Skip to content

Compare moats

Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.

comparing Applied Digital×Vistra×MongoDB× maximum of 3 — remove one to swap
Applied Digital APLD ai moat: latest change 2026-07-29 Vistra VST ai moat: latest change 2026-08-06 MongoDB MDB ai moat: latest change 2026-03-11
Moat rating none

The FY2026 10-K (filed 2026-07-29) shows contracted revenue, not a demonstrated competitive edge. About 1,410 MW is leased under 15-year take-or-pay, non-cancellable base terms worth about $36.2 billion, but only about 100 MW of the roughly 1.5 GW that is contracted and either operating or under construction was operating and earning revenue at May 31, 2026, and Item 1A says "lessees may have the right to terminate applicable leases if there are significant delays in construction." Item 1A also concedes "We do not have the resources to compete with larger providers of similar products or services at this time," and the Competition section names 13 power-advantaged developers the company competes with. Signed leases give revenue visibility, but the filing does not show a durable advantage.

source: sec.gov

narrow

The 10-K states that "the majority of our facilities operate as “merchant” facilities without long-term power sales agreements" and that Vistra is "not guaranteed any rate of return on our capital investments". Against that, the scarcity is real: six NRC-licensed nuclear units totalling 6,448 MW, licences running 2036-2053, inside a 43,641 MW fleet, plus 20-year PPAs with AWS (1,200 MW) and Meta (2,609 MW). The 2025 gas additions - Lotus (2,600 MW, closed October 2025) and pending Cogentrix (5,500 MW) - extend the merchant gas side, not the nuclear scarcity. Only the 433 MW of uprates extends the moat asset.

source: sec.gov

narrow

The FY2026 10-K frames a 'rapidly evolving and highly competitive' database market where the principal rivals — 'legacy database providers and large cloud providers' — hold explicit advantages: 'longer operating histories, more established relationships … significantly greater financial, technical, marketing or other resources … broader global distribution,' and can offer competing products 'at a low cost or no cost.' A developer-mindshare and switching-cost position is defensible but not wide against that field.

source: sec.gov

Moat type none

The 10-K claims three advantages: power-advantaged sites (it believes securing power and interconnection ahead of demand is 'the principal constraint on new HPC capacity and a core differentiator for us from many of our competitors'), a standardized 'franchise-style' design, and hyperscaler master service and master telecom service agreements 'that are difficult to obtain.' The filing does not show any of them to be durable. Its Competition section says competition 'centers on securing and developing sites with access to large-scale, reliable, and cost-competitive power and interconnection' and names 13 power-advantaged developers going after the same leases, and Item 1A concedes it lacks the resources to compete with larger providers. Signed leases are take-or-pay and non-cancellable, so a tenant leaving for convenience owes 'the full remaining contractual value,' but that is contractual lock-in on each lease rather than a moat source, so no moat type is assigned.

source: sec.gov

intangibles ip

The intangibles are non-replicable regulatory assets rather than patents: six nuclear licences (Comanche Peak 2050/2053, Perry 2046, Davis-Besse 2037, Beaver Valley 2036/2047), fuel "contracted to support all our refueling needs through 2030", section 45U credits "recognizing the value of existing carbon-free nuclear power", and TXU Energy, sold "for over 20 years" and "registered and protected by trademark law". Read 45U as a floor, not moat strength: the 2025 credit was $220m against $545m in 2024, and it "provides increasing levels of support as unit revenues decline". Efficient scale does not apply.

source: sec.gov

switching costs

A database is the system an application is built on: the 10-K states 'a database directly impacts an application's performance, scalability, flexibility and reliability,' and Atlas is 'our managed multi-cloud database-as-a-service' running the customer's live workloads — re-platforming a database is a rewrite, not a swap.

source: sec.gov

Leadership behind

The 10-K makes no leadership claim and gives no ranking or share figure. Item 1A concedes "We do not have the resources to compete with larger providers of similar products or services at this time" and that some rivals have "substantially greater liquidity and financial resources than we do." Its Competition section places APLD against established operators (Digital Realty, Equinix), hyperscalers that build their own capacity, independent developers and 13 named power-advantaged developers (IREN, Cipher Digital, TeraWulf, Hut 8, Riot, CleanSpark, HIVE, Core Scientific, Bitdeer, Galaxy Digital, Fermi, Keel Infrastructure, MARA).

source: sec.gov

co leader

Vistra describes itself as "one of the largest producers of power in deregulated markets in the U.S." with over 230 TWh generated, "one of the largest competitive power generators in the U.S. as measured by MWh of generation capacity", "one of the largest electricity generators in the U.S.", and "one of the largest competitive residential retail electricity providers". That hedged phrasing appears four times and is the strongest claim the filing makes. The 10-K names no competitor and assigns no rank, so co-leader is the ceiling the disclosure supports.

source: sec.gov

co leader

The 10-K positions MongoDB as the leading document database by developer mindshare but names 'legacy database providers and large cloud providers' as better-resourced rivals across the broader database market — a category leader within a market it does not lead overall.

source: sec.gov

Pricing power weak

Item 1A says "Due to the limited number of hyperscalers, we expect that a limited number of customers will continue to account for a high percentage of our revenue for the foreseeable future," and that if customers' equipment usage declines or they discontinue use of its facilities, APLD "may be compelled to lower our lease prices in some instances or risk losing a significant customer." One customer was 59% of FY2026 revenue from continuing operations. Take-or-pay, non-cancellable terms protect contracted revenue over the base term, and Note 19 reports a $39.1M HPC Hosting segment profit on $385.3M of segment revenue in FY2026, but those terms are agreed with a small group of concentrated buyers.

source: sec.gov

weak

Vistra is a merchant price taker. Price formation rests on "the highest variable cost unit that clears the market", prices are "unpredictable and may fluctuate substantially", hedging markets have "limited liquidity after two to three years", and competing retailers "may offer different products, lower electricity prices and other incentives". ERCOT's $2,000/MWh figure is the low system-wide offer cap, applied conditionally when the peaker net margin exceeds three times CONE or under the PUCT Emergency Pricing Program, not a standing cap. PJM has "announced that it would propose" extending its capacity cap to 2028-29 and 2029-30, subject to FERC approval.

source: sec.gov

moderate

Owning the IP and the roadmap ('the determination of which features are included in our free or paid offerings') gives real list-price control, but the same filing flags competitors offering database products 'at a low cost or no cost basis,' which caps it.

source: sec.gov

Summary

Applied Digital designs, builds and operates purpose-built, liquid-cooled HPC data centers, which it calls 'AI factories', and leases the capacity to CoreWeave and investment-grade hyperscalers. At May 31, 2026 its 10-K lists five campuses (Polaris Forge 1-3 and Delta Forge 1-2) with about 1,410 MW contracted under roughly 15-year take-or-pay, non-cancellable leases worth about $36.2 billion over the base terms. The filing claims three sources of advantage: it controls power-advantaged sites, it uses a standardized 'franchise-style' design built to deliver about 150 MW in about 14 to 18 months, and it holds hyperscaler master agreements that are 'difficult to obtain.' The same document shows how early the company is. About 100 MW was operating and earning revenue. One customer was 59% of FY2026 revenue from continuing operations. It competes with Digital Realty, Equinix, hyperscalers that build their own capacity and 13 named power-advantaged developers, and it concedes that it lacks the resources to compete with larger providers. Signed leases give long-dated revenue visibility, but the filing does not show a durable competitive advantage.

Vistra's moat is one scarce asset wrapped in a commodity business. Six NRC-licensed nuclear units - 6,448 MW, licences running 2036-2053 - sit inside a 43,641 MW fleet that the 10-K says operates in the majority as "merchant" facilities with no long-term power sales agreements and no guaranteed rate of return. That block cannot be rebuilt by a rival, and is now partly de-risked by 20-year PPAs with AWS (1,200 MW from Comanche Peak) and Meta (2,609 MW from the PJM plants) plus section 45U credits. Everything else - 26,989 MW of gas, 8,743 MW of coal, the 5m-customer retail book - competes on price in markets Vistra does not set, against entrants the filing says keep building "despite relatively low power prices". The 2025 growth was gas M&A (Lotus, pending Cogentrix), which widens the commodity-exposed side. Narrow, for a specific reason: the moat is 15% of the fleet.

MongoDB monetizes developer mindshare that began as open source: the 10-K notes 'we own the intellectual property of our offerings since we are the creators of the software,' which lets it run a 'proprietary software subscription business model' and control the roadmap. The durable asset is the document-model install base and Atlas's managed multi-cloud workloads, positioned for AI as 'the underlying database … capable of processing queries against rich and complex data structures.' The counterweight, in the filing's own words, is that the large cloud providers it depends on for Atlas hosting are also its best-resourced competitors.

Chain position

Developer and landlord of power-advantaged, liquid-cooled AI data-center capacity, leased long-term to CoreWeave and investment-grade hyperscalers.

Merchant IPP: sells energy, capacity and ancillary services into ISO/RTO spot and short-term wholesale markets (ERCOT, PJM, ISO-NE, NYISO, CAISO, MISO) and resells to ~5m retail customers. Emerging role as long-term nuclear offtake supplier to hyperscalers (AWS, Meta). Not a price setter at any link.

Layer-10 application-layer data platform — the operational database under AI and general software workloads.

Products (share / barrier)
  • Blockchain data center hosting (Jamestown / Ellendale) Niche · Low source: sec.gov
  • HPC data center leasing (Polaris Forge / Delta Forge AI factories) Challenger · Moderate source: sec.gov
  • Coal and lignite generation fleet Unknown · Low source: sec.gov
  • Long-term large-load / data-centre power offtake (AWS and Meta PPAs) Unknown · Deep source: sec.gov
  • Natural gas generation fleet (CCGT and peaking) Unknown · Low source: sec.gov
  • Nuclear generation fleet (Comanche Peak, Perry, Davis-Besse, Beaver Valley) Unknown · Deep source: sec.gov
  • Retail electricity and natural gas (TXU Energy, Ambit, Dynegy Energy Services, Homefield, Energy Harbor, U.S. Gas & Electric) Unknown · Low source: sec.gov
  • Vistra Zero - solar and battery energy storage Unknown · Low source: sec.gov
Long-horizon vote -0.20 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

+0.05 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

+0.13 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →