Compare moats
Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.
| Fabrinet | ServiceNow | GE Vernova | |
|---|---|---|---|
| Moat rating | narrow The FY2026 10-K grounds a real but bounded defence. On the defence side: Item 1 states that in the manufacturing services market "there are significant barriers to entry in our existing and target markets, including lengthy sales cycles, the need to demonstrate complex precision optical and electro-mechanical engineering and manufacturing capabilities to a prospective customer and the ability to protect a customer's intellectual property," and that qualification of a program "may take three to six months or longer to complete." On the limiting side, the same filing shows the protection does not reach price: gross profit was 12.0% of revenues in FY2026 against 12.1% in FY2025 and 12.4% in FY2024 even as revenue rose 35.7% to $4.64 billion, four customers each exceeded 10% of revenue (Cisco 19.9%, NVIDIA 16.3%, Nokia 10.7%, Amazon 10.5%), and "reliance on a small number of customers gives those customers substantial purchasing power and leverage in negotiating contracts with us." Sales are made on "individual purchase orders that have short lead times and are subject to revision or cancellation," so the qualified program is sticky while the contract is not. | narrow The FY2025 10-K shows RPO of $28.2 billion, up 27%; customers above $5 million of ACV at 603, 502 and 420 as of December 31 2025, 2024 and 2023; revenue of $13,278 million, up 21%; and a 98% renewal rate for three years. That rate cannot prove durability: the filing computes it excluding "changes in price or users," says it "does not reflect increased or decreased purchases," and warns "period-to-period comparison of renewal rates may not be meaningful." The company also calls its market "characterized by fragmentation, low barriers to entry." Real switching costs plus compounding large accounts support narrow; wide would need durability proof this filing lacks. | wide FY2025 10-K (filed 2026-01-29): the installed base generates approximately 25% of the world's electricity; the Power segment carries ~$94.4B of remaining performance obligations with ~1,800 of ~7,000 installed gas turbines under long-term service agreements averaging ~10 years of remaining contract life; and the filing states demand is 'exceeding available capacity' for its products — a contracted, decade-scale service annuity on proprietary installed equipment. |
| Moat type | switching costs The 10-K locates the stickiness in qualification rather than in patents or scale. Customers "do not purchase our services until they qualify the services and satisfactorily complete factory audits and vendor evaluations"; qualification "may take three to six months or longer"; production is transferred "copy-exact: the setup of a production process identical to the one used by our customer"; and the filing's own experience of changing a component source is that it "resulted in our customers or their end customers requiring requalification and validation of components, a process that can often be lengthy and has negatively impacted the timing of our revenue" — the same friction a customer would face moving the program elsewhere. The filing rules out an IP-based moat itself: "Historically, patents have not played a significant role in the protection of our proprietary rights," and any process improvement developed for a customer's product is "immediately assigned to that customer." The Thailand cost base is a genuine advantage but the filing warns it is not durable on its own — "Wage increases may impact our ability to sustain our competitive advantage and may reduce our profit margin." | switching costs The binding force is architecture and configuration. The filing describes "a multi-instance architecture that provides each customer with a dedicated application layer and database," an ITOM product that "maintains a single record of all IT configurable items," and products built to "integrate with existing workflows rather than replace them." Once that record and its integrations are configured, replacement becomes a re-platforming program — our inference, as the filing quantifies no switching cost. Not IP: it holds "over 2,000 issued U.S. and foreign patents" but is not "materially dependent on any single patent." Not network effects. | switching costs 10-K: ~1,800 gas turbines under long-term service agreements with ~10-year average remaining life, plus services agreements on ~24,000 of ~59,000 installed onshore wind turbines — service revenue is contractually tied to GE Vernova's own installed fleet; the filing adds it derives 'a sustained competitive advantage both from our IP portfolio as well as technical know-how embedded in our products and manufacturing techniques developed over decades'. |
| Leadership | co leader The leadership claim in the filing is the company's own qualitative assessment: "We believe we are a leader in manufacturing products for the optical communications market," and, on breadth of process technology, "Based on our experience with customers and our qualitative assessment of our capabilities, we believe we provide a broader array of process technologies to the optics industry than any other manufacturing services provider." The same Item 1 names a crowded field against it — "Benchmark Electronics, Inc., Celestica Inc., InnoLight Technology (Suzhou) Ltd., Jabil Inc., Sanmina Corporation, Venture Corporation Limited and Eoptolink Technology Inc., Ltd., as well as the internal manufacturing capabilities of our customers" — and no independent share ranking is given, so the record supports front-of-field standing but not sole primacy. | clear leader The call is scoped to IT service management. Apps Run The World's 2024 ITSM ranking (page dated 23 July 2025) places ServiceNow first at 44.4% share, ahead of Atlassian, BMC, GoTo and Ivanti, in an $11.4 billion market where the top ten hold 83.3%. Scale corroborates: about 8,700 customers, 29,187 employees, $13,278 million of revenue, $28.2 billion of RPO. References to "two decades partnering with enterprise customers" and process knowledge "that cannot be readily replicated" are the filing's own characterisation. Outside ITSM it is weaker: one of six Leaders in the 2025 Gartner LCAP quadrant, and tenth of ten in CRM behind Salesforce at 26.1%. | co leader 10-K opens with 'GE Vernova is a global leader in the electric power industry' and its installed base generates ~25% of world electricity, but the filing names peer-scale competitors in every segment — Siemens Energy in both Power and Electrification, Mitsubishi Power, Vestas, Hitachi Energy, Schneider Electric, ABB — so co-leader across the portfolio rather than clear leader. |
| Pricing power | weak Gross profit was 12.0% of revenues in FY2026, 12.1% in FY2025 and 12.4% in FY2024 — flat to down across three years in which revenue grew from $2.88 billion to $4.64 billion — and the FY2026 increase in gross profit is attributed to "sales volume and product mix," not price. Item 1 says so directly: "we expect the prices we charge for our manufactured products to decrease over time (partly as a result of competitive market forces)," with the offset coming from cycle-time, mix, yield and material-cost work rather than from rate. The risk factors add that customer consolidation gives buyers "increased leverage that may result in, among other things, decreases in our average selling prices," and that new competition "could result in price reductions for our services, reduced gross profit margins or loss of market share." | moderate The filing discloses no average selling price, no net revenue retention and no pricing data, and the renewal rate is no proxy — it "does not reflect increased or decreased purchases" and excludes "changes in price or users." Revenue up 21%, the $5 million-plus cohort up about 20% annually and RPO up 27% are all consistent with expansion at flat pricing. Margins cut the other way: subscription gross profit fell to 80% from 82% with no stated cause, and professional services gross loss widened to 5% from 2%. One real lever is that "certain AI and data solutions include a consumption-based pricing component." | strong 10-K: 'increasing demand exceeding available capacity', Electrification customer lead-times 'increased as a result of demand outstripping supply', and both Power and Electrification state they adjust pricing 'in line with market demand, inflation, and industry dynamics'; trade press (Power Engineering, 2026-04-23) reported new gas-turbine order pricing in H1 2026 tracking 10-20 points higher on a dollar-per-kilowatt basis than Q4 2025 orders. |
| Summary | Fabrinet is the neutral outsourced factory for complex photonics. The FY2026 10-K describes a business that wins on qualification and IP hygiene rather than on product ownership: a "factory-within-a-factory" that physically segregates each customer's engineers and floor space, copy-exact line transfers, Telcordia-grade environmental qualification, and a claim that "there is no other manufacturing services provider with a similar breadth and depth of optical and electro-mechanical engineering and process technology capabilities that does not directly compete with its customers in their end-markets." That neutrality is claimed as a belief, not demonstrated — the filing's own framing is "we believe" — and Item 1 names the field it is measured against without characterising any of them: "Benchmark Electronics, Inc., Celestica Inc., InnoLight Technology (Suzhou) Ltd., Jabil Inc., Sanmina Corporation, Venture Corporation Limited and Eoptolink Technology Inc., Ltd., as well as the internal manufacturing capabilities of our customers." Once a program is qualified it tends to stay, and "in many cases, we are the sole outsourced manufacturing partner used by our customers for the products that we manufacture for them." What the moat does not buy is margin. Revenue grew 35.7% in FY2026 to $4.64 billion on the AI-datacenter build-out — data center products are now 47.9% of revenue — yet gross margin slipped to 12.0%, and Item 1 concedes the company expects "the prices we charge for our manufactured products to decrease over time." The two live erosion paths are named in the risk factors: customer consolidation that "may result in, among other things, decreases in our average selling prices," and customers who "acquired the capacity to manufacture products in-house." Concentration cuts both ways this year — FY2025 had two customers above 10% of revenue, FY2026 had four, so the book broadened even as its scale grew. | ServiceNow sells a workflow platform that sits on top of, rather than replaces, an enterprise's existing systems. Each customer gets a dedicated application layer and database, ITOM maintains a single record of all IT configurable items, and products integrate with existing workflows rather than replace them; once that record and its integrations span IT, HR and customer service, displacement becomes a re-platforming exercise. The evidence is in large commitments: $5 million-plus ACV customers rose from 420 to 502 to 603, and RPO reached $28.2 billion, up 27%, against $13,278 million of FY2025 revenue. The moat is bounded by a market the company itself calls fragmented with low barriers to entry, by larger rivals that can bundle or cut price, and by falling subscription gross margin, 82% to 80%. | GE Vernova's moat rests on its installed base: the FY2025 10-K states its equipment generates approximately 25% of the world's electricity, with ~7,000 installed gas turbines (~1,800 under long-term service agreements averaging ~10 years of remaining life) and ~$94.4B of Power-segment remaining performance obligations. The filing reports demand 'exceeding available capacity', lengthening Electrification lead-times 'as a result of demand outstripping supply', and pricing adjusted with demand — scarcity trade press later quantified as new gas-turbine order pricing tracking 10-20 points higher per kW in H1 2026 than Q4 2025, with only ~10 GW of production slots left across 2029-2030 (Power Engineering, 2026-04-23). The moat is not uniform: the 10-K risk section flags intensifying competition as manufacturers from China 'improve quality and reliability and pursue markets outside their home countries', and Offshore Wind is delivering its backlog under project-cost and execution pressure, compounded by the U.S. Interior Department's December 22, 2025 pause of leases for all large-scale U.S. offshore projects under construction, which directly impacted the Vineyard Wind timeline. Nuclear adds optionality: the 10-K cites an SMR deployment agreement it calls 'the first commercial contract of its kind in North America' via its joint ventures with Hitachi. |
| Chain position | A contract manufacturer sitting between optical components and the network and AI-datacenter OEMs whose brands ship the finished box. FY2026 revenue is 47.9% data center, 33.3% communications infrastructure and 18.8% automotive, industrial and other markets (FY2025: 46.2% / 30.7% / 23.1%), with Cisco, NVIDIA, Nokia and Amazon each above 10% of revenue. Fabrinet also integrates one layer down, designing and fabricating its own customized optics and glass — crystals, ferrules, precision glass tubing — at Fuzhou, China and Mountain Lakes, New Jersey, both for its own assemblies and for the merchant market, while volume manufacturing runs from the Pinehurst and Chonburi campuses in Thailand. | Enterprise workflow platform layered on top of customers' existing systems of record. It consumes public cloud capacity (named relationships with AWS, Google, Microsoft and NVIDIA) plus its own data centers, and reaches customers through a direct sales force, global system integrators (Accenture, Deloitte, EY, Infosys, KPMG) and resale partners. Microsoft is named as both partner and competitor. | Power supplier to the AI buildout: the 10-K states gas power serves 'rising electricity demand from hyperscalers and data centers' and Electrification benefits from orders to electrify data centers 'playing a key role in the development of artificial intelligence (AI)'; trade press (Power Engineering, 2026-04-23) put roughly 20% of the ~100 GW of gas capacity under contract as explicitly tied to data-center load. |
| Products (share / barrier) |
|
|
|
| Long-horizon vote | +0.05 at weight 0.20 · swarm neutral Editorial prior, not backtested. | +0.20 at weight 0.20 · swarm neutral Editorial prior, not backtested. | +0.35 at weight 0.20 · swarm bullish Editorial prior, not backtested. |