Skip to content

Compare moats

Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.

comparing Hut 8×Applied Digital×TE Connectivity× maximum of 3 — remove one to swap
Hut 8 HUT ai moat: latest change 2026-02-25 Applied Digital APLD ai moat: latest change 2026-07-29 TE Connectivity TEL ai moat: latest change 2025-11-10
Moat rating narrow

The FY2025 10-K says 'we believe we have established a defensible competitive advantage through our power-first, innovation-driven strategy', resting on a power-native team, an application-agnostic framework for digital infrastructure design, end-to-end greenfield development capabilities, and the use of ASIC compute builds to rapidly and cost-effectively secure and monetize power. What separates this from no moat is scarce power: the filing says demand for energy capacity continues to outpace supply and that 'grid interconnection bottlenecks have further constrained access to power and digital infrastructure development', and Hut 8 reports 330 MW of utility capacity under construction at River Bend, commercialized in December 2025 through a 15-year triple-net lease supporting 245 MW of IT capacity, plus 1,230 MW of utility capacity under development. The same filing says 'The industries in which we operate are highly competitive and continuously evolving.', warns that these factors 'might not provide the competitive advantage we anticipate, or if they do, such competitive advantage might not endure', cites the River Bend lease (valued at $7.0 billion over the base term) as an example of expecting a significant portion of revenue from a limited number of customers, and says the company has not maintained consistent profitability. That supports narrow at most, not wide.

source: sec.gov

none

The FY2026 10-K (filed 2026-07-29) shows contracted revenue, not a demonstrated competitive edge. About 1,410 MW is leased under 15-year take-or-pay, non-cancellable base terms worth about $36.2 billion, but only about 100 MW of the roughly 1.5 GW that is contracted and either operating or under construction was operating and earning revenue at May 31, 2026, and Item 1A says "lessees may have the right to terminate applicable leases if there are significant delays in construction." Item 1A also concedes "We do not have the resources to compete with larger providers of similar products or services at this time," and the Competition section names 13 power-advantaged developers the company competes with. Signed leases give revenue visibility, but the filing does not show a durable advantage.

source: sec.gov

narrow

The FY2025 10-K's own Competition section undercuts any claim of insulation: 'The industries in which we operate are highly competitive, and we compete with thousands of companies that range from large multinational corporations to local manufacturers', competition is 'generally based on breadth of product offering, product innovation, price, quality, delivery, and service', and TE has 'experienced, and expect[s] to continue to experience, downward pressure on prices'. The same filing explicitly disclaims IP as the basis of its position: 'we do not believe that our competitive position or our operations are dependent upon or would be materially impacted by any single patent or group of related patents.' What TE does hold is durable rather than absolute — it calls itself 'one of the leading providers of advanced automobile connectivity solutions', its Industrial segment 'a leading supplier', and it converted that position into rising profitability across the same filing's three income statements (gross margin 31.5% of net sales in FY2023, 34.4% in FY2024, 35.2% in FY2025). A position that earns expanding margins into admitted price pressure is an advantage; one held against thousands of competitors and no decisive patent is not a wide one.

source: sec.gov

Moat type cost scale

The 10-K says 'we believe success depends on the ability to secure scarce assets like power, data center equipment, and customers', and places part of its claimed edge in 'our ability to use ASIC compute infrastructure development to rapidly and cost-effectively secure and monetize power'. Its examples: Vega was energized less than a year after acquisition for an all-in cost of about $455,000 per megawatt, which the filing calls 'a fraction of traditional data center costs', and Salt Creek was completed for about $250,000 per MW; Vega also has immediate access to some of the lowest locational wholesale power prices in North America. These are low-redundancy ASIC compute builds, which the 10-K says carry relatively low capital intensity by design. The 'fraction of traditional data center costs' comparison is against a different facility tier, and the filing gives no peer cost comparison and no cost figure for its AI campuses.

source: sec.gov

none

The 10-K claims three advantages: power-advantaged sites (it believes securing power and interconnection ahead of demand is 'the principal constraint on new HPC capacity and a core differentiator for us from many of our competitors'), a standardized 'franchise-style' design, and hyperscaler master service and master telecom service agreements 'that are difficult to obtain.' The filing does not show any of them to be durable. Its Competition section says competition 'centers on securing and developing sites with access to large-scale, reliable, and cost-competitive power and interconnection' and names 13 power-advantaged developers going after the same leases, and Item 1A concedes it lacks the resources to compete with larger providers. Signed leases are take-or-pay and non-cancellable, so a tenant leaving for convenience owes 'the full remaining contractual value,' but that is contractual lock-in on each lease rather than a moat source, so no moat type is assigned.

