Skip to content

Compare moats

Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.

comparing Cipher Mining×CrowdStrike×ASML× maximum of 3 — remove one to swap
Cipher Mining CIFR ai moat: latest change 2026-02-24 CrowdStrike CRWD ai moat: latest change 2026-03-05 ASML ASML ai moat: latest change 2025-12-31
Moat rating none

Cipher (renamed Cipher Digital Inc. on 20 February 2026) holds signed, credit-supported leases but has not yet shown that they amount to a durable advantage. Its 2025 Form 10-K (filed 2026-02-24) says "Through the end of 2025, our revenue has been derived from mining bitcoin". Its Q2 2026 business update (2026-08-04, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/q226_earningsxprxdraftxvf.htm) reported "Q2 2026 Revenue of $25 million", and its first HPC rent began only in August 2026 at Black Pearl. The 10-K's own risk factors describe a contested market. They say "There has been an increasing number of businesses constructing HPC data centers, which has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive", that "our data centers are single-tenant properties", and that lessees "will have the right to terminate the lease if there are significant delays in the completion of construction". At Barber Lake, where the 10-K targeted Phase I delivery "by September 30, 2026", a September 2026 amendment, made "In connection with change orders and the continued evolution of tenant requirements", moved data-hall deliveries to the fourth quarter of 2026 through the first quarter of 2027. Under it, Cipher "will bear the first $359.3 million of costs in excess of the initial budgeted amount" (2026-09-25). There is real counter-evidence: a 15-year Amazon lease, a Google-backstopped Fluidstack lease whose contracted life a "leading AI lab" extended to 20 years, and a third lease with an investment-grade hyperscale tenant. Until that capacity is delivered and paying rent, though, a moat is not shown, so the band is none.

source: sec.gov

narrow

Narrow rather than wide because the FY2026 10-K argues both ways and its own risk factors are the harder side: it describes a self-reinforcing data advantage and says "we do not believe any of our competitors currently have a true platform offering equivalent to the Falcon platform", but the same filing calls the market for security and IT operations solutions "intensely competitive, fragmented", warns that "Competitive pricing pressure may reduce our gross profits", and still carries the July 19 Incident as having "had, and is expected to continue to have, an adverse effect on our business, sales, customer and partner relations, reputation" more than two years after it occurred.

source: sec.gov

wide

ASML's FY2025 20-F states it "is currently the world's only manufacturer of EUV lithography systems" — an effective monopoly on the extreme-ultraviolet tools required to pattern leading-edge logic and memory chips.

source: sec.gov

Moat type none

No moat source is demonstrated yet. Switching costs are the most likely candidate, since the leases are long (15 years at Black Pearl; Barber Lake now a 20-year contracted life) and each site has a single tenant. But the 10-K says tenant guarantees "will only be effective after rent commencement under such leases and are subject to certain limitations", and by August 2026 rent had begun at only one site. The advantages the 10-K claims are the company's own. It speaks of "industry-leading expertise in originating and securing industrial-scale, greenfield data center sites" and of securing West Texas land "on more favorable terms than in more established data center markets". The same document says "there is significant competition for power capacity and energized facilities". Intellectual property is modest: "four granted United States patents and one issued patent in Taiwan". With 66 full-time employees, Cipher has no scale advantage over the competitors it names: CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers.

source: sec.gov

network effects

The 10-K states the mechanism directly: "The more data that is fed into our Falcon platform, the more intelligent the AI Security Cloud becomes, the stronger our ability to anticipate and counter evolving adversary tradecraft, and the more our customers benefit, creating a powerful network effect that increases the overall value we provide."

source: sec.gov

intangibles ip

The durable advantage rests on decades of proprietary technology and IP — the 20-F describes ASML's April 2025 1,000-watt EUV light source as "built on 25 years of engineering advancements" — reinforced by an exclusive arrangement with Carl Zeiss SMT as its "sole supplier" of the critical optics no rival can source.

source: sec.gov

Leadership fast follower

No independent share or rank was found. The 10-K names CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers as competitors, along with miners that have "signed leases with hyperscalers and HPC tenants": Hut 8, IREN, TeraWulf, Core Scientific and Applied Digital. Cipher has signed hyperscale-grade tenants (Amazon; Fluidstack with a Google backstop; a third investment-grade hyperscaler) but delivered its first HPC capacity only in August 2026 (Q2 2026 update). That makes it a fast follower. Its self-description as "a leading developer, owner, and operator of industrial-scale data centers" is the company's own claim and is not counted.

source: sec.gov

co leader

Co-leader rather than clear leader because the only claim of platform primacy available is the company's own ("we do not believe any of our competitors currently have a true platform offering equivalent"), while the same 10-K describes a fragmented market and lists seven distinct categories of competitor, from legacy antivirus to network security, cloud security, identity and legacy SIEM vendors.

source: sec.gov

clear leader

Effectively 100% of the EUV market as the world's only EUV system maker; in the older DUV segment it "compete[s] primarily with Canon and Nikon" yet remains the leading supplier.

source: sec.gov

Pricing power weak

The 10-K says competition "has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive". It adds that if customers cut usage "we may be compelled to lower our prices or risk losing a significant customer". At Barber Lake, Cipher agreed to absorb "the first $359.3 million of costs in excess of the initial budgeted amount", with the tenant reimbursing "50% of any such costs above that amount" (2026-09-25, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000043/barberlakeleaseamendmentpr.htm). Its one input-cost edge is specific to mining: Odessa's power costs about 2.8 c/kWh under the Luminant contract, available "until at least July 2027". A landlord that concedes cost overruns to its tenants has weak pricing power.

source: sec.gov

moderate

The 10-K's risk factors state that "Competitive pricing pressure may reduce our gross profits" and that competing successfully may require "aggressive pricing", which is the company's own case against strong pricing power; the offsetting factor it cites is module consolidation on one sensor.

source: sec.gov

strong

FY2025 gross margin of 52.8%, up 1.5 percentage points year over year, with management guiding toward 56-60% by 2030 — consistent with monopoly pricing power on EUV tools.

source: sec.gov

Summary

Cipher built bitcoin mining data centres in Texas and is now developing single-tenant AI and HPC campuses for lease to hyperscalers. Its 10-K reports a portfolio of "4.2 gigawatts ("GW") of capacity across 10 sites". It lists a 15-year Amazon Web Services lease for about 300 MW of turnkey capacity at Black Pearl and a Fluidstack lease at Barber Lake (300 MW gross) under which Google "has agreed to backstop certain obligations of Fluidstack". It describes bitcoin mining at Odessa on a Luminant power contract at about 2.8 c/kWh. In 2026 it signed a third campus lease "with an investment-grade Hyperscale tenant" (Q1 2026 update, 2026-05-05), delivered first Black Pearl capacity in August "two months ahead of the original schedule" with rent commenced, and fully funded its Stingray development with a bond (Q2 2026 update). On 2026-09-25 it said Barber Lake's contracted life was extended from 10 to 20 years, taking contracted revenue at the site "from $3.8 billion to over $9 billion". The 10-K says Odessa was "the first bitcoin mining data center awarded the Management and Operations, or M&O, Stamp of Approval award from the Uptime Institute", which is independent recognition of how the company operates. Against this, the latest quarter's revenue was still bitcoin mining and fell to $25 million. The 10-K describes growing "competition and pricing pressure", single-tenant concentration, and termination rights for construction delays. The Barber Lake schedule was reset, and Cipher absorbs the first $359.3 million of cost overruns. Cipher's contracted pipeline is substantial, but a competitive advantage is not yet demonstrated, so it is rated as having no moat. That could change to narrow once its leased campuses are delivered and paying rent.

A single lightweight sensor collects enterprise data once and reuses it across 33 cloud modules, and the pooled telemetry trains the models every customer is then defended by — the 10-K calls this crowdsourced, high-fidelity data "cloud-scale AI" and treats it as the fundamental differentiator from competitors.

ASML is the sole producer of EUV lithography systems, the only tools able to pattern the most advanced logic and memory nodes, with a roadmap "intended to drive affordable scaling to 2030 and beyond" and a High-NA EUV (TWINSCAN EXE) platform on which customers "had run more than 400,000 wafers" by end-2025. That dominance is protected by 25 years of accumulated engineering IP and an exclusive lock on Carl Zeiss SMT optics that competitors cannot replicate.

Chain position

Cipher develops single-tenant, powered data-centre campuses for hyperscale and AI tenants: Amazon at Black Pearl, Fluidstack (backstopped by Google) at Barber Lake, and an unnamed investment-grade hyperscaler at a third campus. Meanwhile it winds down bitcoin mining.

AI-native security platform — an adopter and reseller of AI rather than a supplier of AI infrastructure.

Upstream chokepoint of the AI chip supply chain: every leading-edge logic/DRAM wafer for AI accelerators is patterned on ASML EUV tools, making it the single indispensable equipment supplier to TSMC, Samsung and Intel.

Products (share / barrier)
  • Bitcoin mining (Odessa) Unknown · Low source: sec.gov
  • HPC data center leasing (Black Pearl, Barber Lake, Stingray) Challenger · Moderate source: sec.gov
Long-horizon vote -0.06 at weight 0.20 · swarm bearish

Editorial prior, not backtested.

see exactly how it voted →

+0.13 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

+0.42 at weight 0.20 · swarm bullish

Editorial prior, not backtested.

see exactly how it voted →