Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.

comparing ASM International×Netlist×Cipher Mining× maximum of 3 — remove one to swap
ASM International ASMIY ai moat: latest change 2026-03-12 Netlist NLST ai moat: latest change 2026-10-08 Cipher Mining CIFR ai moat: latest change 2026-02-24
Moat rating narrow

The 2025 annual report (published 2026-03-12) says 'ASM is the leader in the fast-growing single-wafer ALD market – with a market share of 55%+ (ASM estimate, Investor Day 2025)'. It says ASM 'maintained leadership with our market share surpassing 55%' as the industry moved from FinFET to GAA. And it says that 'Based on the breadth of our R&D engagements and critical production-tool-of-record (PTOR) selections already secured in 2025, we expect to at least maintain our market share' into the 1.4nm node. The Q2 2026 results (https://www.asm.com/media/y0mkxj21/20260728-asm-reports-second-quarter-2026-results.pdf) say the 1.4nm node is on track for its first meaningful contribution in the second half of 2026, 'reflecting increased market share gains in both ALD and Epi'. 2025 gross margin was 51.8%. That is a strong, profitable position, but every share figure behind it is ASM's own estimate or expectation, and no independent share source supports it, so the rating is narrow rather than wide. The exposures also weigh: the five largest customers took about 53.6% of 2025 revenue and China more than 30%, and the report describes the main competitors as 'much larger companies from the United States and Asia'.

source: asm.com

narrow

Netlist's patents have now brought licence payments from all three big DRAM makers, which is the strongest evidence that they matter. Blocks & Files (2026-10-08) says Netlist 'has now won IP disputes against Micron, Samsung and SK hynix over its memory technology, gaining fees valued at $1.54 billion'. In August 2026, Samsung agreed to pay Netlist '$897 million over 5 years in licensing fees' (Blocks & Files). That figure is a ceiling: Netlist's Form 8-K (2026-08-05) sets Samsung's quarterly fees at 'up to US$32.9 million' each, calculated by 'a revenue-based formula' and 'subject to certain adjustments and refund rights of Samsung'. In October 2026, Micron agreed to pay '$30 million per quarter from the fourth quarter of 2026 through the third quarter of 2031, totaling $600 million' for a five-year licence (Netlist release, 2026-10-06). SK hynix's dispute ended in April 2021 with a '$40 million settlement, a cross-licensing deal and a supply arrangement' (Blocks & Files). The moat is narrow, not wide, because it is time-limited and contested. Both new licences run five years. On 2026-09-02 the Federal Circuit upheld PTAB decisions finding all challenged claims of Netlist's '339, '918 and '054 patents unpatentable as obvious (IPWatchdog). The FY2025 10-K says 'all of our issued patents will eventually expire'. The product business has no such protection: 2025 gross profit was $11.4 million on net sales of $188.6 million (results release, 2026-03-03).

source: blocksandfiles.com

none

Cipher (renamed Cipher Digital Inc. on 20 February 2026) holds signed, credit-supported leases but has not yet shown that they amount to a durable advantage. Its 2025 Form 10-K (filed 2026-02-24) says "Through the end of 2025, our revenue has been derived from mining bitcoin". Its Q2 2026 business update (2026-08-04, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/q226_earningsxprxdraftxvf.htm) reported "Q2 2026 Revenue of $25 million", and its first HPC rent began only in August 2026 at Black Pearl. The 10-K's own risk factors describe a contested market. They say "There has been an increasing number of businesses constructing HPC data centers, which has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive", that "our data centers are single-tenant properties", and that lessees "will have the right to terminate the lease if there are significant delays in the completion of construction". At Barber Lake, where the 10-K targeted Phase I delivery "by September 30, 2026", a September 2026 amendment, made "In connection with change orders and the continued evolution of tenant requirements", moved data-hall deliveries to the fourth quarter of 2026 through the first quarter of 2027. Under it, Cipher "will bear the first $359.3 million of costs in excess of the initial budgeted amount" (2026-09-25). There is real counter-evidence: a 15-year Amazon lease, a Google-backstopped Fluidstack lease whose contracted life a "leading AI lab" extended to 20 years, and a third lease with an investment-grade hyperscale tenant. Until that capacity is delivered and paying rent, though, a moat is not shown, so the band is none.

