Skip to content

Compare moats

Up to three covered companies, band by band. Every call is a curated editorial judgment, never a disclosed figure — and every band carries its cited basis.

comparing TE Connectivity×Jabil×Cipher Mining× maximum of 3 — remove one to swap
TE Connectivity TEL ai moat: latest change 2025-11-10 Jabil JBL ai moat: latest change 2025-10-17 Cipher Mining CIFR ai moat: latest change 2026-02-24
Moat rating narrow

The FY2025 10-K's own Competition section undercuts any claim of insulation: 'The industries in which we operate are highly competitive, and we compete with thousands of companies that range from large multinational corporations to local manufacturers', competition is 'generally based on breadth of product offering, product innovation, price, quality, delivery, and service', and TE has 'experienced, and expect[s] to continue to experience, downward pressure on prices'. The same filing explicitly disclaims IP as the basis of its position: 'we do not believe that our competitive position or our operations are dependent upon or would be materially impacted by any single patent or group of related patents.' What TE does hold is durable rather than absolute — it calls itself 'one of the leading providers of advanced automobile connectivity solutions', its Industrial segment 'a leading supplier', and it converted that position into rising profitability across the same filing's three income statements (gross margin 31.5% of net sales in FY2023, 34.4% in FY2024, 35.2% in FY2025). A position that earns expanding margins into admitted price pressure is an advantage; one held against thousands of competitors and no decisive patent is not a wide one.

source: sec.gov

none

Jabil's FY2025 10-K (fiscal year ended August 31, 2025) says it plainly: "Our business is highly competitive, and our manufacturing processes are generally not subject to significant proprietary protection." It adds that "The significant purchasing power and market power of these competitors, many of which are large companies, has and could increase pricing and competitive pressures for us", that some "have substantially greater manufacturing, research and development (R&D) and marketing resources", and that customers "are continually evaluating the merits of manufacturing products internally against the advantages of outsourcing". Stored fundamentals from the 10-Ks show gross profit of $2,867 million on $34,702 million of revenue in fiscal 2023, $2,676 million on $28,883 million in fiscal 2024 and $2,646 million on $29,802 million in fiscal 2025. AI demand has since accelerated growth (fiscal 2026 net revenue of $36.0 billion, per the 2026-09-30 release), but growth is not protection, and the filing's own description is of an unprotected, competitive service. No moat is claimable.

source: sec.gov

none

Cipher (renamed Cipher Digital Inc. on 20 February 2026) holds signed, credit-supported leases but has not yet shown that they amount to a durable advantage. Its 2025 Form 10-K (filed 2026-02-24) says "Through the end of 2025, our revenue has been derived from mining bitcoin". Its Q2 2026 business update (2026-08-04, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/q226_earningsxprxdraftxvf.htm) reported "Q2 2026 Revenue of $25 million", and its first HPC rent began only in August 2026 at Black Pearl. The 10-K's own risk factors describe a contested market. They say "There has been an increasing number of businesses constructing HPC data centers, which has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive", that "our data centers are single-tenant properties", and that lessees "will have the right to terminate the lease if there are significant delays in the completion of construction". At Barber Lake, where the 10-K targeted Phase I delivery "by September 30, 2026", a September 2026 amendment, made "In connection with change orders and the continued evolution of tenant requirements", moved data-hall deliveries to the fourth quarter of 2026 through the first quarter of 2027. Under it, Cipher "will bear the first $359.3 million of costs in excess of the initial budgeted amount" (2026-09-25). There is real counter-evidence: a 15-year Amazon lease, a Google-backstopped Fluidstack lease whose contracted life a "leading AI lab" extended to 20 years, and a third lease with an investment-grade hyperscale tenant. Until that capacity is delivered and paying rent, though, a moat is not shown, so the band is none.

source: sec.gov

Moat type switching costs

The FY2025 10-K locates the advantage at the customer, not in patents. It describes 'close working relationships with many of our customers' whose 'relationships with them typically date back many years', and co-development as the mechanism: 'By working with our customers in developing new products and technologies, we believe we can identify and act on trends and leverage knowledge about next-generation technology across our products.' Roughly 75% of fiscal 2025 net sales were direct to manufacturers rather than through distribution, and the Transportation segment's products 'must withstand harsh conditions' — parts engineered in with the customer and built to survive the application, so the position sits inside the customer's design rather than in a purchase order. The filing rules the alternative out in its own words on intellectual property, so intangibles_ip is not the source; the 'thousands of companies' in Competition rules out efficient_scale.

