Compare moats
Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.
| Hut 8 | Applied Digital | Datadog | |
|---|---|---|---|
| Moat rating | narrow The FY2025 10-K says 'we believe we have established a defensible competitive advantage through our power-first, innovation-driven strategy', resting on a power-native team, an application-agnostic framework for digital infrastructure design, end-to-end greenfield development capabilities, and the use of ASIC compute builds to rapidly and cost-effectively secure and monetize power. What separates this from no moat is scarce power: the filing says demand for energy capacity continues to outpace supply and that 'grid interconnection bottlenecks have further constrained access to power and digital infrastructure development', and Hut 8 reports 330 MW of utility capacity under construction at River Bend, commercialized in December 2025 through a 15-year triple-net lease supporting 245 MW of IT capacity, plus 1,230 MW of utility capacity under development. The same filing says 'The industries in which we operate are highly competitive and continuously evolving.', warns that these factors 'might not provide the competitive advantage we anticipate, or if they do, such competitive advantage might not endure', cites the River Bend lease (valued at $7.0 billion over the base term) as an example of expecting a significant portion of revenue from a limited number of customers, and says the company has not maintained consistent profitability. That supports narrow at most, not wide. | none The FY2026 10-K (filed 2026-07-29) shows contracted revenue, not a demonstrated competitive edge. About 1,410 MW is leased under 15-year take-or-pay, non-cancellable base terms worth about $36.2 billion, but only about 100 MW of the roughly 1.5 GW that is contracted and either operating or under construction was operating and earning revenue at May 31, 2026, and Item 1A says "lessees may have the right to terminate applicable leases if there are significant delays in construction." Item 1A also concedes "We do not have the resources to compete with larger providers of similar products or services at this time," and the Competition section names 13 power-advantaged developers the company competes with. Signed leases give revenue visibility, but the filing does not show a durable advantage. | narrow The FY2025 10-K grounds real stickiness — a trailing-12-month dollar-based net retention rate of "about 120%" as of December 31, 2025 and "approximately 84% of our customers were using two or more products" out of approximately 32,700 customers — but the same filing caps it. It names IBM, Microsoft and SolarWinds (on-premise infrastructure monitoring), Cisco, New Relic and Dynatrace (APM), Cisco and Elastic (log management) and "native solutions from cloud providers such as Amazon Web Services, or AWS, Microsoft Azure, and Google Cloud Platform" as competitors, plus "home-grown and open-source technologies", and concedes "many of our competitors have greater financial, technical and other resources, greater brand recognition, larger sales forces and marketing budgets". It further discloses an AI-native cohort "which cohort includes our largest customer and represented approximately seven percentage points of our year-over-year revenue growth for the quarter ended December 31, 2025" whose members "have rapidly increased their usage of our product and then optimized or may in the future optimize their usage". Sticky but bounded: narrow, not wide. |
| Moat type | cost scale The 10-K says 'we believe success depends on the ability to secure scarce assets like power, data center equipment, and customers', and places part of its claimed edge in 'our ability to use ASIC compute infrastructure development to rapidly and cost-effectively secure and monetize power'. Its examples: Vega was energized less than a year after acquisition for an all-in cost of about $455,000 per megawatt, which the filing calls 'a fraction of traditional data center costs', and Salt Creek was completed for about $250,000 per MW; Vega also has immediate access to some of the lowest locational wholesale power prices in North America. These are low-redundancy ASIC compute builds, which the 10-K says carry relatively low capital intensity by design. The 'fraction of traditional data center costs' comparison is against a different facility tier, and the filing gives no peer cost comparison and no cost figure for its AI campuses. | none The 10-K claims three advantages: power-advantaged sites (it believes securing power and interconnection ahead of demand is 'the principal constraint on new HPC capacity and a core differentiator for us from many of our competitors'), a standardized 'franchise-style' design, and hyperscaler master service and master telecom service agreements 'that are difficult to obtain.' The filing does not show any of them to be durable. Its Competition section says competition 'centers on securing and developing sites with access to large-scale, reliable, and cost-competitive power and interconnection' and names 13 power-advantaged developers going after the same leases, and Item 1A concedes it lacks the resources to compete with larger providers. Signed leases are take-or-pay and non-cancellable, so a tenant leaving for convenience owes 'the full remaining contractual value,' but that is contractual lock-in on each lease rather than a moat source, so no moat type is assigned. | switching costs The 10-K locates the durable hold in platform integration rather than protected IP. A single agent collects "metrics, traces, logs, and other data"; under "One Data Model" every ingested datum is "consistently tagged with metadata regardless of its type", so different data types can be "queried together, correlated, alerted on, and visualized in a common user interface"; more than 1,000 out-of-the-box integrations bind it to the customer's stack; and the attach ladder deepens (approximately 84% of customers on two or more products, 55% on four or more, 33% on six or more and 18% on eight or more as of December 31, 2025). Displacing Datadog means re-instrumenting an estate the filing describes as "frequently deployed across a customer's entire infrastructure, making it ubiquitous". |
| Leadership | fast follower The 10-K says 'For example, we signed our first large scale single tenant AI data center lease and commenced construction of the site at our River Bend campus.', offered under the statement that to remain competitive with peers it may need to modify aspects of its business model. River Bend was commercialized in December 2025 through a 15-year triple-net lease supporting 245 MW of IT capacity; Fluidstack is expected to serve as tenant and Google is expected to provide a financial backstop, and initial delivery is targeted for Q2 2027. On speed, the filing says 'Through early engagement with Entergy Louisiana, we assumed key interconnection and development functions typically managed by the utility, such as the development of transmission and distribution infrastructure, materially accelerating originally quoted power delivery timelines.', and that Vega was energized 'less than a year after acquiring it'. It also warns that Hut 8 competes against companies 'that may be more established or have greater financial and other resources and/or expertise'. That describes a newer entrant moving quickly, not an established leader. | behind The 10-K makes no leadership claim and gives no ranking or share figure. Item 1A concedes "We do not have the resources to compete with larger providers of similar products or services at this time" and that some rivals have "substantially greater liquidity and financial resources than we do." Its Competition section places APLD against established operators (Digital Realty, Equinix), hyperscalers that build their own capacity, independent developers and 13 named power-advantaged developers (IREN, Cipher Digital, TeraWulf, Hut 8, Riot, CleanSpark, HIVE, Core Scientific, Bitdeer, Galaxy Digital, Fermi, Keel Infrastructure, MARA). | co leader The 10-K claims only that "We believe that we compete favorably with respect to the factors listed above" — never category leadership — and names a distinct credible rival set in each category it serves, while conceding many of those rivals have greater resources and brand recognition. It does claim one first: being "the first to combine the 'three pillars of observability' - metrics, traces, and logs - into a single end-to-end platform" with log management in 2018. That reads as the leading independent among several credible rivals, not a clear leader. |
| Pricing power | weak The 10-K says ASIC compute, run through American Bitcoin, can only be profitable if hardware and electricity costs are below the price of the Bitcoin mined, which makes it a price-taking business. It also says Traditional Cloud and AI Cloud compete with cloud services providers for customers, and that the company has not maintained consistent profitability. River Bend's contracted triple-net lease economics are not in service yet; initial delivery is targeted for Q2 2027. | weak Item 1A says "Due to the limited number of hyperscalers, we expect that a limited number of customers will continue to account for a high percentage of our revenue for the foreseeable future," and that if customers' equipment usage declines or they discontinue use of its facilities, APLD "may be compelled to lower our lease prices in some instances or risk losing a significant customer." One customer was 59% of FY2026 revenue from continuing operations. Take-or-pay, non-cancellable terms protect contracted revenue over the base term, and Note 19 reports a $39.1M HPC Hosting segment profit on $385.3M of segment revenue in FY2026, but those terms are agreed with a small group of concentrated buyers. | moderate Expansion is real but volume-driven rather than price-driven. The 10-K attributes the increase in trailing-12-month dollar-based net retention to about 120% (from "high-110%'s" a year earlier) to "increased usage growth from existing customers", and describes self-service expansion by "adding hosts or volumes of data monitored". The same filing warns that if customers "reduce their usage, fail to renew their subscriptions or renew on different terms", then "our revenue and dollar-based net retention may decline" — a usage-metered model hands the customer a dial that seat-based pricing does not. |
| Summary | Per its FY2025 10-K, Hut 8 is a power-first infrastructure developer. It originates powered land and interconnections, uses ASIC compute builds, which the filing says combine relatively low capital intensity with rapid deployment, as a transitional load to monetize sites sooner, and aims to transition suitable power assets to higher-return uses; its River Bend campus was commercialized through a 15-year AI data center lease. The filing claims a defensible advantage but warns it might not provide the advantage anticipated, or might not endure. It says Hut 8 competes for powered land with digital infrastructure developers and large-scale Bitcoin miners, and its first AI campus is still under construction. Its majority-owned Bitcoin miner, American Bitcoin, can only be profitable when mining costs are below the price of the Bitcoin mined, and the filing says it believes American Bitcoin must keep acquiring miners to keep up with a growing global network hashrate. | Applied Digital designs, builds and operates purpose-built, liquid-cooled HPC data centers, which it calls 'AI factories', and leases the capacity to CoreWeave and investment-grade hyperscalers. At May 31, 2026 its 10-K lists five campuses (Polaris Forge 1-3 and Delta Forge 1-2) with about 1,410 MW contracted under roughly 15-year take-or-pay, non-cancellable leases worth about $36.2 billion over the base terms. The filing claims three sources of advantage: it controls power-advantaged sites, it uses a standardized 'franchise-style' design built to deliver about 150 MW in about 14 to 18 months, and it holds hyperscaler master agreements that are 'difficult to obtain.' The same document shows how early the company is. About 100 MW was operating and earning revenue. One customer was 59% of FY2026 revenue from continuing operations. It competes with Digital Realty, Equinix, hyperscalers that build their own capacity and 13 named power-advantaged developers, and it concedes that it lacks the resources to compete with larger providers. Signed leases give long-dated revenue visibility, but the filing does not show a durable competitive advantage. | Datadog's advantage is consolidation, not exclusivity. Per the FY2025 10-K it runs a modular platform of "over 20 products" fed by one agent and one tagged data model, deployed across a customer's whole estate with more than 1,000 integrations — so each additional product adopted makes the estate costlier to unwind, which shows up as roughly 120% dollar-based net retention and a multi-product attach ladder that thickened at every rung during 2025. What holds the rating at narrow rather than wide is that the filing itself names hyperscaler-native monitoring and open-source tooling as direct substitutes in the same categories, and flags an AI-native cohort including its largest customer that can optimize usage down as quickly as it ramped up. |
| Chain position | Power-first developer building AI data center capacity, beginning with River Bend under a 15-year lease (Fluidstack is the expected tenant and Google is expected to provide a financial backstop; initial delivery is targeted for Q2 2027), and runs Bitcoin mining through majority-owned American Bitcoin. | Developer and landlord of power-advantaged, liquid-cooled AI data-center capacity, leased long-term to CoreWeave and investment-grade hyperscalers. | A software layer above the cloud rather than a supplier into it: the 10-K describes the platform as "cloud agnostic", deployable across "public cloud, private cloud, on-premise, multi-cloud, and hybrid environments", and monetizes the AI build-out through LLM Observability, which traces LLM chains and correlates them with APM. |
| Products (share / barrier) |
|
|
|
| Long-horizon vote | -0.01 at weight 0.20 · swarm neutral Editorial prior, not backtested. | -0.20 at weight 0.20 · swarm neutral Editorial prior, not backtested. | +0.13 at weight 0.20 · swarm neutral Editorial prior, not backtested. |