source: sec.gov

Moat type intangibles ip

The report grounds the ALD lead in accumulated process know-how and patents rather than unit cost: 'ASM has the broadest portfolio of ALD products with innovative ALD reactor designs. Our strength in chemistries and applications using new materials means our customers can meet advanced node technology challenges.' It also cites a LexisNexis PatentSight study finding that 'ASM holds a strong and impactful patent portfolio on its core strength of ALD as measured by both Competitive Impact and Patent Asset Index'. Switching friction reinforces this. Tools enter fabs through PTOR selection, the report notes that 'Failing a customer during a production ramp could create significant problems for them', and installed systems are supported 'with a view to having them in production 24/7 for 20+ years'. But ASM wins those PTOR slots node by node on process capability, which makes IP the primary source.

source: asm.com

intangibles ip

The advantage is the patent portfolio, enforced in court; scale and customer lock-in play no part. The FY2025 10-K reports 'over 200 issued patents and pending patent applications worldwide' as of December 27, 2025. It says the company's business strategy 'includes litigating claims against others, such as our competitors and customers, to enforce our intellectual property rights'. Netlist says it invented the distributed buffer architecture and that 'The memory industry has widely adopted our distributed architecture for DDR4 LRDIMM'. It also says 'many in the memory industry have now adopted our approach' to on-module power management 'for their DDR5-based DIMMs'. Those are the company's own claims. The licences give them outside weight: Micron's covers 'patents covering server DIMMs and High Bandwidth Memory technologies' (Netlist release, 2026-10-06), and Samsung's covers Netlist's 'complete patent portfolio, including its server DIMM and High Bandwidth Memory technologies' (Netlist release, 2026-08-05).

source: blocksandfiles.com

none

No moat source is demonstrated yet. Switching costs are the most likely candidate, since the leases are long (15 years at Black Pearl; Barber Lake now a 20-year contracted life) and each site has a single tenant. But the 10-K says tenant guarantees "will only be effective after rent commencement under such leases and are subject to certain limitations", and by August 2026 rent had begun at only one site. The advantages the 10-K claims are the company's own. It speaks of "industry-leading expertise in originating and securing industrial-scale, greenfield data center sites" and of securing West Texas land "on more favorable terms than in more established data center markets". The same document says "there is significant competition for power capacity and energized facilities". Intellectual property is modest: "four granted United States patents and one issued patent in Taiwan". With 66 full-time employees, Cipher has no scale advantage over the competitors it names: CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers.

source: sec.gov

Leadership co leader

In single-wafer ALD, which is more than half of equipment sales, the report calls ASM 'the leader' with a 55%+ share. That share is ASM's own estimate; the Investor Day 2025 deck (https://www.asm.com/media/m3jhkm12/asm_investor_day_2025.pdf) sources it to 'ASM internal analysis and TechInsights'. With no independent share source, the band is held at co_leader rather than clear_leader. ASM does not lead every line: 'ASM has the number two share in the Epi equipment market', and in PECVD and vertical furnaces it is 'focused on niche portions of the market'.

source: asm.com

behind

As a product company Netlist is a small player against much larger rivals. The FY2025 10-K says it faces 'competition from DRAM suppliers, memory module providers and logic suppliers'. It says 'many of our competitors have substantially greater financial, technical, marketing, distribution and other resources, broader product lines, lower cost structures, greater brand recognition, more influence on industry standards, more extensive or established patent portfolios'. Its suppliers are potential rivals: 'some of our significant suppliers could choose to sell component products to customers directly'. It had 72 employees at the end of 2025. Samsung, Micron and SK hynix have licensed its patents (Blocks & Files, 2026-10-08), but that is licence income, not product leadership, so the band is behind.