source: sec.gov

none

The 10-K says "We currently have a relatively modest number of patents for various innovations" and that Jabil relies "largely upon a combination of intellectual property laws, non-disclosure agreements with our customers, employees, and suppliers and our internal security systems, policies, and procedures", with other proprietary-rights factors being "the knowledge and experience of our management and workforce". Its stated advantages are operating methods (customer-dedicated business units, "highly automated, continuous flow manufacturing", global production and centralized procurement), not lock-in: "In the past, some of our customers moved a portion of their manufacturing from us in order to more fully utilize their excess internal manufacturing capacity." On the Q4 FY2026 call (https://earningswhispers.com/transcript/JBL/Q42026) management described a build-to-customer-design model rather than proprietary platforms: "We help customers build the system they've designed with their silicon, their architecture, and whichever suppliers they choose."

source: sec.gov

none

No moat source is demonstrated yet. Switching costs are the most likely candidate, since the leases are long (15 years at Black Pearl; Barber Lake now a 20-year contracted life) and each site has a single tenant. But the 10-K says tenant guarantees "will only be effective after rent commencement under such leases and are subject to certain limitations", and by August 2026 rent had begun at only one site. The advantages the 10-K claims are the company's own. It speaks of "industry-leading expertise in originating and securing industrial-scale, greenfield data center sites" and of securing West Texas land "on more favorable terms than in more established data center markets". The same document says "there is significant competition for power capacity and energized facilities". Intellectual property is modest: "four granted United States patents and one issued patent in Taiwan". With 66 full-time employees, Cipher has no scale advantage over the competitors it names: CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers.

source: sec.gov

Leadership co leader

The FY2025 10-K claims leadership in qualified form and then names the peers who contest it. Transportation Solutions 'is a leader in connectivity and sensor technologies' and TE is 'one of the leading providers of advanced automobile connectivity solutions' — one of, not the — while the segment's 'major competitors include Yazaki, Aptiv, Sumitomo, Sensata, Honeywell, Molex, and Amphenol'. Industrial Solutions 'is a leading supplier of products that connect and distribute power, data, and signals' and 'competes primarily against Amphenol, Hubbell, Carlisle Companies, Integer Holdings, Molex, Omron, JST, and Korea Electric Terminal (KET)'. Amphenol and Molex appear on both lists, so TE shares the top of the interconnect market rather than owning it.

source: sec.gov

at parity

The 10-K calls Jabil "one of the leading providers of engineering, manufacturing, and supply chain solutions" and claims no rank. Independently, EMSNOW/in4ma's "EMS&ODM Global 100" (2026-03-06, https://www.emsnow.com/?p=53535) groups Jabil with Flex, Celestica and Sanmina as the US "big four", "representing about 85% of the revenue base among ~20 US headquartered EMS/ODM", while Wistron, Quanta and Wiwynn "plus Foxconn together account for nearly 57% of global EMS/ODM production". The 10-K concedes some competitors have "substantially greater manufacturing, research and development (R&D) and marketing resources". Among the largest Western contract manufacturers but behind the Taiwanese leaders in scale: at parity, not a leader.

source: sec.gov

fast follower

No independent share or rank was found. The 10-K names CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers as competitors, along with miners that have "signed leases with hyperscalers and HPC tenants": Hut 8, IREN, TeraWulf, Core Scientific and Applied Digital. Cipher has signed hyperscale-grade tenants (Amazon; Fluidstack with a Google backstop; a third investment-grade hyperscaler) but delivered its first HPC capacity only in August 2026 (Q2 2026 update). That makes it a fast follower. Its self-description as "a leading developer, owner, and operator of industrial-scale data centers" is the company's own claim and is not counted.

source: sec.gov

Pricing power moderate

The FY2025 10-K states both halves plainly: TE has 'experienced, and expect[s] to continue to experience, downward pressure on prices. However, as a result of increased costs and tariffs, certain of our businesses implemented price increases in recent years.' Pass-through, not price-setting. The realised result is margin expansion rather than erosion — gross margin of 31.5% of net sales in FY2023, 34.4% in FY2024 and 35.2% in FY2025 per the same filing's income statements, and 36.5% ($5,319M on $14,573M) for the nine months to 26 June 2026 versus 35.3% a year earlier, with Q3 FY2026 GAAP operating margin of 19%, per the 22 July 2026 results release (https://www.sec.gov/Archives/edgar/data/1385157/000110465926085589/tel-20260722xex99d1.htm). Strong would require pricing that leads rather than follows cost; weak is contradicted by three years of expanding gross margin.

