Skip to content

Compare moats

Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.

comparing Applied Digital×GitLab×Oracle× maximum of 3 — remove one to swap
Applied Digital APLD ai moat: latest change 2026-07-29 GitLab GTLB ai moat: latest change 2026-08-05 Oracle ORCL ai moat: latest change 2026-06-22
Moat rating none

The FY2026 10-K (filed 2026-07-29) shows contracted revenue, not a demonstrated competitive edge. About 1,410 MW is leased under 15-year take-or-pay, non-cancellable base terms worth about $36.2 billion, but only about 100 MW of the roughly 1.5 GW that is contracted and either operating or under construction was operating and earning revenue at May 31, 2026, and Item 1A says "lessees may have the right to terminate applicable leases if there are significant delays in construction." Item 1A also concedes "We do not have the resources to compete with larger providers of similar products or services at this time," and the Competition section names 13 power-advantaged developers the company competes with. Signed leases give revenue visibility, but the filing does not show a durable advantage.

source: sec.gov

narrow

The FY2026 10-K (year ended 2026-01-31) shows real expansion inside the installed base: 118% Dollar-Based Net Retention, Base Customers up to 10,682 from 9,893, customers above $100,000 of ARR up to 1,456 from 1,229, and $1.0 million ARR customers "to 155 from 123, an increase of 26%". But the filing concedes "limited barriers to entry" and names "Microsoft Corporation, which owns GitHub" as principal competitor. Retention decelerates (130% FY2024, 123% FY2025, 118% FY2026), and since DBNR is reported "on a threshold basis of 130%," the FY2024 figure is a cap and the slide is steeper than it looks. Narrow, not wide: expansion must be re-won against a bundled hyperscaler.

source: sec.gov

wide

Oracle's FY2026 10-K (fiscal year ended May 31, 2026) describes an installed base in which "substantially all customers opt to purchase software support contracts when they purchase an Oracle software license"; that entrenchment shows up externally as the #1 DB-Engines database ranking (August 2026, first of 435 systems) and $638B of contracted Remaining Performance Obligations at Q4 FY2026 (press release, June 10, 2026) — a durable, multi-decade lock on mission-critical enterprise data layers.

source: sec.gov

Moat type none

The 10-K claims three advantages: power-advantaged sites (it believes securing power and interconnection ahead of demand is 'the principal constraint on new HPC capacity and a core differentiator for us from many of our competitors'), a standardized 'franchise-style' design, and hyperscaler master service and master telecom service agreements 'that are difficult to obtain.' The filing does not show any of them to be durable. Its Competition section says competition 'centers on securing and developing sites with access to large-scale, reliable, and cost-competitive power and interconnection' and names 13 power-advantaged developers going after the same leases, and Item 1A concedes it lacks the resources to compete with larger providers. Signed leases are take-or-pay and non-cancellable, so a tenant leaving for convenience owes 'the full remaining contractual value,' but that is contractual lock-in on each lease rather than a moat source, so no moat type is assigned.

source: sec.gov

switching costs

Stickiness comes from platform embedding, not IP. The 10-K rests differentiation on "our single platform with a unified data model," on "Consolidation of multiple tools into a single platform," and on deployment inside the customer's own perimeter for regulated buyers. Replacement means re-integrating a toolchain and re-certifying compliance. IP is the wrong label: only "16 issued patents and 25 pending patent applications," plus open-source licenses granting "broad permissions to use, copy, modify, and redistribute." The no-lock-in claim is the filing's own characterisation, footnoted to a Forrester study "commissioned by GitLab."

source: sec.gov

switching costs

The core moat is the cost of moving mission-critical databases and back-office suites: the FY2026 10-K notes substantially all license customers attach support contracts and that Oracle's Multicloud Database offerings run Oracle AI Database inside other hyperscalers' clouds — monetizing the installed base even when the customer's infrastructure leaves; the KLAS 2026 EHR report shows the same dynamic in health IT, where roughly a third of Oracle Health customers want to leave but feel unable to do so.

source: sec.gov

Leadership behind

The 10-K makes no leadership claim and gives no ranking or share figure. Item 1A concedes "We do not have the resources to compete with larger providers of similar products or services at this time" and that some rivals have "substantially greater liquidity and financial resources than we do." Its Competition section places APLD against established operators (Digital Realty, Equinix), hyperscalers that build their own capacity, independent developers and 13 named power-advantaged developers (IREN, Cipher Digital, TeraWulf, Hut 8, Riot, CleanSpark, HIVE, Core Scientific, Bitdeer, Galaxy Digital, Fermi, Keel Infrastructure, MARA).

source: sec.gov

fast follower

The 10-K positions GitLab against a leader rather than as one: "Our principal competitor is Microsoft Corporation, which owns GitHub." Competition reads from the challenger side, differentiating "from GitHub through flexible deployment options that work within enterprise security and compliance requirements, LLM neutrality with self-hosted gateway support" and an open core model. On AI it follows: Duo Agent Platform went "Generally available in January 2026," the last month of the fiscal year. What keeps it a follower rather than behind is cadence, "a new version of our software every month for 172 months in a row," plus a regulated-deployment franchise a SaaS-first rival does not cover.

source: sec.gov

co leader

Split by line: clear leader in database (DB-Engines August 2026 ranks Oracle #1 and Oracle-owned MySQL #2 of 435 systems); one of the largest enterprise-application vendors ($15.9B FY2026 SaaS revenue, competing with SAP, Salesforce, Workday and Microsoft per the FY2026 10-K); but in cloud infrastructure a ~4%-share fast-growing challenger behind Amazon (28%), Microsoft (20%) and Google (15%) per Synergy Q2 2026 data (The Register, 2026-08-01), and #2 in US acute-care EHR behind Epic (KLAS 2026).

source: sec.gov

Pricing power weak

Item 1A says "Due to the limited number of hyperscalers, we expect that a limited number of customers will continue to account for a high percentage of our revenue for the foreseeable future," and that if customers' equipment usage declines or they discontinue use of its facilities, APLD "may be compelled to lower our lease prices in some instances or risk losing a significant customer." One customer was 59% of FY2026 revenue from continuing operations. Take-or-pay, non-cancellable terms protect contracted revenue over the base term, and Note 19 reports a $39.1M HPC Hosting segment profit on $385.3M of segment revenue in FY2026, but those terms are agreed with a small group of concentrated buyers.

source: sec.gov

moderate

FY2026 gross margin was 87% against 89%, with cost of revenue up $35.6 million "primarily due to an increase of $18.4 million in third party hosting costs for SaaS and cloud usage," and management expects SaaS and Duo mix to bring costs that "may adversely impact our gross margins." Strain is explicit: GitLab "may be required to reduce our prices," competitors "may offer their products and services at a lower price or for free," and it "implemented user limits on our free SaaS product." Power retained: Premium lists at $29 per user/month billed annually, and seats bundle $12 and $24 of GitLab Credits. But "A majority of our subscriptions are on a one-year period."

source: sec.gov

moderate

Strong in the installed base — the FY2026 10-K states substantially all license customers purchase support contracts, a recurring stream customers rarely drop — but the same 10-K lists "total cost of ownership" first among key competitive factors and describes intense competition across every segment; AI-infrastructure deals are won against hyperscalers and neoclouds, and Q4 FY2026 SaaS grew a moderate 10% versus 93% for IaaS (press release, June 10, 2026).

source: sec.gov

Summary

Applied Digital designs, builds and operates purpose-built, liquid-cooled HPC data centers, which it calls 'AI factories', and leases the capacity to CoreWeave and investment-grade hyperscalers. At May 31, 2026 its 10-K lists five campuses (Polaris Forge 1-3 and Delta Forge 1-2) with about 1,410 MW contracted under roughly 15-year take-or-pay, non-cancellable leases worth about $36.2 billion over the base terms. The filing claims three sources of advantage: it controls power-advantaged sites, it uses a standardized 'franchise-style' design built to deliver about 150 MW in about 14 to 18 months, and it holds hyperscaler master agreements that are 'difficult to obtain.' The same document shows how early the company is. About 100 MW was operating and earning revenue. One customer was 59% of FY2026 revenue from continuing operations. It competes with Digital Realty, Equinix, hyperscalers that build their own capacity and 13 named power-advantaged developers, and it concedes that it lacks the resources to compete with larger providers. Signed leases give long-dated revenue visibility, but the filing does not show a durable competitive advantage.

GitLab sells a single-platform DevSecOps toolchain defended by workflow lock-in rather than intellectual property: a unified data model plus deployment flexibility, including single-tenant "Dedicated for Government with FedRAMP compliance," makes it hard to remove where data residency is contractual. The installed base expands: 118% Dollar-Based Net Retention, 10,682 Base Customers, 1,456 above $100,000 of ARR, 155 above $1.0 million (up 26%), over 70% of ARR from public sector and enterprise. The filing supplies the counterweight: "limited barriers to entry," Microsoft/GitHub as principal competitor, 16 issued patents. Retention (130 to 123 to 118, the 130 a cap), gross margin (89% to 87%) and a January 2026 AI launch point to compression at the commodity end. No source measures market share, so every share band is "unknown".

Oracle pairs the deepest switching-cost franchise in enterprise software — the #1-ranked database (DB-Engines, August 2026) plus Fusion/NetSuite back-office suites, with support attach near-universal per the FY2026 10-K — with a late but explosive push into AI cloud infrastructure: Q4 FY2026 IaaS revenue grew 93% to $5.8B and RPO reached $638B (up 363% YoY), mostly large-scale AI contracts (press release, June 10, 2026). The two reinforce each other via multicloud — Oracle Multicloud AI Database grew 404% in Q4 running inside rival clouds. The offsets: in cloud infrastructure Oracle is still a ~4%-share challenger behind AWS/Microsoft/Google (Synergy Q2 2026 data via The Register), the AI buildout drove FY2026 free cash flow to negative $23.7B, and the Cerner-based Oracle Health business has lost US hospital share for three straight years (KLAS 2026).

Chain position

Developer and landlord of power-advantaged, liquid-cooled AI data-center capacity, leased long-term to CoreWeave and investment-grade hyperscalers.

GitLab sits at the software-tooling layer, not compute or models. It consumes third-party LLM capacity — marketing "LLM neutrality and support for self-hosted AI gateways, including air-gapped environments" — so it captures no model-layer economics and bears inference as COGS, visible in the $18.4 million rise in hosting costs. Its distinctive position is the regulated perimeter.

Supply-chain role in AI: OCI sells GPU compute for AI training and inference — the Q4 FY2026 press release attributes most of the $85B sequential RPO increase to large-scale AI contracts (some with customer-prepaid or customer-supplied GPUs totaling $75B) and guides FY2027 total revenue to $90B — making Oracle a primary capacity supplier to AI model builders.

Products (share / barrier)
  • Blockchain data center hosting (Jamestown / Ellendale) Niche · Low source: sec.gov
  • HPC data center leasing (Polaris Forge / Delta Forge AI factories) Challenger · Moderate source: sec.gov
  • Enterprise Agile Planning add-on Unknown · Low source: sec.gov
  • GitLab Dedicated (including Dedicated for Government) Unknown · Deep source: sec.gov
  • GitLab DevSecOps Platform (Free, Premium, and Ultimate tiers) Unknown · Moderate source: sec.gov
  • GitLab Duo Agent Platform (with GitLab Credits) Unknown · Low source: about.gitlab.com
  • Self-Managed GitLab (on-premises and hybrid cloud deployment) Unknown · Deep source: sec.gov
Long-horizon vote -0.20 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

+0.06 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

+0.30 at weight 0.20 · swarm bullish

Editorial prior, not backtested.

see exactly how it voted →