source: blocksandfiles.com

fast follower

No independent share or rank was found. The 10-K names CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers as competitors, along with miners that have "signed leases with hyperscalers and HPC tenants": Hut 8, IREN, TeraWulf, Core Scientific and Applied Digital. Cipher has signed hyperscale-grade tenants (Amazon; Fluidstack with a Google backstop; a third investment-grade hyperscaler) but delivered its first HPC capacity only in August 2026 (Q2 2026 update). That makes it a fast follower. Its self-description as "a leading developer, owner, and operator of industrial-scale data centers" is the company's own claim and is not counted.

source: sec.gov

Pricing power moderate

Gross margin rose from 50.5% to 51.8% in 2025 and was 51.9% in Q2 2026. But the report attributes the 2025 gain to 'a very strong mix, including a continued solid contribution from the Chinese market' and to efficiency programs, not to price. It targets a range of 47% to 51% for 2026-2030, and the Q2 2026 release expects full-year 2026 gross margin 'to be around 51%'. Buyers are concentrated: the 10 largest customers were about 72.3% of 2025 revenue, the five largest about 53.6%, and two customers each contributed more than 10% of total revenue.

source: asm.com

weak

The product business has little pricing power. Full-year 2025 gross profit was $11.4 million on net sales of $188.6 million (results release, 2026-03-03). Q2 2026 gross profit was $22.9 million on net sales of $109.8 million (results release, 2026-07-30). The FY2025 10-K says 'large or key customers exert pressure on us to make concessions in the prices at which we sell products to them'. It says that when component prices rise 'we generally cannot pass the price increases through to our customers for products purchased under an existing purchase order'. Gross margin on resales 'is typically lower than our gross margin on sales of our own memory subsystem products'. The licence fees are set by the settlement terms for five years, though Samsung's quarterly fees follow 'a revenue-based formula' and 'may be subject to certain adjustments and refund rights of Samsung' (Form 8-K, 2026-08-05). Micron pays '$30 million a quarter until the third quarter of 2031', and Samsung pays an upfront '$239 million' plus 'quarterly payments of up to $32.9 million gross' (Blocks & Files, 2026-10-08).

source: blocksandfiles.com

weak

The 10-K says competition "has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive". It adds that if customers cut usage "we may be compelled to lower our prices or risk losing a significant customer". At Barber Lake, Cipher agreed to absorb "the first $359.3 million of costs in excess of the initial budgeted amount", with the tenant reimbursing "50% of any such costs above that amount" (2026-09-25, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000043/barberlakeleaseamendmentpr.htm). Its one input-cost edge is specific to mining: Odessa's power costs about 2.8 c/kWh under the Luminant contract, available "until at least July 2027". A landlord that concedes cost overruns to its tenants has weak pricing power.

source: sec.gov

Summary

ASM International, headquartered in the Netherlands, makes wafer-processing equipment with a focus on deposition: single-wafer ALD, silicon epitaxy, PECVD, vertical furnaces, silicon-carbide epitaxy and, since its acquisition of Axus in December 2025, CMP. Spares & Services made up 23% of 2025 revenue. ALD is the core. It was the largest product line, 'clearly accounting for more than half of our equipment sales', and ASM estimates its single-wafer ALD share at 55%+. The report frames ALD as increasingly necessary, saying 'ALD is the only deposition technology capable of meeting the coverage and film-property requirements for complex 3D structures', and expects ALD layers to grow in GAA transistor stacks, backside-power architectures and future 4F² DRAM. Epitaxy is the second-largest line: the report says ASM holds the number two share there and lifted its leading-edge share from 12% in 2020 to 25% in 2024, both by ASM's own figures. 2025 revenue reached a record €3.2 billion at a gross margin of 51.8%; per the Q2 2026 results, Q2 2026 revenue was €1,003 million at 51.9%. The exposures are customer concentration (the five largest customers were about 53.6% of 2025 revenue), geography (Asia was 80% of revenue and China more than 30%), and export restrictions that the report says are 'impacting our ability to sell and service systems in certain jurisdictions and for certain customers'.