source: sec.gov

switching costs

The FY2025 10-K locates the advantage at the customer, not in patents. It describes 'close working relationships with many of our customers' whose 'relationships with them typically date back many years', and co-development as the mechanism: 'By working with our customers in developing new products and technologies, we believe we can identify and act on trends and leverage knowledge about next-generation technology across our products.' Roughly 75% of fiscal 2025 net sales were direct to manufacturers rather than through distribution, and the Transportation segment's products 'must withstand harsh conditions' — parts engineered in with the customer and built to survive the application, so the position sits inside the customer's design rather than in a purchase order. The filing rules the alternative out in its own words on intellectual property, so intangibles_ip is not the source; the 'thousands of companies' in Competition rules out efficient_scale.

source: sec.gov

Leadership fast follower

The 10-K says 'For example, we signed our first large scale single tenant AI data center lease and commenced construction of the site at our River Bend campus.', offered under the statement that to remain competitive with peers it may need to modify aspects of its business model. River Bend was commercialized in December 2025 through a 15-year triple-net lease supporting 245 MW of IT capacity; Fluidstack is expected to serve as tenant and Google is expected to provide a financial backstop, and initial delivery is targeted for Q2 2027. On speed, the filing says 'Through early engagement with Entergy Louisiana, we assumed key interconnection and development functions typically managed by the utility, such as the development of transmission and distribution infrastructure, materially accelerating originally quoted power delivery timelines.', and that Vega was energized 'less than a year after acquiring it'. It also warns that Hut 8 competes against companies 'that may be more established or have greater financial and other resources and/or expertise'. That describes a newer entrant moving quickly, not an established leader.

source: sec.gov

behind

The 10-K makes no leadership claim and gives no ranking or share figure. Item 1A concedes "We do not have the resources to compete with larger providers of similar products or services at this time" and that some rivals have "substantially greater liquidity and financial resources than we do." Its Competition section places APLD against established operators (Digital Realty, Equinix), hyperscalers that build their own capacity, independent developers and 13 named power-advantaged developers (IREN, Cipher Digital, TeraWulf, Hut 8, Riot, CleanSpark, HIVE, Core Scientific, Bitdeer, Galaxy Digital, Fermi, Keel Infrastructure, MARA).

source: sec.gov

co leader

The FY2025 10-K claims leadership in qualified form and then names the peers who contest it. Transportation Solutions 'is a leader in connectivity and sensor technologies' and TE is 'one of the leading providers of advanced automobile connectivity solutions' — one of, not the — while the segment's 'major competitors include Yazaki, Aptiv, Sumitomo, Sensata, Honeywell, Molex, and Amphenol'. Industrial Solutions 'is a leading supplier of products that connect and distribute power, data, and signals' and 'competes primarily against Amphenol, Hubbell, Carlisle Companies, Integer Holdings, Molex, Omron, JST, and Korea Electric Terminal (KET)'. Amphenol and Molex appear on both lists, so TE shares the top of the interconnect market rather than owning it.

source: sec.gov

Pricing power weak

The 10-K says ASIC compute, run through American Bitcoin, can only be profitable if hardware and electricity costs are below the price of the Bitcoin mined, which makes it a price-taking business. It also says Traditional Cloud and AI Cloud compete with cloud services providers for customers, and that the company has not maintained consistent profitability. River Bend's contracted triple-net lease economics are not in service yet; initial delivery is targeted for Q2 2027.

source: sec.gov

weak

Item 1A says "Due to the limited number of hyperscalers, we expect that a limited number of customers will continue to account for a high percentage of our revenue for the foreseeable future," and that if customers' equipment usage declines or they discontinue use of its facilities, APLD "may be compelled to lower our lease prices in some instances or risk losing a significant customer." One customer was 59% of FY2026 revenue from continuing operations. Take-or-pay, non-cancellable terms protect contracted revenue over the base term, and Note 19 reports a $39.1M HPC Hosting segment profit on $385.3M of segment revenue in FY2026, but those terms are agreed with a small group of concentrated buyers.

source: sec.gov

moderate

The FY2025 10-K states both halves plainly: TE has 'experienced, and expect[s] to continue to experience, downward pressure on prices. However, as a result of increased costs and tariffs, certain of our businesses implemented price increases in recent years.' Pass-through, not price-setting. The realised result is margin expansion rather than erosion — gross margin of 31.5% of net sales in FY2023, 34.4% in FY2024 and 35.2% in FY2025 per the same filing's income statements, and 36.5% ($5,319M on $14,573M) for the nine months to 26 June 2026 versus 35.3% a year earlier, with Q3 FY2026 GAAP operating margin of 19%, per the 22 July 2026 results release (https://www.sec.gov/Archives/edgar/data/1385157/000110465926085589/tel-20260722xex99d1.htm). Strong would require pricing that leads rather than follows cost; weak is contradicted by three years of expanding gross margin.

source: sec.gov

Summary

Per its FY2025 10-K, Hut 8 is a power-first infrastructure developer. It originates powered land and interconnections, uses ASIC compute builds, which the filing says combine relatively low capital intensity with rapid deployment, as a transitional load to monetize sites sooner, and aims to transition suitable power assets to higher-return uses; its River Bend campus was commercialized through a 15-year AI data center lease. The filing claims a defensible advantage but warns it might not provide the advantage anticipated, or might not endure. It says Hut 8 competes for powered land with digital infrastructure developers and large-scale Bitcoin miners, and its first AI campus is still under construction. Its majority-owned Bitcoin miner, American Bitcoin, can only be profitable when mining costs are below the price of the Bitcoin mined, and the filing says it believes American Bitcoin must keep acquiring miners to keep up with a growing global network hashrate.

Applied Digital designs, builds and operates purpose-built, liquid-cooled HPC data centers, which it calls 'AI factories', and leases the capacity to CoreWeave and investment-grade hyperscalers. At May 31, 2026 its 10-K lists five campuses (Polaris Forge 1-3 and Delta Forge 1-2) with about 1,410 MW contracted under roughly 15-year take-or-pay, non-cancellable leases worth about $36.2 billion over the base terms. The filing claims three sources of advantage: it controls power-advantaged sites, it uses a standardized 'franchise-style' design built to deliver about 150 MW in about 14 to 18 months, and it holds hyperscaler master agreements that are 'difficult to obtain.' The same document shows how early the company is. About 100 MW was operating and earning revenue. One customer was 59% of FY2026 revenue from continuing operations. It competes with Digital Realty, Equinix, hyperscalers that build their own capacity and 13 named power-advantaged developers, and it concedes that it lacks the resources to compete with larger providers. Signed leases give long-dated revenue visibility, but the filing does not show a durable competitive advantage.

TE Connectivity sells the connectors, terminals, sensors and cable-protection parts that, in its own framing, 'enable the distribution of power, signal, and data' — a component vendor, never a system or compute vendor. The FY2025 10-K puts the two reportable segments, Transportation Solutions (54% of net sales) and Industrial Solutions (46%), against a combined served market it estimates at roughly $200 billion, which tells you immediately that no single share number governs this business: the filing discloses no market share, says 'no single customer accounted for a significant amount of our net sales in fiscal 2025, 2024, or 2023', and states that because TE is 'not organized by product or service, it is not practicable to disclose net sales by product or service'. The defensible part is entrenchment. Parts get designed in with the customer and then qualified to survive automotive, aerospace, subsea and grid conditions; TE sells about 75% of net sales direct into ~130 countries; relationships 'typically date back many years'. That is a switching-cost moat, and the filing is unusually candid that it is not a patent moat — no single patent or group of patents is material to its competitive position. The limit is equally plain in the filing: highly competitive industries, thousands of competitors, and persistent downward price pressure, with Amphenol and Molex named as competitors in BOTH segments and Yazaki, Aptiv and Sumitomo heading the Transportation segment's competitor list. The evidence that the moat is nonetheless working is margin plus mix. Gross margin ran 31.5% / 34.4% / 35.2% of net sales across FY2023-FY2025, and in the nine months to 26 June 2026 gross margin was $5,319M on $14,573M of net sales (36.5%) against $4,419M on $12,513M (35.3%) a year earlier, while Q3 FY2026 GAAP operating margin was 19% and orders hit a record $5.7 billion, up 27% year over year. Growth has also rotated: digital data networks grew 34.2% in Q3 FY2026 (34.0% organic) and 48.8% over nine months, with the CEO naming 'increased momentum in AI in both the data center and across the broader energy infrastructure' — while sensors, an end market for which the 10-K makes no leadership claim at all, shrank 2.8% organically in the quarter. Narrow, not wide: a real toll on other people's platforms, collected under admitted price pressure.

Chain position

Power-first developer building AI data center capacity, beginning with River Bend under a 15-year lease (Fluidstack is the expected tenant and Google is expected to provide a financial backstop; initial delivery is targeted for Q2 2027), and runs Bitcoin mining through majority-owned American Bitcoin.

Developer and landlord of power-advantaged, liquid-cooled AI data-center capacity, leased long-term to CoreWeave and investment-grade hyperscalers.

TE is an upstream component supplier to the AI build-out, not a participant in compute. It sells 'connectivity and sensor solutions [that] enable the distribution of power, signal, and data to advance next-generation transportation, energy networks, automated factories, data centers enabling artificial intelligence', about 75% of it direct to manufacturers across roughly 130 countries. AI exposure runs through one end market: digital data networks was 28% of Industrial Solutions, and Industrial Solutions was 46% of fiscal 2025 net sales — so the datacenter line is a minority of a company still 54% transportation. That minority is where the growth now is: digital data networks net sales rose 34.2% in Q3 FY2026 and 48.8% over the nine months, and energy rose 34.4% in the quarter, the CEO tying both to AI momentum 'in both the data center and across the broader energy infrastructure' (https://www.sec.gov/Archives/edgar/data/1385157/000110465926085589/tel-20260722xex99d1.htm).

Products (share / barrier)
  • Blockchain data center hosting (Jamestown / Ellendale) Niche · Low source: sec.gov
  • HPC data center leasing (Polaris Forge / Delta Forge AI factories) Challenger · Moderate source: sec.gov
Long-horizon vote -0.01 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

-0.20 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

+0.13 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →