Skip to content

Compare moats

Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.

comparing IBM×Hut 8×Cisco Systems× maximum of 3 — remove one to swap
IBM IBM ai moat: latest change 2026-02-24 Hut 8 HUT ai moat: latest change 2026-02-25 Cisco Systems CSCO ai moat: latest change 2025-09-03
Moat rating narrow

IBM's FY2025 10-K describes "a highly competitive environment" with "hundreds of competitors" and says IBM is "regularly exposed to new competitors" as it executes its hybrid-cloud/AI strategy, while differentiating through "incumbency with enterprises" and "client relationships and trust" — a real but narrow moat, not a wide one.

source: sec.gov

narrow

The FY2025 10-K says 'we believe we have established a defensible competitive advantage through our power-first, innovation-driven strategy', resting on a power-native team, an application-agnostic framework for digital infrastructure design, end-to-end greenfield development capabilities, and the use of ASIC compute builds to rapidly and cost-effectively secure and monetize power. What separates this from no moat is scarce power: the filing says demand for energy capacity continues to outpace supply and that 'grid interconnection bottlenecks have further constrained access to power and digital infrastructure development', and Hut 8 reports 330 MW of utility capacity under construction at River Bend, commercialized in December 2025 through a 15-year triple-net lease supporting 245 MW of IT capacity, plus 1,230 MW of utility capacity under development. The same filing says 'The industries in which we operate are highly competitive and continuously evolving.', warns that these factors 'might not provide the competitive advantage we anticipate, or if they do, such competitive advantage might not endure', cites the River Bend lease (valued at $7.0 billion over the base term) as an example of expecting a significant portion of revenue from a limited number of customers, and says the company has not maintained consistent profitability. That supports narrow at most, not wide.

source: sec.gov

narrow

The FY2025 10-K shows a moat that still pays but no longer compounds: total gross margin of 64.9% and remaining performance obligations of $43,533 million (up 6%) against a Networking product category that fell from $34,570 million in fiscal 2023 to $29,229 million in fiscal 2024 to $28,304 million in fiscal 2025, and a product gross-margin bridge in which 'Product pricing' subtracted 1.6 percentage points. All of the reported category growth came from Splunk-carrying lines - Security +59% and Observability +26%. Real and durable, but bounded: narrow, not wide.

source: sec.gov

Moat type switching costs

The 10-K roots IBM's differentiation in "incumbency with enterprises" and "client relationships and trust" — installed-base lock-in across its hybrid-cloud platform (Red Hat) and enterprise software and infrastructure raises switching costs.

source: sec.gov

cost scale

The 10-K says 'we believe success depends on the ability to secure scarce assets like power, data center equipment, and customers', and places part of its claimed edge in 'our ability to use ASIC compute infrastructure development to rapidly and cost-effectively secure and monetize power'. Its examples: Vega was energized less than a year after acquisition for an all-in cost of about $455,000 per megawatt, which the filing calls 'a fraction of traditional data center costs', and Salt Creek was completed for about $250,000 per MW; Vega also has immediate access to some of the lowest locational wholesale power prices in North America. These are low-redundancy ASIC compute builds, which the 10-K says carry relatively low capital intensity by design. The 'fraction of traditional data center costs' comparison is against a different facility tier, and the filing gives no peer cost comparison and no cost figure for its AI campuses.

source: sec.gov

switching costs

The durable piece is the contracted annuity attached to installed equipment: total remaining performance obligations of $43,533 million, of which $21,961 million is services and $21,810 million is long-term (recognised beyond twelve months), carried at a services gross margin of 68.5% that has risen for three consecutive years from 66.4% and 68.1%. Customers keep paying for support on gear they already run.

source: sec.gov

Leadership fast follower

An enterprise incumbent that differentiates via "incumbency with enterprises" but is "regularly exposed to new competitors" in its hybrid-cloud/AI push (FY2025 10-K) — a follower in the current AI cycle rather than its leader.

source: sec.gov

fast follower

The 10-K says 'For example, we signed our first large scale single tenant AI data center lease and commenced construction of the site at our River Bend campus.', offered under the statement that to remain competitive with peers it may need to modify aspects of its business model. River Bend was commercialized in December 2025 through a 15-year triple-net lease supporting 245 MW of IT capacity; Fluidstack is expected to serve as tenant and Google is expected to provide a financial backstop, and initial delivery is targeted for Q2 2027. On speed, the filing says 'Through early engagement with Entergy Louisiana, we assumed key interconnection and development functions typically managed by the utility, such as the development of transmission and distribution infrastructure, materially accelerating originally quoted power delivery timelines.', and that Vega was energized 'less than a year after acquiring it'. It also warns that Hut 8 competes against companies 'that may be more established or have greater financial and other resources and/or expertise'. That describes a newer entrant moving quickly, not an established leader.

source: sec.gov

co leader

The 10-K names no competitor and discloses no market share anywhere in Management's Discussion and Analysis. The positional facts it does give are scale and direction: Networking product revenue of $28,304 million in fiscal 2025 - by far the largest of its four categories - but down $6.3 billion from fiscal 2023, with channel partner financing volume falling from $32.1 billion to $27.1 billion to $24.9 billion across fiscal 2023-2025.

source: sec.gov

Pricing power moderate

Gross margin is high and rising (54.9% FY2021 to 58.2% FY2025) on a software-mix shift, but "price" is a principal method of competition per the 10-K and consulting/infrastructure remain price-competitive.

source: sec.gov

weak

The 10-K says ASIC compute, run through American Bitcoin, can only be profitable if hardware and electricity costs are below the price of the Bitcoin mined, which makes it a price-taking business. It also says Traditional Cloud and AI Cloud compete with cloud services providers for customers, and that the company has not maintained consistent profitability. River Bend's contracted triple-net lease economics are not in service yet; initial delivery is targeted for Q2 2027.

source: sec.gov

moderate

The product gross-margin bridge attributes fiscal 2025's 0.2-point improvement to productivity (+2.0 points) and mix (+1.1 points) while 'Product pricing' subtracted 1.6 points; a legal dispute with a supplier cost a further 0.8 points. Total gross margin of 64.9% (product 63.7%, services 68.5%) is held by cost and mix, not by price.

source: sec.gov

Summary

IBM's moat rests on deep enterprise incumbency — sticky installed-base relationships across hybrid cloud (Red Hat), enterprise software, and mission-critical infrastructure, plus brand and a large patent base. But its own FY2025 10-K frames "a highly competitive environment" with "hundreds of competitors" and says IBM is "regularly exposed to new competitors" as it pursues hybrid cloud and AI, so the moat is durable but narrow and contested in the AI/cloud growth arena.

Per its FY2025 10-K, Hut 8 is a power-first infrastructure developer. It originates powered land and interconnections, uses ASIC compute builds, which the filing says combine relatively low capital intensity with rapid deployment, as a transitional load to monetize sites sooner, and aims to transition suitable power assets to higher-return uses; its River Bend campus was commercialized through a 15-year AI data center lease. The filing claims a defensible advantage but warns it might not provide the advantage anticipated, or might not endure. It says Hut 8 competes for powered land with digital infrastructure developers and large-scale Bitcoin miners, and its first AI campus is still under construction. Its majority-owned Bitcoin miner, American Bitcoin, can only be profitable when mining costs are below the price of the Bitcoin mined, and the filing says it believes American Bitcoin must keep acquiring miners to keep up with a growing global network hashrate.

The installed base still switches slowly - but the filing does not claim it is winning the AI datacenter on the strength of that base. The fiscal 2025 Networking decline is attributed to 'product shipments returning to normalized levels during the first half of fiscal 2025 from the elevated levels ... in the first half of fiscal 2024', to servers, and to 'a decline in campus switching' - normalisation, not disclosed share loss, so the whitebox/Arista thesis is not something this 10-K either confirms or denies. What the filing does disclose is the shape of the AI dollar Cisco is actually winning: Americas service provider and cloud growth 'driven by AI infrastructure revenue from webscale customers', funded by additional purchase commitments 'related to manufacturing Cisco Silicon One and other products to meet demand from webscale and other customers', which 'significantly increased our supply chain exposure, which has resulted in negative impacts to our product gross margin in recent periods and may result in further negative impacts in future periods'. Enterprise switching earns 63.7% product gross margin; webscale silicon costs margin to serve. The moat is intact where the annuity is and thin where the growth is.

Chain position

A hybrid-cloud platform, enterprise-AI (watsonx), and consulting provider to large enterprises — a software/cloud layer of the AI stack.

Power-first developer building AI data center capacity, beginning with River Bend under a 15-year lease (Fluidstack is the expected tenant and Google is expected to provide a financial backstop; initial delivery is targeted for Q2 2027), and runs Bitcoin mining through majority-owned American Bitcoin.

Supplies networking into AI datacenters: the 10-K ties Americas service provider and cloud growth to 'AI infrastructure revenue from webscale customers' and to Cisco Silicon One manufacturing commitments.

Products (share / barrier)
  • Cisco Silicon One and webscale AI infrastructure Challenger · Low source: sec.gov
  • Collaboration (Webex Suite, devices, Contact Center, CPaaS) Challenger · Low source: sec.gov
  • Networking (switching, routing, wireless, servers) Leader · Moderate source: sec.gov
  • Observability (Splunk Observability Suite, ThousandEyes) Niche · Moderate source: sec.gov
  • Security (Splunk TDR, SASE, network security) Top 3 · Moderate source: sec.gov
  • Technical support and services Leader · Deep source: sec.gov
Long-horizon vote +0.06 at weight 0.20 · swarm bearish

Editorial prior, not backtested.

see exactly how it voted →

-0.01 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

+0.13 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →