Compare moats
Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.
| Digital Realty Trust | Applied Digital | ASM International | |
|---|---|---|---|
| Moat rating | narrow The FY2025 10-K's own competitive record cuts both ways. Item 1 says a "high-quality, highly interconnected global portfolio such as ours could not be easily replicated today on a cost-competitive basis," yet Item 1A concedes that competitors have "significantly greater financial, marketing and other resources and more ready access to capital" and that as rivals keep developing space, "rental rates may be reduced or we may face delays in leasing." A durable advantage that its own filing says new supply can price against is bounded, not unassailable. | none The FY2026 10-K (filed 2026-07-29) shows contracted revenue, not a demonstrated competitive edge. About 1,410 MW is leased under 15-year take-or-pay, non-cancellable base terms worth about $36.2 billion, but only about 100 MW of the roughly 1.5 GW that is contracted and either operating or under construction was operating and earning revenue at May 31, 2026, and Item 1A says "lessees may have the right to terminate applicable leases if there are significant delays in construction." Item 1A also concedes "We do not have the resources to compete with larger providers of similar products or services at this time," and the Competition section names 13 power-advantaged developers the company competes with. Signed leases give revenue visibility, but the filing does not show a durable advantage. | narrow The 2025 annual report (published 2026-03-12) says 'ASM is the leader in the fast-growing single-wafer ALD market – with a market share of 55%+ (ASM estimate, Investor Day 2025)'. It says ASM 'maintained leadership with our market share surpassing 55%' as the industry moved from FinFET to GAA. And it says that 'Based on the breadth of our R&D engagements and critical production-tool-of-record (PTOR) selections already secured in 2025, we expect to at least maintain our market share' into the 1.4nm node. The Q2 2026 results (https://www.asm.com/media/y0mkxj21/20260728-asm-reports-second-quarter-2026-results.pdf) say the 1.4nm node is on track for its first meaningful contribution in the second half of 2026, 'reflecting increased market share gains in both ALD and Epi'. 2025 gross margin was 51.8%. That is a strong, profitable position, but every share figure behind it is ASM's own estimate or expectation, and no independent share source supports it, so the rating is narrow rather than wide. The exposures also weigh: the five largest customers took about 53.6% of 2025 revenue and China more than 30%, and the report describes the main competitors as 'much larger companies from the United States and Asia'. |
| Moat type | network effects Item 1 attributes the hard-to-replicate part of the portfolio to connectivity rather than to real estate: "the network density, interconnection infrastructure and connectivity-centric customers in certain of our data centers have led to the organic formation of densely connected data communities that are difficult for competitors to replicate." That community sits on over 232,000 cross connects in over 55 metros, so each network and cloud that lands makes the same building worth more to the next tenant. | none The 10-K claims three advantages: power-advantaged sites (it believes securing power and interconnection ahead of demand is 'the principal constraint on new HPC capacity and a core differentiator for us from many of our competitors'), a standardized 'franchise-style' design, and hyperscaler master service and master telecom service agreements 'that are difficult to obtain.' The filing does not show any of them to be durable. Its Competition section says competition 'centers on securing and developing sites with access to large-scale, reliable, and cost-competitive power and interconnection' and names 13 power-advantaged developers going after the same leases, and Item 1A concedes it lacks the resources to compete with larger providers. Signed leases are take-or-pay and non-cancellable, so a tenant leaving for convenience owes 'the full remaining contractual value,' but that is contractual lock-in on each lease rather than a moat source, so no moat type is assigned. | intangibles ip The report grounds the ALD lead in accumulated process know-how and patents rather than unit cost: 'ASM has the broadest portfolio of ALD products with innovative ALD reactor designs. Our strength in chemistries and applications using new materials means our customers can meet advanced node technology challenges.' It also cites a LexisNexis PatentSight study finding that 'ASM holds a strong and impactful patent portfolio on its core strength of ALD as measured by both Competitive Impact and Patent Asset Index'. Switching friction reinforces this. Tools enter fabs through PTOR selection, the report notes that 'Failing a customer during a production ramp could create significant problems for them', and installed systems are supported 'with a view to having them in production 24/7 for 20+ years'. But ASM wins those PTOR slots node by node on process capability, which makes IP the primary source. |
| Leadership | co leader Item 1 claims the title of "the largest global provider of cloud- and carrier-neutral data center, colocation and interconnection solutions," but the Competition section names Equinix and NTT as operators of properties "similar to ours in some of the same metropolitan areas," plus Global Switch and regional operators abroad — a shared top tier on the company's own telling, not a solitary one. | behind The 10-K makes no leadership claim and gives no ranking or share figure. Item 1A concedes "We do not have the resources to compete with larger providers of similar products or services at this time" and that some rivals have "substantially greater liquidity and financial resources than we do." Its Competition section places APLD against established operators (Digital Realty, Equinix), hyperscalers that build their own capacity, independent developers and 13 named power-advantaged developers (IREN, Cipher Digital, TeraWulf, Hut 8, Riot, CleanSpark, HIVE, Core Scientific, Bitdeer, Galaxy Digital, Fermi, Keel Infrastructure, MARA). | co leader In single-wafer ALD, which is more than half of equipment sales, the report calls ASM 'the leader' with a 55%+ share. That share is ASM's own estimate; the Investor Day 2025 deck (https://www.asm.com/media/m3jhkm12/asm_investor_day_2025.pdf) sources it to 'ASM internal analysis and TechInsights'. With no independent share source, the band is held at co_leader rather than clear_leader. ASM does not lead every line: 'ASM has the number two share in the Epi equipment market', and in PECVD and vertical furnaces it is 'focused on niche portions of the market'. |
| Pricing power | strong FY2025 renewals signed re-priced upward in every bucket — +27.0% on greater-than-1 MW space ($146 to $186 per square foot), +4.6% on 0-1 MW ($268 to $280) and +43.0% on other ($49 to $71) — and MD&A expects average aggregate rental rates on 2026 renewals to be positive against the rates currently paid for the same space "on a GAAP basis and on a cash basis." On costs, the filing says utilities expense "is our largest expense category" and that "the vast majority of the expense is passed directly through to our customers," which it credits with significantly mitigating exposure to power-cost increases rather than removing it. The cap: Item 1A warns competitor development could still force rates down. | weak Item 1A says "Due to the limited number of hyperscalers, we expect that a limited number of customers will continue to account for a high percentage of our revenue for the foreseeable future," and that if customers' equipment usage declines or they discontinue use of its facilities, APLD "may be compelled to lower our lease prices in some instances or risk losing a significant customer." One customer was 59% of FY2026 revenue from continuing operations. Take-or-pay, non-cancellable terms protect contracted revenue over the base term, and Note 19 reports a $39.1M HPC Hosting segment profit on $385.3M of segment revenue in FY2026, but those terms are agreed with a small group of concentrated buyers. | moderate Gross margin rose from 50.5% to 51.8% in 2025 and was 51.9% in Q2 2026. But the report attributes the 2025 gain to 'a very strong mix, including a continued solid contribution from the Chinese market' and to efficiency programs, not to price. It targets a range of 47% to 51% for 2026-2030, and the Q2 2026 release expects full-year 2026 gross margin 'to be around 51%'. Buyers are concentrated: the 10 largest customers were about 72.3% of 2025 revenue, the five largest about 53.6%, and two customers each contributed more than 10% of total revenue. |
| Summary | Digital Realty rents space, power and connectivity rather than compute: at 2025 year-end its portfolio held 310 data centers and roughly 57.6 million rentable square feet across more than 55 metros in over 30 countries, about 84.7% leased, serving more than 5,000 customers. Two different businesses sit inside that footprint. The greater-than-1 MW wholesale side is a capital-and-power race — 769 MW of projects underway with 64% pre-leased, and land that "could accommodate over 3,500 megawatts of additional data center capacity" — where the 10-K names Equinix, NTT, Global Switch and "various private operators" as rivals and warns that added supply can push rents down. The colocation and interconnection side is the defended half: over 232,000 cross connects and the "densely connected data communities" Item 1 says competitors cannot easily replicate, reinforced by contracts the filing describes as generally running 5-10+ years on large deployments and by improvements "installed at our customers' expense." FY2025 leasing supports that read — renewals signed re-priced +27.0% on greater-than-1 MW space and +4.6% on 0-1 MW — while customer concentration is the offsetting exposure, with the largest customer at roughly 11.7% of annualized recurring revenue. | Applied Digital designs, builds and operates purpose-built, liquid-cooled HPC data centers, which it calls 'AI factories', and leases the capacity to CoreWeave and investment-grade hyperscalers. At May 31, 2026 its 10-K lists five campuses (Polaris Forge 1-3 and Delta Forge 1-2) with about 1,410 MW contracted under roughly 15-year take-or-pay, non-cancellable leases worth about $36.2 billion over the base terms. The filing claims three sources of advantage: it controls power-advantaged sites, it uses a standardized 'franchise-style' design built to deliver about 150 MW in about 14 to 18 months, and it holds hyperscaler master agreements that are 'difficult to obtain.' The same document shows how early the company is. About 100 MW was operating and earning revenue. One customer was 59% of FY2026 revenue from continuing operations. It competes with Digital Realty, Equinix, hyperscalers that build their own capacity and 13 named power-advantaged developers, and it concedes that it lacks the resources to compete with larger providers. Signed leases give long-dated revenue visibility, but the filing does not show a durable competitive advantage. | ASM International, headquartered in the Netherlands, makes wafer-processing equipment with a focus on deposition: single-wafer ALD, silicon epitaxy, PECVD, vertical furnaces, silicon-carbide epitaxy and, since its acquisition of Axus in December 2025, CMP. Spares & Services made up 23% of 2025 revenue. ALD is the core. It was the largest product line, 'clearly accounting for more than half of our equipment sales', and ASM estimates its single-wafer ALD share at 55%+. The report frames ALD as increasingly necessary, saying 'ALD is the only deposition technology capable of meeting the coverage and film-property requirements for complex 3D structures', and expects ALD layers to grow in GAA transistor stacks, backside-power architectures and future 4F² DRAM. Epitaxy is the second-largest line: the report says ASM holds the number two share there and lifted its leading-edge share from 12% in 2020 to 25% in 2024, both by ASM's own figures. 2025 revenue reached a record €3.2 billion at a gross margin of 51.8%; per the Q2 2026 results, Q2 2026 revenue was €1,003 million at 51.9%. The exposures are customer concentration (the five largest customers were about 53.6% of 2025 revenue), geography (Asia was 80% of revenue and China more than 30%), and export restrictions that the report says are 'impacting our ability to sell and service systems in certain jurisdictions and for certain customers'. |
| Chain position | Landlord to the AI stack — sells the space, power and interconnection that cloud, network and enterprise tenants run compute in (Oracle, IBM, Meta Platforms, AT&T, Comcast and Lumen are among the customers named in Item 1), with roughly 2.9 GW of total in-place IT capacity. | Developer and landlord of power-advantaged, liquid-cooled AI data-center capacity, leased long-term to CoreWeave and investment-grade hyperscalers. | Upstream wafer-fab-equipment supplier to logic/foundry and memory chipmakers. 'The leading-edge logic/foundry market was the main growth driver for ASM, on the back of 2nm investments' in 2025, advanced-node DRAM was the largest part of memory sales, and Asia was 80% of revenue. |
| Products (share / barrier) |
|
|
|
| Long-horizon vote | +0.17 at weight 0.20 · swarm neutral Editorial prior, not backtested. | -0.20 at weight 0.20 · swarm neutral Editorial prior, not backtested. | +0.13 at weight 0.20 · swarm neutral Editorial prior, not backtested. |