source: sec.gov

weak

Stored fundamentals show gross profit of $2,867 million on $34,702 million of revenue in fiscal 2023, $2,676 million on $28,883 million in fiscal 2024 and $2,646 million on $29,802 million in fiscal 2025. The 10-K says "Most of our significant long-term customer contracts permit quarterly or other periodic prospective adjustments to pricing based on decreases and increases in component prices and other factors", so component costs largely pass through, while competitors may "be better positioned to compete on price for their services". Management's fiscal 2027 outlook is a core operating margin (non-GAAP) of 6.1% (release, https://www.sec.gov/Archives/edgar/data/898293/000162828026063890/jbl-20260930ex991.htm).

source: sec.gov

weak

The 10-K says competition "has resulted in increasing competition and pricing pressure that may cause us to reduce our pricing in order to remain competitive". It adds that if customers cut usage "we may be compelled to lower our prices or risk losing a significant customer". At Barber Lake, Cipher agreed to absorb "the first $359.3 million of costs in excess of the initial budgeted amount", with the tenant reimbursing "50% of any such costs above that amount" (2026-09-25, Exhibit 99.1, https://www.sec.gov/Archives/edgar/data/1819989/000181998926000043/barberlakeleaseamendmentpr.htm). Its one input-cost edge is specific to mining: Odessa's power costs about 2.8 c/kWh under the Luminant contract, available "until at least July 2027". A landlord that concedes cost overruns to its tenants has weak pricing power.

source: sec.gov

Summary

TE Connectivity sells the connectors, terminals, sensors and cable-protection parts that, in its own framing, 'enable the distribution of power, signal, and data' — a component vendor, never a system or compute vendor. The FY2025 10-K puts the two reportable segments, Transportation Solutions (54% of net sales) and Industrial Solutions (46%), against a combined served market it estimates at roughly $200 billion, which tells you immediately that no single share number governs this business: the filing discloses no market share, says 'no single customer accounted for a significant amount of our net sales in fiscal 2025, 2024, or 2023', and states that because TE is 'not organized by product or service, it is not practicable to disclose net sales by product or service'. The defensible part is entrenchment. Parts get designed in with the customer and then qualified to survive automotive, aerospace, subsea and grid conditions; TE sells about 75% of net sales direct into ~130 countries; relationships 'typically date back many years'. That is a switching-cost moat, and the filing is unusually candid that it is not a patent moat — no single patent or group of patents is material to its competitive position. The limit is equally plain in the filing: highly competitive industries, thousands of competitors, and persistent downward price pressure, with Amphenol and Molex named as competitors in BOTH segments and Yazaki, Aptiv and Sumitomo heading the Transportation segment's competitor list. The evidence that the moat is nonetheless working is margin plus mix. Gross margin ran 31.5% / 34.4% / 35.2% of net sales across FY2023-FY2025, and in the nine months to 26 June 2026 gross margin was $5,319M on $14,573M of net sales (36.5%) against $4,419M on $12,513M (35.3%) a year earlier, while Q3 FY2026 GAAP operating margin was 19% and orders hit a record $5.7 billion, up 27% year over year. Growth has also rotated: digital data networks grew 34.2% in Q3 FY2026 (34.0% organic) and 48.8% over nine months, with the CEO naming 'increased momentum in AI in both the data center and across the broader energy infrastructure' — while sensors, an end market for which the 10-K makes no leadership claim at all, shrank 2.8% organically in the quarter. Narrow, not wide: a real toll on other people's platforms, collected under admitted price pressure.

Jabil provides engineering, manufacturing and supply chain services through three segments. Per its FY2025 10-K, Intelligent Infrastructure serves "capital equipment, cloud and data center infrastructure, and networking and communications" customers; Regulated Industries serves automotive and transportation, healthcare and packaging, and renewables and energy infrastructure; and Connected Living and Digital Commerce is focused on "digitalization and automation, including warehouse automation and robotics". AI demand now drives growth: the fiscal 2026 release (2026-09-30) reports net revenue of $36.0 billion, with the CEO saying Jabil "grew revenue 21%, expanded core operating margin 40 basis points", and on the Q4 FY2026 call management said "AI-related revenue was up 60% year-over-year", that Jabil "ended the year with four customers with AI related revenue above a billion dollars annually", and that it expects cloud and data center infrastructure revenue of "approximately $17.5 billion" in fiscal 2027. The 10-K shows the limits: the five largest customers were approximately 36% of fiscal 2025 revenue and one customer, reported primarily in Intelligent Infrastructure, 16%; manufacturing processes are "generally not subject to significant proprietary protection"; and competitors may "be willing or able to make sales or provide services at lower margins than we do". An independent tally (EMSNOW/in4ma, 2026-03-06) counts Jabil among the US "big four" EMS providers while putting Foxconn, Wistron, Quanta and Wiwynn at "nearly 57% of global EMS/ODM production". A large, fast-growing contractor without a protected position.

Cipher built bitcoin mining data centres in Texas and is now developing single-tenant AI and HPC campuses for lease to hyperscalers. Its 10-K reports a portfolio of "4.2 gigawatts ("GW") of capacity across 10 sites". It lists a 15-year Amazon Web Services lease for about 300 MW of turnkey capacity at Black Pearl and a Fluidstack lease at Barber Lake (300 MW gross) under which Google "has agreed to backstop certain obligations of Fluidstack". It describes bitcoin mining at Odessa on a Luminant power contract at about 2.8 c/kWh. In 2026 it signed a third campus lease "with an investment-grade Hyperscale tenant" (Q1 2026 update, 2026-05-05), delivered first Black Pearl capacity in August "two months ahead of the original schedule" with rent commenced, and fully funded its Stingray development with a bond (Q2 2026 update). On 2026-09-25 it said Barber Lake's contracted life was extended from 10 to 20 years, taking contracted revenue at the site "from $3.8 billion to over $9 billion". The 10-K says Odessa was "the first bitcoin mining data center awarded the Management and Operations, or M&O, Stamp of Approval award from the Uptime Institute", which is independent recognition of how the company operates. Against this, the latest quarter's revenue was still bitcoin mining and fell to $25 million. The 10-K describes growing "competition and pricing pressure", single-tenant concentration, and termination rights for construction delays. The Barber Lake schedule was reset, and Cipher absorbs the first $359.3 million of cost overruns. Cipher's contracted pipeline is substantial, but a competitive advantage is not yet demonstrated, so it is rated as having no moat. That could change to narrow once its leased campuses are delivered and paying rent.

Chain position

TE is an upstream component supplier to the AI build-out, not a participant in compute. It sells 'connectivity and sensor solutions [that] enable the distribution of power, signal, and data to advance next-generation transportation, energy networks, automated factories, data centers enabling artificial intelligence', about 75% of it direct to manufacturers across roughly 130 countries. AI exposure runs through one end market: digital data networks was 28% of Industrial Solutions, and Industrial Solutions was 46% of fiscal 2025 net sales — so the datacenter line is a minority of a company still 54% transportation. That minority is where the growth now is: digital data networks net sales rose 34.2% in Q3 FY2026 and 48.8% over the nine months, and energy rose 34.4% in the quarter, the CEO tying both to AI momentum 'in both the data center and across the broader energy infrastructure' (https://www.sec.gov/Archives/edgar/data/1385157/000110465926085589/tel-20260722xex99d1.htm).

Contract manufacturer for cloud, networking, semiconductor-equipment, automotive, healthcare and consumer customers. On the Q4 FY2026 call management said "Others in the industry are building product companies around their own power and cooling platforms and asking customers to standardize on them. That's a legitimate model. Ours is different."

Cipher develops single-tenant, powered data-centre campuses for hyperscale and AI tenants: Amazon at Black Pearl, Fluidstack (backstopped by Google) at Barber Lake, and an unnamed investment-grade hyperscaler at a third campus. Meanwhile it winds down bitcoin mining.

Products (share / barrier)
  • Bitcoin mining (Odessa) Unknown · Low source: sec.gov
  • HPC data center leasing (Black Pearl, Barber Lake, Stingray) Challenger · Moderate source: sec.gov
Long-horizon vote +0.13 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

-0.06 at weight 0.20 · swarm neutral

Editorial prior, not backtested.

see exactly how it voted →

-0.06 at weight 0.20 · swarm bearish

Editorial prior, not backtested.

see exactly how it voted →