Compare moats
Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.
| Cipher Mining | IREN | MACOM Technology Solutions | |
|---|---|---|---|
| Moat rating | none Cipher (renamed Cipher Digital Inc. on 20 February 2026) holds signed, credit-supported leases but has not yet shown that they amount to a durable advantage. Its 2025 Form 10-K (filed 2026-02-24) says "Through the end of 2025, our revenue has been derived from mining bitcoin". Its Q2 2026 business update (2026-08-04, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/q226_earningsxprxdraftxvf.htm) reported "Q2 2026 Revenue of $25 million", and its first HPC rent began only in August 2026 at Black Pearl. The 10-K's own risk factors describe a contested market. They say "There has been an increasing number of businesses constructing HPC data centers, which has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive", that "our data centers are single-tenant properties", and that lessees "will have the right to terminate the lease if there are significant delays in the completion of construction". At Barber Lake, where the 10-K targeted Phase I delivery "by September 30, 2026", a September 2026 amendment, made "In connection with change orders and the continued evolution of tenant requirements", moved data-hall deliveries to the fourth quarter of 2026 through the first quarter of 2027. Under it, Cipher "will bear the first $359.3 million of costs in excess of the initial budgeted amount" (2026-09-25). There is real counter-evidence: a 15-year Amazon lease, a Google-backstopped Fluidstack lease whose contracted life a "leading AI lab" extended to 20 years, and a third lease with an investment-grade hyperscale tenant. Until that capacity is delivered and paying rent, though, a moat is not shown, so the band is none. | none The FY2026 10-K (filed 2026-08-27) shows IREN holds an input the industry competes on: it names 'access to secured and energized power' first among what it believes are the principal competitive factors in its industry, and reports 'executed grid connection agreements, letters of agreement or equivalents representing approximately 5GW of total power capacity' in the United States, Canada, Spain and Australia as of June 30, 2026. It does not claim an advantage over rivals in that input. It says 'Certain competitors may have access to more competitively priced power, a greater access to power and a better capacity to timely secure grid connections,' and 'Many of our competitors have greater financial, technical or commercial resources, longer cloud operating histories or larger customer bases, compared to us.' Operating AI Cloud Services capacity was approximately 40MW at June 30, 2026, and the stored XBRL fundamentals from this 10-K show an FY2026 operating loss of about $1,046.7M on revenue of about $707.0M, so no durable advantage is yet demonstrated. | narrow MACOM’s FY2025 10-K describes advantages that are real but contested. On the durable side: a catalog of “thousands of standard and custom devices” serving “over 6,000 end customers”; its own compound-semiconductor fabs (GaAs, GaN and InP) in Lowell, Research Triangle Park, Ann Arbor and Limeil-Brévannes; a Lowell fab accredited by the U.S. Department of Defense with “Trusted Foundry” status, in markets where “a domestic fabrication facility may be a requirement to be a strategic supplier”; and product life cycles of five to ten years, “with some of our products generating revenue for over 20 years”. On the limiting side, the same filing calls its markets “highly competitive”, names ADI, Broadcom, Credo, Marvell, MaxLinear, Microchip, NXP, Qorvo, Semtech, Skyworks and Sumitomo among its significant competitors, “some of whom have greater financial resources and scale than us”, adds “increased competition from Chinese companies”, sells “primarily on a purchase order basis” with no minimum purchase commitments, and warns that “the ASPs of our products may decrease over time”. Its income statement reports gross profit of $385,797 thousand on revenue of $648,407 thousand in fiscal 2023, $393,773 thousand on $729,578 thousand in fiscal 2024 and $529,002 thousand on $967,258 thousand in fiscal 2025. Process know-how and defense accreditation that larger rivals can contest, product generation by product generation, is a narrow moat rather than a wide one. |
| Moat type | none No moat source is demonstrated yet. Switching costs are the most likely candidate, since the leases are long (15 years at Black Pearl; Barber Lake now a 20-year contracted life) and each site has a single tenant. But the 10-K says tenant guarantees "will only be effective after rent commencement under such leases and are subject to certain limitations", and by August 2026 rent had begun at only one site. The advantages the 10-K claims are the company's own. It speaks of "industry-leading expertise in originating and securing industrial-scale, greenfield data center sites" and of securing West Texas land "on more favorable terms than in more established data center markets". The same document says "there is significant competition for power capacity and energized facilities". Intellectual property is modest: "four granted United States patents and one issued patent in Taiwan". With 66 full-time employees, Cipher has no scale advantage over the competitors it names: CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers. | none The FY2026 10-K's asserted advantage is control from owning its data centers, 'including the associated land, grid connections and substations', which it believes allows it 'to benefit from more sustainable cash flows and operational flexibility relative to operators that rely upon third-party colocation services or short-term land leases'. Its only scale language is a belief that its 'procurement scale, deployment experience and direct control over the data center layer' lets it bring new compute into service 'rapidly and at scale', a deployment-speed claim, and it 'generally target[s]' regions with 'low-cost and attractive renewable energy sources', a siting target rather than a demonstrated cost position. It does not claim a cost or scale lead: it says 'Many of our competitors are larger, have longer operating histories and significantly greater resources than we do' and that certain competitors 'may have access to more competitively priced power, a greater access to power and a better capacity to timely secure grid connections.' There is no network effect or lock-in either, since existing contracts have 'terms ranging from month to month up to five years'. No enumerated moat source is grounded. | intangibles ip The FY2025 10-K places the advantage in process and design know-how: “We continue to invest in proprietary processes, circuit design and packaging technologies”, “we utilize a broad array of internal, proprietary process technologies and commercially available foundry technologies”, and U.S.-based wafer fabrication “enables us to offer proprietary processes” and provides “a domestic source for U.S. I&D customers”. The filing itself says patents matter less than people: MACOM held 729 U.S. and 497 foreign issued patents as of October 3, 2025, but “we believe that our future success will be determined by the innovation, technical expertise and management abilities of our engineers and management more than by patent ownership”. Switching costs are the weaker candidate: long product life cycles help in Industrial & Defense, but sales are made on purchase orders and new business must be won through “a competitive selection process to develop semiconductors for use in our customers' systems, known in the industry as a ‘design win.’” |
| Leadership | fast follower No independent share or rank was found. The 10-K names CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers as competitors, along with miners that have "signed leases with hyperscalers and HPC tenants": Hut 8, IREN, TeraWulf, Core Scientific and Applied Digital. Cipher has signed hyperscale-grade tenants (Amazon; Fluidstack with a Google backstop; a third investment-grade hyperscaler) but delivered its first HPC capacity only in August 2026 (Q2 2026 update). That makes it a fast follower. Its self-description as "a leading developer, owner, and operator of industrial-scale data centers" is the company's own claim and is not counted. | behind The 10-K lists IREN's competitors as hyperscalers (Amazon Web Services, Google Cloud, Microsoft Azure, Oracle Cloud) and specialized AI Cloud Services providers (CoreWeave, Nebius, Crusoe, Lambda, Nscale, SpaceX and others). It says IREN began providing AI Cloud Services in 2024 and cites its 'shorter operating history in AI Cloud Services relative to some competitors', and states 'Some of our competitors have longer operating histories, larger customer bases, more comprehensive IP portfolios and patent protections, more design wins, and greater financial, sales, marketing and distribution resources than we do.' Operating AI Cloud Services capacity was approximately 40MW at June 30, 2026. The filing describes a smaller, later entrant that trails some competitors on operating history, customer base and resources, with its progress so far resting on two anchor contracts (a ~$9.7B five-year Microsoft agreement and a ~$3.4B five-year NVIDIA contract) rather than any claimed category position. | fast follower The only independent ranking found is for the optical analog line. Deep Fundamental’s “Deep Dive: Optical Module Market” of September 27, 2024 (https://deepfundamental.substack.com/p/deep-dive-optical-module-market) states “In the driver/TIA market, Marvell ($MRVL) and Macom ($MTSI) are the dominant players, especially in the high-end 400G+ segment” and “in the LPO market, Macom holds a significant advantage, largely because Marvell, strong in DSP, tends to promote solutions that include DSP”. That is a shared front rank, from an equity-research newsletter rather than a market tracker, and now two years old. MACOM’s own FY2025 10-K claims no rank - it says “We believe that we compete favorably” - and names significant competitors from ADI and Broadcom to Marvell and Sumitomo, “some of whom have greater financial resources and scale than us”. No third-party ranking was found for the Industrial & Defense or Telecom lines. A two-year-old newsletter covering one of three segments cannot carry a company-wide co-leader call, so the band is fast follower. |
| Pricing power | weak The 10-K says competition "has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive". It adds that if customers cut usage "we may be compelled to lower our prices or risk losing a significant customer". At Barber Lake, Cipher agreed to absorb "the first $359.3 million of costs in excess of the initial budgeted amount", with the tenant reimbursing "50% of any such costs above that amount" (2026-09-25, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000043/barberlakeleaseamendmentpr.htm). Its one input-cost edge is specific to mining: Odessa's power costs about 2.8 c/kWh under the Luminant contract, available "until at least July 2027". A landlord that concedes cost overruns to its tenants has weak pricing power. | weak The 10-K's risk factors state 'Our competitors' products, services and technologies may be cheaper or provide better functionality or features than ours, which has resulted and may in the future result in lower-than-expected selling prices or demand for our products.' They also say long-term contract pricing 'is generally fixed or agreed at the time of contracting', so if market pricing for comparable capacity rises during a contract's term 'we will not benefit from those increases with respect to capacity already committed under our existing long-term contracts', and that if customers suffer a downturn or discontinue its services it 'may be compelled to offer more flexible terms, lower our prices or risk losing a significant customer.' The stored XBRL fundamentals from this 10-K show FY2026 revenue of about $707.0M against an operating loss of about $1,046.7M, so there is no margin record yet that evidences pricing power. | moderate The FY2025 10-K says “the ASPs of our products may decrease over time, and we must introduce new products that can be manufactured at lower costs or that command higher prices based on superior performance to offset price erosion”. On inflation it says MACOM has “generally been able to offset increases in these costs through various productivity and cost reduction initiatives, as well as adjusting our selling prices to pass through some of these higher costs to our customers; however, our ability to raise or maintain our selling prices depends on market conditions and competitive dynamics.” Margins have risen with the Data Center mix: the fiscal Q3 2026 earnings release (https://www.sec.gov/Archives/edgar/data/0001493594/000149359426000036/ex99_1earningsreleaseq3fy26.htm) reports GAAP gross margin of 58.3%, compared to 55.3% a year earlier, and guides fiscal Q4 adjusted gross margin to between 60.0% and 61.0%. The release does not say how much of that is price rather than mix or fab utilisation. |
| Summary | Cipher built bitcoin mining data centres in Texas and is now developing single-tenant AI and HPC campuses for lease to hyperscalers. Its 10-K reports a portfolio of "4.2 gigawatts ("GW") of capacity across 10 sites". It lists a 15-year Amazon Web Services lease for about 300 MW of turnkey capacity at Black Pearl and a Fluidstack lease at Barber Lake (300 MW gross) under which Google "has agreed to backstop certain obligations of Fluidstack". It describes bitcoin mining at Odessa on a Luminant power contract at about 2.8 c/kWh. In 2026 it signed a third campus lease "with an investment-grade Hyperscale tenant" (Q1 2026 update, 2026-05-05), delivered first Black Pearl capacity in August "two months ahead of the original schedule" with rent commenced, and fully funded its Stingray development with a bond (Q2 2026 update). On 2026-09-25 it said Barber Lake's contracted life was extended from 10 to 20 years, taking contracted revenue at the site "from $3.8 billion to over $9 billion". The 10-K says Odessa was "the first bitcoin mining data center awarded the Management and Operations, or M&O, Stamp of Approval award from the Uptime Institute", which is independent recognition of how the company operates. Against this, the latest quarter's revenue was still bitcoin mining and fell to $25 million. The 10-K describes growing "competition and pricing pressure", single-tenant concentration, and termination rights for construction delays. The Barber Lake schedule was reset, and Cipher absorbs the first $359.3 million of cost overruns. Cipher's contracted pipeline is substantial, but a competitive advantage is not yet demonstrated, so it is rated as having no moat. That could change to narrow once its leased campuses are delivered and paying rent. | Per its FY2026 10-K, IREN is a vertically integrated AI Cloud Services platform that owns the data center, compute and software layers, underpinned by executed grid connection agreements, letters of agreement or equivalents representing ~5GW and a further multi-GW development pipeline. Its commercial record is concentrated: a five-year Microsoft agreement (~$9.7B total contract value, Horizon 1 delivered and accepted in August 2026, Horizons 2-4 targeted for delivery in phases in calendar Q4 2026) and a five-year ~$3.4B NVIDIA cloud contract together make up a substantial majority of contracted revenue. It holds NVIDIA Preferred Partner and Exemplar Cloud status (HGX B300 and GB300 NVL72) and a strategic partnership intended to support the deployment over time of up to 5GW of NVIDIA DSX-aligned infrastructure, which the filing cites among arrangements that are non-binding or subject to conditions, with no assurance as to the extent of deployments. Against that, the filing names hyperscaler and specialized competitors (AWS, Google Cloud, Azure, Oracle, CoreWeave, Nebius, Crusoe, Lambda, Nscale, SpaceX), many of which it says have greater resources, customers that can use or develop their own solutions, and possible delays to Texas energization from changes to ERCOT's Batch Zero procedures, so the power position is not a demonstrated advantage over rivals and its value depends on execution. | MACOM is a broad-line analog, RF, microwave and optical semiconductor maker that, unusually for its size, runs its own compound-semiconductor fabs, including a Lowell, Massachusetts fab with Department of Defense “Trusted Foundry” accreditation. Its FY2025 10-K splits the business into Industrial & Defense (radar, electronic warfare, data links, SATCOM, medical and test and measurement), Data Center (TIAs, modulator drivers, lasers and photodetectors for 800G, 1.6T and 3.2T optical transceivers) and Telecom (long-haul and metro optics, 5G, SATCOM and FTTx/PON). The AI build-out has made Data Center the fastest-growing piece: the fiscal Q3 2026 10-Q (https://www.sec.gov/Archives/edgar/data/1493594/000149359426000038/mtsi-20260703.htm) reports Data Center revenue of $137,584 thousand for the quarter against $75,822 thousand a year earlier, out of total revenue of $342,237 thousand, and the accompanying release reports GAAP gross margin of 58.3%. An independent 2024 newsletter places MACOM with Marvell at the front of the optical driver/TIA market and ahead in linear-drive (LPO) optics. The moat stays narrow because each speed generation is re-won through design wins against larger rivals - the 10-K names ADI, Broadcom, Credo, Marvell, MaxLinear, Microchip, NXP, Qorvo, Semtech, Skyworks and Sumitomo, plus Chinese competitors - on purchase orders without minimum commitments, and the filing expects average selling prices to fall over time. |
| Chain position | Cipher develops single-tenant, powered data-centre campuses for hyperscale and AI tenants: Amazon at Black Pearl, Fluidstack (backstopped by Google) at Barber Lake, and an unnamed investment-grade hyperscaler at a third campus. Meanwhile it winds down bitcoin mining. | Downstream AI-cloud operator: owns grid-connected data centers and deploys NVIDIA/AMD GPU systems it rents to hyperscalers, frontier labs, AI developers and enterprises (anchor customers Microsoft and NVIDIA). | MACOM sells components that customers build into larger systems - the FY2025 10-K lists wireless basestations, high-capacity optical networks, data center networks, radar, medical systems, satellite networks and test and measurement. In the AI chain it sits upstream of optical-module makers, supplying TIAs, drivers, lasers and photodetectors for 800G and 1.6T transceivers. Sales to distributors were 32.3% of fiscal 2025 revenue, two resellers took 12.4% and 11.2%, and no direct customer reached 10%. |
| Products (share / barrier) |
|
|
|
| Long-horizon vote | -0.06 at weight 0.20 · swarm bearish Editorial prior, not backtested. | -0.20 at weight 0.20 · swarm bearish Editorial prior, not backtested. | +0.06 at weight 0.20 · swarm neutral Editorial prior, not backtested. |