Netlist is a memory company in Irvine, California, with 72 employees (FY2025 10-K). It sells specialty memory modules to OEMs and resells memory and storage components. The 10-K says 'In recent periods, a large portion of our net product sales were generated from resales', in some past periods much of it sourced from SK hynix under a supply agreement that 'expires in April 2026'. Since 2000 it has been profitable in only two fiscal years, 2006 and 2021 (10-K). Blocks & Files (2026-10-08) says it has been 'largely loss-making' since its 2006 IPO, and that the first half of 2026 was profitable before the larger Samsung and Micron licence payments. Its value lies in patents on server memory modules and HBM, which it has fought over in court for years. Samsung faced 'a $303 million jury award' in April 2023 (IP Fray, 2026-08-05). In 2026 those fights became licence fees. Samsung signed a five-year cross licence, settled all pending actions and gave Netlist the right to buy 'up to $1.5 billion of DRAM and NAND products over five years' (Blocks & Files). Micron signed a five-year licence and settled in October. Before that, IP Fray (2026-08-13) reported Netlist going after Micron, HPE and Lenovo at the ITC and in district court after the Samsung deal; IP Fray (2026-10-06) says the Micron settlement 'ends all pending legal proceedings between the companies'. A case against Google over a rank-multiplication patent has been open since 2008 (Blocks & Files).

Cipher built bitcoin mining data centres in Texas and is now developing single-tenant AI and HPC campuses for lease to hyperscalers. Its 10-K reports a portfolio of "4.2 gigawatts ("GW") of capacity across 10 sites". It lists a 15-year Amazon Web Services lease for about 300 MW of turnkey capacity at Black Pearl and a Fluidstack lease at Barber Lake (300 MW gross) under which Google "has agreed to backstop certain obligations of Fluidstack". It describes bitcoin mining at Odessa on a Luminant power contract at about 2.8 c/kWh. In 2026 it signed a third campus lease "with an investment-grade Hyperscale tenant" (Q1 2026 update, 2026-05-05), delivered first Black Pearl capacity in August "two months ahead of the original schedule" with rent commenced, and fully funded its Stingray development with a bond (Q2 2026 update). On 2026-09-25 it said Barber Lake's contracted life was extended from 10 to 20 years, taking contracted revenue at the site "from $3.8 billion to over $9 billion". The 10-K says Odessa was "the first bitcoin mining data center awarded the Management and Operations, or M&O, Stamp of Approval award from the Uptime Institute", which is independent recognition of how the company operates. Against this, the latest quarter's revenue was still bitcoin mining and fell to $25 million. The 10-K describes growing "competition and pricing pressure", single-tenant concentration, and termination rights for construction delays. The Barber Lake schedule was reset, and Cipher absorbs the first $359.3 million of cost overruns. Cipher's contracted pipeline is substantial, but a competitive advantage is not yet demonstrated, so it is rated as having no moat. That could change to narrow once its leased campuses are delivered and paying rent.

Chain position

Upstream wafer-fab-equipment supplier to logic/foundry and memory chipmakers. 'The leading-edge logic/foundry market was the main growth driver for ASM, on the back of 2nm investments' in 2025, advanced-node DRAM was the largest part of memory sales, and Asia was 80% of revenue.

Memory-module maker and component reseller between the DRAM and NAND makers that supply it (SK hynix, under a 2021 supply agreement the FY2025 10-K says 'expires in April 2026', and Samsung under the 2026 supply agreement) and server OEMs, storage, system-builder and data-center customers. It also licenses its patents to Samsung, Micron and SK hynix.

Cipher develops single-tenant, powered data-centre campuses for hyperscale and AI tenants: Amazon at Black Pearl, Fluidstack (backstopped by Google) at Barber Lake, and an unnamed investment-grade hyperscaler at a third campus. Meanwhile it winds down bitcoin mining.

Products (share / barrier)
  • Bitcoin mining (Odessa) Unknown · Low source: sec.gov
  • HPC data center leasing (Black Pearl, Barber Lake, Stingray) Challenger · Moderate source: sec.gov
Long-horizon vote +0.13 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

-0.15 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

-0.06 at weight 0.20 · swarm bearish

Editorial prior, not backtested.

see exactly how it voted →