looks. Narrow, not wide: expansion must be re-won against a bundled hyperscaler. |
| Moat type | none The 10-K claims three advantages: power-advantaged sites (it believes securing power and interconnection ahead of demand is 'the principal constraint on new HPC capacity and a core differentiator for us from many of our competitors'), a standardized 'franchise-style' design, and hyperscaler master service and master telecom service agreements 'that are difficult to obtain.' The filing does not show any of them to be durable. Its Competition section says competition 'centers on securing and developing sites with access to large-scale, reliable, and cost-competitive power and interconnection' and names 13 power-advantaged developers going after the same leases, and Item 1A concedes it lacks the resources to compete with larger providers. Signed leases are take-or-pay and non-cancellable, so a tenant leaving for convenience owes 'the full remaining contractual value,' but that is contractual lock-in on each lease rather than a moat source, so no moat type is assigned. | none No moat source is demonstrated yet. Switching costs are the most likely candidate, since the leases are long (15 years at Black Pearl; Barber Lake now a 20-year contracted life) and each site has a single tenant. But the 10-K says tenant guarantees "will only be effective after rent commencement under such leases and are subject to certain limitations", and by August 2026 rent had begun at only one site. The advantages the 10-K claims are the company's own. It speaks of "industry-leading expertise in originating and securing industrial-scale, greenfield data center sites" and of securing West Texas land "on more favorable terms than in more established data center markets". The same document says "there is significant competition for power capacity and energized facilities". Intellectual property is modest: "four granted United States patents and one issued patent in Taiwan". With 66 full-time employees, Cipher has no scale advantage over the competitors it names: CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers. | switching costs Stickiness comes from platform embedding, not IP. The 10-K rests differentiation on "our single platform with a unified data model," on "Consolidation of multiple tools into a single platform," and on deployment inside the customer's own perimeter for regulated buyers. Replacement means re-integrating a toolchain and re-certifying compliance. IP is the wrong label: only "16 issued patents and 25 pending patent applications," plus open-source licenses granting "broad permissions to use, copy, modify, and redistribute." The no-lock-in claim is the filing's own characterisation, footnoted to a Forrester study "commissioned by GitLab." |
| Leadership | behind The 10-K makes no leadership claim and gives no ranking or share figure. Item 1A concedes "We do not have the resources to compete with larger providers of similar products or services at this time" and that some rivals have "substantially greater liquidity and financial resources than we do." Its Competition section places APLD against established operators (Digital Realty, Equinix), hyperscalers that build their own capacity, independent developers and 13 named power-advantaged developers (IREN, Cipher Digital, TeraWulf, Hut 8, Riot, CleanSpark, HIVE, Core Scientific, Bitdeer, Galaxy Digital, Fermi, Keel Infrastructure, MARA). | fast follower No independent share or rank was found. The 10-K names CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers as competitors, along with miners that have "signed leases with hyperscalers and HPC tenants": Hut 8, IREN, TeraWulf, Core Scientific and Applied Digital. Cipher has signed hyperscale-grade tenants (Amazon; Fluidstack with a Google backstop; a third investment-grade hyperscaler) but delivered its first HPC capacity only in August 2026 (Q2 2026 update). That makes it a fast follower. Its self-description as "a leading developer, owner, and operator of industrial-scale data centers" is the company's own claim and is not counted. | fast follower The 10-K positions GitLab against a leader rather than as one: "Our principal competitor is Microsoft Corporation, which owns GitHub." Competition reads from the challenger side, differentiating "from GitHub through flexible deployment options that work within enterprise security and compliance requirements, LLM neutrality with self-hosted gateway support" and an open core model. On AI it follows: Duo Agent Platform went "Generally available in January 2026," the last month of the fiscal year. What keeps it a follower rather than behind is cadence, "a new version of our software every month for 172 months in a row," plus a regulated-deployment franchise a SaaS-first rival does not cover. |
| Pricing power | weak Item 1A says "Due to the limited number of hyperscalers, we expect that a limited number of customers will continue to account for a high percentage of our revenue for the foreseeable future," and that if customers' equipment usage declines or they discontinue use of its facilities, APLD "may be compelled to lower our lease prices in some instances or risk losing a significant customer." One customer was 59% of FY2026 revenue from continuing operations. Take-or-pay, non-cancellable terms protect contracted revenue over the base term, and Note 19 reports a $39.1M HPC Hosting segment profit on $385.3M of segment revenue in FY2026, but those terms are agreed with a small group of concentrated buyers. | weak The 10-K says competition "has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive". It adds that if customers cut usage "we may be compelled to lower our prices or risk losing a significant customer". At Barber Lake, Cipher agreed to absorb "the first $359.3 million of costs in excess of the initial budgeted amount", with the tenant reimbursing "50% of any such costs above that amount" (2026-09-25, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000043/barberlakeleaseamendmentpr.htm). Its one input-cost edge is specific to mining: Odessa's power costs about 2.8 c/kWh under the Luminant contract, available "until at least July 2027". A landlord that concedes cost overruns to its tenants has weak pricing power. | moderate FY2026 gross margin was 87% against 89%, with cost of revenue up $35.6 million "primarily due to an increase of $18.4 million in third party hosting costs for SaaS and cloud usage," and management expects SaaS and Duo mix to bring costs that "may adversely impact our gross margins." Strain is explicit: GitLab "may be required to reduce our prices," competitors "may offer their products and services at a lower price or for free," and it "implemented user limits on our free SaaS product." Power retained: Premium lists at $29 per user/month billed annually, and seats bundle $12 and $24 of GitLab Credits. But "A majority of our subscriptions are on a one-year period." |
| Summary | Applied Digital designs, builds and operates purpose-built, liquid-cooled HPC data centers, which it calls 'AI factories', and leases the capacity to CoreWeave and investment-grade hyperscalers. At May 31, 2026 its 10-K lists five campuses (Polaris Forge 1-3 and Delta Forge 1-2) with about 1,410 MW contracted under roughly 15-year take-or-pay, non-cancellable leases worth about $36.2 billion over the base terms. The filing claims three sources of advantage: it controls power-advantaged sites, it uses a standardized 'franchise-style' design built to deliver about 150 MW in about 14 to 18 months, and it holds hyperscaler master agreements that are 'difficult to obtain.' The same document shows how early the company is. About 100 MW was operating and earning revenue. One customer was 59% of FY2026 revenue from continuing operations. It competes with Digital Realty, Equinix, hyperscalers that build their own capacity and 13 named power-advantaged developers, and it concedes that it lacks the resources to compete with larger providers. Signed leases give long-dated revenue visibility, but the filing does not show a durable competitive advantage. | Cipher built bitcoin mining data centres in Texas and is now developing single-tenant AI and HPC campuses for lease to hyperscalers. Its 10-K reports a portfolio of "4.2 gigawatts ("GW") of capacity across 10 sites". It lists a 15-year Amazon Web Services lease for about 300 MW of turnkey capacity at Black Pearl and a Fluidstack lease at Barber Lake (300 MW gross) under which Google "has agreed to backstop certain obligations of Fluidstack". It describes bitcoin mining at Odessa on a Luminant power contract at about 2.8 c/kWh. In 2026 it signed a third campus lease "with an investment-grade Hyperscale tenant" (Q1 2026 update, 2026-05-05), delivered first Black Pearl capacity in August "two months ahead of the original schedule" with rent commenced, and fully funded its Stingray development with a bond (Q2 2026 update). On 2026-09-25 it said Barber Lake's contracted life was extended from 10 to 20 years, taking contracted revenue at the site "from $3.8 billion to over $9 billion". The 10-K says Odessa was "the first bitcoin mining data center awarded the Management and Operations, or M&O, Stamp of Approval award from the Uptime Institute", which is independent recognition of how the company operates. Against this, the latest quarter's revenue was still bitcoin mining and fell to $25 million. The 10-K describes growing "competition and pricing pressure", single-tenant concentration, and termination rights for construction delays. The Barber Lake schedule was reset, and Cipher absorbs the first $359.3 million of cost overruns. Cipher's contracted pipeline is substantial, but a competitive advantage is not yet demonstrated, so it is rated as having no moat. That could change to narrow once its leased campuses are delivered and paying rent. | GitLab sells a single-platform DevSecOps toolchain defended by workflow lock-in rather than intellectual property: a unified data model plus deployment flexibility, including single-tenant "Dedicated for Government with FedRAMP compliance," makes it hard to remove where data residency is contractual. The installed base expands: 118% Dollar-Based Net Retention, 10,682 Base Customers, 1,456 above $100,000 of ARR, 155 above $1.0 million (up 26%), over 70% of ARR from public sector and enterprise. The filing supplies the counterweight: "limited barriers to entry," Microsoft/GitHub as principal competitor, 16 issued patents. Retention (130 to 123 to 118, the 130 a cap), gross margin (89% to 87%) and a January 2026 AI launch point to compression at the commodity end. No source measures market share, so every share band is "unknown". |
| Chain position | Developer and landlord of power-advantaged, liquid-cooled AI data-center capacity, leased long-term to CoreWeave and investment-grade hyperscalers. | Cipher develops single-tenant, powered data-centre campuses for hyperscale and AI tenants: Amazon at Black Pearl, Fluidstack (backstopped by Google) at Barber Lake, and an unnamed investment-grade hyperscaler at a third campus. Meanwhile it winds down bitcoin mining. | GitLab sits at the software-tooling layer, not compute or models. It consumes third-party LLM capacity — marketing "LLM neutrality and support for self-hosted AI gateways, including air-gapped environments" — so it captures no model-layer economics and bears inference as COGS, visible in the $18.4 million rise in hosting costs. Its distinctive position is the regulated perimeter. |
| Products (share / barrier) |
|
|
|
| Long-horizon vote | -0.20 at weight 0.20 · swarm neutral Editorial prior, not backtested. | -0.06 at weight 0.20 · swarm bearish Editorial prior, not backtested. | +0.06 at weight 0.20 · swarm neutral Editorial prior, not backtested. |